If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0644212003002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.545535,"lon":-113.143823,"icon":""}]} |
Location: 00/03-20-064-21W4/2 | |
Location Alias: 00/03-20-64-21 W4M | |
Location Alias 2: 00/03-20-064-21 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 4 | |
Range: 21 | |
Section: 20 | |
County/Municipality: Athabasca County | |
Well Name: VERMILION ELSCT 3-20-64-21 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0144318 | |
License Date: 1990-05-31 | |
License Status: Abandoned | |
Spud Date: 1990-06-12 | |
Final Drill Date: 1990-06-15 | |
Well Total Depth: 764.00 m | |
Surface Hole Latitude: 54.545535 | |
Surface Hole Longitude: -113.143823 |
Date | Event |
---|---|
1990-05-31 | Obtained License |
1990-06-13 | Surface Casing Operation Performed |
1990-06-15 | Drill Stem Test Performed |
1990-06-15 | Finished Drilling |
1990-06-15 | Well Log Performed |
1990-06-15 | Well Mode changed to Drilled and Cased |
1990-06-16 | Drill Stem Test Performed |
1990-06-16 | Production Casing Operation Performed |
1990-06-17 | Rig Released |
1990-07-30 | Perforation Treatment Performed - Jet Perforation |
1990-07-31 | Perforation Treatment Performed - Jet Perforation |
1990-08-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-08-01 | Perforation Treatment Performed - Jet Perforation |
1990-08-01 | Plug Back Performed |
1991-09-18 | Perforation Treatment Performed - Jet Perforation |
1991-10-01 | Well Began Production |
1991-10-01 | Well Fluid changed to Gas |
1991-10-01 | Well Mode changed to Flowing |
1992-09-01 | Well Fluid changed to Gas |
1992-09-01 | Well Mode changed to Suspended |
1996-01-01 | Well Fluid changed to Gas |
1996-01-01 | Well Mode changed to Flowing |
1996-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-03-10 | Plug Back Performed |
1996-03-10 | Well Fluid changed to Gas |
1996-03-10 | Well Mode changed to Abandoned Zone |
1996-04-15 | Well Fluid changed to Gas |
1996-04-15 | Well Mode changed to Abandoned and Re-entered |
2008-07-26 | Well Log Performed |
2008-08-18 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-07-30 | Perforation | 748.00 | 750.00 | 13 |
1990-07-31 | Perforation | 740.50 | 741.50 | 13 |
1990-08-01 | Packing Device Capped w/Cement | 730.00 | 738.00 | 0 |
1990-08-01 | Perforation | 692.00 | 693.50 | 13 |
1991-09-18 | Perforation | 604.00 | 606.00 | 13 |
1996-03-10 | Packing Device Capped w/Cement | 677.00 | 685.00 | 0 |
1996-03-10 | Packing Device Capped w/Cement | 594.00 | 602.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 1912 | 0.0 | 0.0 | 0.0 |
1992 | 3665 | 0.0 | 0.0 | 0.0 |
1996 | 491 | 0.0 | 0.0 | 0.0 |
For data sources see[5]