X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675180404000

Well Details

Well ID: 0675180404000
Loading map...
Location: 00/04-04-067-18W5/0
Location Alias: 00/04-04-67-18 W5M
Location Alias 2: 00/04-04-067-18 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 18
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 4-4-67-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0024922
License Date: 1963-10-07
License Status: Suspension
Spud Date: 1963-12-06
Final Drill Date: 1964-01-09
Well Total Depth: 2877.00 m
Surface Hole Latitude: 54.765261
Surface Hole Longitude: -116.692687

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-07 Obtained License
1964-01-04 Lost Circulation Occurred
1964-01-09 Finished Drilling
1964-01-09 Well Mode changed to Drilled and Cased
1964-01-11 Production Casing Operation Performed
1964-01-13 Well Log Performed
1964-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-14 Perforation Treatment Performed - Jet Perforation
1964-01-14 Well Began Production
1964-01-14 Well Fluid changed to Crude Oil
1964-01-14 Well Mode changed to Flowing
1973-11-17 Well Fluid changed to Crude Oil
1973-11-17 Well Mode changed to Pumping
1974-06-22 Perforation Treatment Performed - Cement Squeeze
1974-06-22 Well Log Performed
1974-06-23 Perforation Treatment Performed - Jet Perforation
1984-02-03 Well Log Performed
1984-02-09 Perforation Treatment Performed - Jet Perforation
1984-02-09 Well Fluid changed to Crude Oil
1984-02-09 Well Mode changed to Suspended
1984-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-11 Well Began Injection
1984-04-11 Well Fluid changed to Water
1984-04-11 Well Type changed to Injection
1993-08-31 Well Fluid changed to Water
1993-08-31 Well Mode changed to Suspended
1993-08-31 Well Type changed to Injection
1993-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-15 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-01-14 Perforation 2802.30 2805.40 7
1993-10-15 Packing Device Capped w/Cement 2749.00 2757.00 0
1964-01-14 Perforation 2806.60 2807.80 7
1964-01-14 Acid Treatment 2802.30 2807.80 0
1974-06-22 Cement Squeeze 2802.30 2807.80 0
1974-06-23 Perforation 2795.00 2796.80 13
1984-02-09 Perforation 2795.00 2799.90 13
1984-02-09 Perforation 2802.00 2807.80 13
1984-02-09 Perforation 2831.90 2833.10 13
1984-02-11 Acid Treatment 2795.00 2833.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1968 1338 0.0 0.0 0.0
1969 5237 0.0 0.0 0.0
1970 5381 0.0 0.0 0.0
1971 3555 0.0 0.0 0.0
1972 498 0.0 0.0 0.0
1974 3257 0.0 0.0 0.0
1975 1083 0.0 0.0 0.0
1976 544 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1964-01-04 Lost Circulation 2039.70 2039.70

For data sources see[6]

References