X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644032809060

Well Details

Well ID: 0644032809060
Loading map...
Location: 06/09-28-064-03W4/0
Location Alias: 06/09-28-64-03 W4M
Location Alias 2: 06/09-28-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 28
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP 01 V03-11 COLDLK 9-28-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0253947
License Date: 2001-04-11
License Status: Issued
Spud Date: 2002-07-19
Final Drill Date: 2002-07-20
Well Total Depth: 509.00 m
Surface Hole Latitude: 54.567490
Surface Hole Longitude: -110.386563

For data sources see[1][2]

Well History

Date Event
2001-04-11 Obtained License
2002-07-20 Direction Drilling Operation Performed - Deviate
2002-07-20 Finished Drilling
2002-07-20 Production Casing Operation Performed
2002-07-20 Well Log Performed
2002-07-21 Rig Released
2002-07-21 Well Mode changed to Drilled and Cased
2002-08-24 Well Log Performed
2002-09-13 Perforation Treatment Performed - Jet Perforation
2002-09-13 Well Log Performed
2003-05-06 Well Began Production
2003-05-06 Well Fluid changed to Crude Bitumen
2003-05-06 Well Type changed to Cyclical
2011-04-01 Well Log Performed
2011-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-14 Well Log Performed
2014-06-16 Production Casing Operation Performed
2014-09-29 Perforation Treatment Performed - Jet Perforation
2015-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-07-20 316.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-09-13 Perforation 500.50 504.50 13
2011-04-07 Packing Device Capped w/Cement 426.00 430.50 0
2014-09-29 Perforation 500.50 504.50 13
2015-07-07 Acid Treatment 500.50 504.50 0
2016-09-09 Acid Treatment 500.50 504.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4321 0.0 0.0 0.0
2004 6276 0.0 0.0 0.0
2005 7040 0.0 0.0 0.0
2006 6795 0.0 0.0 0.0
2007 6715 0.0 0.0 0.0
2008 6162 0.0 0.0 0.0
2009 8163 0.0 0.0 0.0
2010 7151 0.0 0.0 0.0
2011 1880 0.0 0.0 0.0
2014 358 0.0 0.0 0.0
2015 6342 0.0 0.0 0.0
2016 7118 0.0 0.0 0.0
2017 8007 0.0 0.0 0.0
2018 6293 0.0 0.0 0.0
2019 7725 0.0 0.0 0.0
2020 1914 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-14 No Incident Encountered 0.00 0.00
2015-07-07 No Incident Encountered 0.00 0.00
2016-09-09 No Incident Encountered 0.00 0.00

For data sources see[7]

References