X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0644033106070

Well Details

Well ID: 0644033106070
Loading map...
Location: 07/06-31-064-03W4/0
Location Alias: 07/06-31-64-03 W4M
Location Alias 2: 07/06-31-064-03 W4/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 4
Range: 03
Section: 31
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: IMP 99 Y36-19 COLDLK 6-31-64-3
Operator Name: Imperial Oil Resources Limited
License Number: 0224573
License Date: 1999-07-20
License Status: Issued
Spud Date: 2000-01-22
Final Drill Date: 2000-01-22
Well Total Depth: 573.00 m
Surface Hole Latitude: 54.579577
Surface Hole Longitude: -110.449557

For data sources see[1][2]

Well History

Date Event
1999-07-20 Obtained License
2000-01-22 Direction Drilling Operation Performed - Deviate
2000-01-22 Finished Drilling
2000-01-22 Production Casing Operation Performed
2000-01-22 Well Log Performed
2000-01-23 Rig Released
2000-01-23 Well Mode changed to Drilled and Cased
2000-02-28 Well Log Performed
2000-03-10 Perforation Treatment Performed - Jet Perforation
2000-10-19 Well Began Production
2000-10-19 Well Fluid changed to Crude Bitumen
2000-10-19 Well Type changed to Cyclical
2004-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-04-01 Perforation Treatment Performed - Jet Perforation
2006-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-01-17 Perforation Treatment Performed - Chemical Squeeze
2013-03-30 Well Log Performed
2014-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-01-22 43.60 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-10 Perforation 561.00 563.00 13
2019-06-03 Acid Treatment 549.00 553.00 0
2000-03-10 Perforation 563.00 567.00 7
2004-03-31 Packing Device Capped w/Cement 558.00 560.00 0
2004-04-01 Perforation 549.00 553.00 13
2006-11-13 Acid Treatment 549.00 553.00 0
2007-01-05 Acid Treatment 549.00 553.00 0
2007-01-17 Chemical Squeeze 549.00 553.00 0
2014-12-18 Acid Treatment 549.00 553.00 0
2015-02-26 Acid Treatment 549.00 553.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 812 0.0 0.0 0.0
2001 6155 0.0 0.0 0.0
2002 6661 0.0 0.0 0.0
2003 6118 0.0 0.0 0.0
2004 7025 0.0 0.0 0.0
2005 7064 0.0 0.0 0.0
2006 6020 0.0 0.0 0.0
2007 8254 0.0 0.0 0.0
2008 3739 0.0 0.0 0.0
2009 8713 0.0 0.0 0.0
2010 6899 0.0 0.0 0.0
2011 7163 0.0 0.0 0.0
2012 6667 0.0 0.0 0.0
2013 4506 0.0 0.0 0.0
2014 5822 0.0 0.0 0.0
2015 7886 0.0 0.0 0.0
2016 7032 0.0 0.0 0.0
2017 7075 0.0 0.0 0.0
2018 7575 0.0 0.0 0.0
2019 6702 0.0 0.0 0.0
2020 1409 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-18 No Incident Encountered 0.00 0.00
2015-02-26 No Incident Encountered 0.00 0.00
2019-06-03 No Incident Encountered 0.00 0.00

For data sources see[7]

References