X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644032902000

Well Details

Well ID: 0644032902000
Loading map...
Location: 00/02-29-064-03W4/0
Location Alias: 00/02-29-64-03 W4M
Location Alias 2: 00/02-29-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 29
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP 02 T12-22 COLDLK 2-29-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0268230
License Date: 2002-03-01
License Status: Issued
Spud Date: 2002-08-11
Final Drill Date: 2002-08-12
Well Total Depth: 659.00 m
Surface Hole Latitude: 54.563863
Surface Hole Longitude: -110.425612

For data sources see[1][2]

Well History

Date Event
2002-03-01 Obtained License
2002-08-11 Direction Drilling Operation Performed - Deviate
2002-08-12 Finished Drilling
2002-08-12 Production Casing Operation Performed
2002-08-12 Rig Released
2002-08-12 Well Log Performed
2002-08-12 Well Mode changed to Drilled and Cased
2002-09-28 Well Log Performed
2002-09-29 Perforation Treatment Performed - Jet Perforation
2002-09-29 Well Log Performed
2003-04-01 Well Began Production
2003-04-01 Well Fluid changed to Crude Bitumen
2003-04-01 Well Type changed to Cyclical
2006-03-20 Perforation Treatment Performed - Jet Perforation
2006-03-20 Well Log Performed
2010-08-08 Well Log Performed
2012-11-28 Well Log Performed
2015-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-06-25 Production Casing Operation Performed
2015-08-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-08-11 392.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-09-29 Perforation 643.00 647.00 13
2006-03-20 Perforation 630.00 636.00 20
2015-06-19 Packing Device Capped w/Cement 615.40 619.20 0
2015-08-05 Perforation 630.00 636.00 20
2015-08-05 Perforation 643.00 647.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 5549 0.0 0.0 0.0
2004 7977 0.0 0.0 0.0
2005 7955 0.0 0.0 0.0
2006 7563 0.0 0.0 0.0
2007 5972 0.0 0.0 0.0
2008 8045 0.0 0.0 0.0
2009 7477 0.0 0.0 0.0
2010 7480 0.0 0.0 0.0
2011 8160 0.0 0.0 0.0
2012 4717 0.0 0.0 0.0
2013 7556 0.0 0.0 0.0
2014 6748 0.0 0.0 0.0
2015 3837 0.0 0.0 0.0
2016 8344 0.0 0.0 0.0
2017 8640 0.0 0.0 0.0
2018 8549 0.0 0.0 0.0
2019 5503 0.0 0.0 0.0
2020 72 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-27 No Incident Encountered 0.00 0.00
2015-08-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References