X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644032812W00

Well Details

Well ID: 0644032812W00
Loading map...
Location: W0/12-28-064-03W4/0
Location Alias: W0/12-28-64-03 W4M
Location Alias 2: W0/12-28-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 28
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP 02 T11-15 COLDLK 12-28-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0268190
License Date: 2002-03-01
License Status: Amended
Spud Date: 2002-10-04
Final Drill Date: 2002-10-05
Well Total Depth: 533.00 m
Surface Hole Latitude: 54.567527
Surface Hole Longitude: -110.409315

For data sources see[1][2]

Well History

Date Event
2002-03-01 Obtained License
2002-10-04 Direction Drilling Operation Performed - Deviate
2002-10-05 Finished Drilling
2002-10-05 Rig Released
2002-10-05 Well Log Performed
2002-10-05 Well Mode changed to Drilled and Cased
2002-10-30 Well Log Performed
2002-11-01 Perforation Treatment Performed - Jet Perforation
2003-04-01 Well Began Production
2003-04-01 Well Fluid changed to Crude Bitumen
2003-04-01 Well Type changed to Cyclical
2004-04-13 Perforation Treatment Performed - Bridge Plug No Cement Required
2004-04-14 Perforation Treatment Performed - Jet Perforation
2013-01-16 Well Log Performed
2013-01-17 Well Log Performed
2013-01-19 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2014-10-19 Perforation Treatment Performed - Jet Perforation
2019-04-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-04-20 Production Casing Operation Performed
2019-05-08 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-10-04 34.70 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-11-01 Perforation 523.00 527.00 13
2004-04-13 Bridge Plug, No Cement 517.50 518.00 0
2004-04-14 Perforation 511.00 515.00 13
2013-01-19 Packing Dev Cpd w/Res-Gyp Cem 471.70 477.20 0
2014-10-19 Perforation 511.00 527.00 14
2019-04-18 Packing Device Capped w/Cement 467.50 506.00 0
2019-05-08 Perforation 511.00 515.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2858 0.0 0.0 0.0
2004 6103 0.0 0.0 0.0
2005 7902 0.0 0.0 0.0
2006 5927 0.0 0.0 0.0
2007 5413 0.0 0.0 0.0
2008 6998 0.0 0.0 0.0
2009 6080 0.0 0.0 0.0
2010 8471 0.0 0.0 0.0
2011 6328 0.0 0.0 0.0
2012 8023 0.0 0.0 0.0
2013 323 0.0 0.0 0.0
2014 715 0.0 0.0 0.0
2015 4908 0.0 0.0 0.0
2016 7642 0.0 0.0 0.0
2017 4550 0.0 0.0 0.0
2018 7817 0.0 0.0 0.0
2019 2083 0.0 0.0 0.0
2020 1983 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-21 No Incident Encountered 0.00 0.00
2014-10-19 No Incident Encountered 0.00 0.00
2019-04-21 No Incident Encountered 0.00 0.00
2019-05-19 No Incident Encountered 0.00 0.00

For data sources see[7]

References