X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0665183104000

Well Details

Well ID: 0665183104000
Loading map...
Location: 00/04-31-066-18W5/0
Location Alias: 00/04-31-66-18 W5M
Location Alias 2: 00/04-31-066-18 W5/00
Country: Canada
Province: Alberta
Township: 066
Meridian: 5
Range: 18
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 4-31-66-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0026020
License Date: 1964-04-27
License Status: Abandoned
Spud Date: 1964-06-05
Final Drill Date: 1964-06-27
Well Total Depth: 2828.50 m
Surface Hole Latitude: 54.750676
Surface Hole Longitude: -116.719364

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-04-27 Obtained License
1964-06-18 Lost Circulation Occurred
1964-06-27 Finished Drilling
1964-06-29 Production Casing Operation Performed
1964-07-05 Perforation Treatment Performed - Jet Perforation
1964-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-10 Perforation Treatment Performed - Jet Perforation
1964-07-23 Perforation Treatment Performed - Cement Squeeze
1964-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-26 Perforation Treatment Performed - Jet Perforation
1964-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-08-01 Perforation Treatment Performed - Jet Perforation
1964-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-06 Perforation Treatment Performed - Cement Squeeze
1964-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-12 Perforation Treatment Performed - Jet Perforation
1964-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-16 Perforation Treatment Performed - Jet Perforation
1964-11-02 Well Mode changed to Drilled and Cased
1965-10-28 Perforation Treatment Performed - Cement Squeeze
1965-11-04 Perforation Treatment Performed - Cement Squeeze
1965-11-16 Perforation Treatment Performed - Jet Perforation
1965-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-03 Perforation Treatment Performed - Jet Perforation
1966-11-05 Perforation Treatment Performed - Jet Perforation
1966-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-07 Perforation Treatment Performed - Acid Wash - No Pressure
1966-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-07-09 Well Began Injection
1968-07-09 Well Fluid changed to Water
1968-07-09 Well Type changed to Injection
1968-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-04 Perforation Treatment Performed - Fractured
1993-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-31 Well Fluid changed to Water
1993-08-31 Well Mode changed to Suspended
1993-08-31 Well Type changed to Injection
2005-02-27 Well Log Performed
2005-03-04 Perforation Treatment Performed - Jet Perforation
2005-03-04 Well Log Performed
2005-03-06 Perforation Treatment Performed - Cement Plug
2005-03-06 Perforation Treatment Performed - Remedial Casing
2005-03-06 Plug Back Performed
2005-03-06 Well Fluid changed to Water
2005-03-06 Well Mode changed to Abandoned Zone
2005-03-06 Well Type changed to Injection
2005-03-07 Well Abandoned
2005-03-07 Well Fluid changed to Water
2005-03-07 Well Mode changed to Abandoned
2005-03-07 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-07-05 Perforation 2817.00 2820.00 7
1964-08-01 Perforation 2791.10 2792.60 7
1964-08-02 Acid Treatment 2788.00 2792.60 0
1964-08-06 Cement Squeeze 2788.00 2792.60 0
1964-08-12 Perforation 2781.30 2782.80 7
1964-08-12 Acid Treatment 2781.30 2782.80 0
1964-08-16 Perforation 2162.90 2166.50 7
1964-08-16 Acid Treatment 2162.90 2166.50 0
1965-10-28 Cement Squeeze 2162.90 2166.50 0
1965-11-04 Cement Squeeze 2781.30 2782.80 0
1965-11-16 Perforation 2796.20 2797.50 7
1964-07-07 Acid Treatment 2817.00 2820.00 0
1965-11-16 Perforation 2799.30 2800.20 7
1965-11-16 Perforation 2793.80 2795.00 0
1965-11-17 Acid Treatment 2793.80 2800.20 0
1966-11-03 Perforation 2816.40 2821.20 7
1966-11-03 Perforation 2801.10 2804.20 7
1966-11-03 Perforation 2788.00 2792.60 7
1966-11-05 Perforation 2781.60 2788.00 7
1966-11-07 Acid Treatment 2801.10 2821.20 0
1966-11-07 Acid Wash 2781.60 2821.20 0
1966-11-07 Acid Treatment 2781.60 2821.20 0
1964-07-10 Perforation 2799.60 2804.20 7
1966-11-09 Acid Treatment 2816.40 2821.20 0
1966-11-11 Acid Treatment 2816.40 2821.20 0
1968-12-17 Acid Treatment 2781.60 2792.60 0
1968-12-17 Acid Treatment 2801.10 2804.20 0
1968-12-17 Acid Treatment 2816.40 2821.20 0
1969-04-17 Acid Treatment 2781.60 2821.20 0
1979-09-28 Acid Treatment 2781.60 2826.50 0
1982-12-04 Fracture 2781.60 2826.50 0
1993-02-12 Packing Device Capped w/Cement 2766.00 2774.00 0
2005-03-04 Perforation 626.50 627.50 13
1964-07-10 Acid Treatment 2799.60 2804.20 0
2005-03-04 Perforation 603.60 604.60 13
2005-03-04 Perforation 533.00 534.00 13
2005-03-04 Perforation 429.50 430.50 13
2005-03-04 Perforation 393.00 394.00 13
2005-03-04 Perforation 352.00 353.00 13
2005-03-04 Perforation 329.50 330.50 13
2005-03-06 Remedial Casing Cementing 329.50 330.50 0
2005-03-06 Cement Plug 299.80 650.00 0
1964-07-23 Cement Squeeze 2799.60 2804.20 0
1964-07-26 Perforation 2799.30 2801.10 7
1964-07-26 Acid Treatment 2799.30 2801.10 0
1964-07-30 Packing Device Capped w/Cement 2798.10 2801.10 0
1964-08-01 Perforation 2788.00 2790.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1964-06-18 Lost Circulation 1737.30 2247.50

For data sources see[6]

References