If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0666081616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.71794,"lon":-119.13645,"icon":""}]} |
Location: 00/16-16-066-08W6/0 | |
Location Alias: 00/16-16-66-08 W6M | |
Location Alias 2: 00/16-16-066-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 6 | |
Range: 08 | |
Section: 16 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: OMERS ENERGY HZ WAPITI 16-16-66-8 | |
Operator Name: Gain Energy Ltd. | |
License Number: 0430514 | |
License Date: 2011-01-24 | |
License Status: Amended | |
Spud Date: 2011-03-01 | |
Final Drill Date: 2011-03-08 | |
Well Total Depth: 2465.00 m | |
Surface Hole Latitude: 54.717940 | |
Surface Hole Longitude: -119.136450 |
Date | Event |
---|---|
2011-01-24 | Obtained License |
2011-03-03 | Surface Casing Operation Performed |
2011-03-08 | Finished Drilling |
2011-03-09 | Plug Back Performed |
2011-03-23 | Well Mode changed to Abandoned and Whipstocked |
2011-03-26 | Rig Released |
2011-08-12 | Well Log Performed |
2011-08-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-08-19 | Multi-Stage Fracture | 2450.70 | 2450.80 | 0 |
2011-08-22 | Multi-Stage Fracture | 2307.00 | 2307.10 | 0 |
2011-08-22 | Multi-Stage Fracture | 2232.50 | 2232.60 | 0 |
2011-08-22 | Multi-Stage Fracture | 2158.50 | 2158.60 | 0 |
2011-08-26 | Multi-Stage Fracture | 2084.10 | 2084.20 | 0 |
2011-08-26 | Multi-Stage Fracture | 1826.20 | 1826.30 | 0 |
2011-08-26 | Multi-Stage Fracture | 1751.90 | 1752.00 | 0 |
2011-08-26 | Multi-Stage Fracture | 1666.40 | 1666.50 | 0 |
2011-08-26 | Multi-Stage Fracture | 1592.40 | 1592.50 | 0 |
For data sources see[4]