X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644033016020

Well Details

Well ID: 0644033016020
Loading map...
Location: 02/16-30-064-03W4/0
Location Alias: 02/16-30-64-03 W4M
Location Alias 2: 02/16-30-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 30
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP 01 T10-10 COLDLK 16-30-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0248821
License Date: 2001-01-11
License Status: Issued
Spud Date: 2002-02-09
Final Drill Date: 2002-02-10
Well Total Depth: 512.00 m
Surface Hole Latitude: 54.571642
Surface Hole Longitude: -110.438552

For data sources see[1][2]

Well History

Date Event
2001-01-11 Obtained License
2002-02-09 Direction Drilling Operation Performed - Deviate
2002-02-10 Finished Drilling
2002-02-10 Well Log Performed
2002-02-11 Rig Released
2002-02-11 Well Mode changed to Drilled and Cased
2002-04-07 Well Log Performed
2002-05-05 Perforation Treatment Performed - Jet Perforation
2002-05-05 Well Log Performed
2002-11-01 Well Began Production
2002-11-01 Well Fluid changed to Crude Bitumen
2002-11-01 Well Type changed to Cyclical
2004-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-05 Perforation Treatment Performed - Jet Perforation
2004-02-05 Well Log Performed
2012-06-11 Well Log Performed
2013-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-02-08 Production Casing Operation Performed
2018-12-07 Well Log Performed
2019-03-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-02-09 34.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-05-05 Perforation 503.00 507.00 13
2004-02-04 Packing Device Capped w/Cement 496.00 500.00 0
2004-02-05 Perforation 486.00 490.00 13
2013-11-06 Acid Treatment 486.00 490.00 0
2019-03-05 Perforation 486.00 490.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 0 0.0 0.0 0.0
2003 8152 0.0 0.0 0.0
2004 6669 0.0 0.0 0.0
2005 8616 0.0 0.0 0.0
2006 6730 0.0 0.0 0.0
2007 6651 0.0 0.0 0.0
2008 7856 0.0 0.0 0.0
2009 5281 0.0 0.0 0.0
2010 6121 0.0 0.0 0.0
2011 8101 0.0 0.0 0.0
2012 7935 0.0 0.0 0.0
2013 6432 0.0 0.0 0.0
2014 1593 0.0 0.0 0.0
2019 2429 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-06 No Incident Encountered 0.00 0.00
2018-12-10 No Incident Encountered 0.00 0.00
2019-03-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References