X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675180504000

Well Details

Well ID: 0675180504000
Loading map...
Location: 00/04-05-067-18W5/0
Location Alias: 00/04-05-67-18 W5M
Location Alias 2: 00/04-05-067-18 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 18
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 4-5-67-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0026126
License Date: 1964-05-21
License Status: Suspension
Spud Date: 1964-05-31
Final Drill Date: 1964-06-22
Well Total Depth: 2877.30 m
Surface Hole Latitude: 54.765616
Surface Hole Longitude: -116.717438

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-21 Obtained License
1964-06-22 Finished Drilling
1964-06-22 Well Mode changed to Drilled and Cased
1964-06-23 Production Casing Operation Performed
1964-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-15 Perforation Treatment Performed - Jet Perforation
1964-08-03 Perforation Treatment Performed - Jet Perforation
1964-08-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-16 Perforation Treatment Performed - Jet Perforation
1964-08-17 Well Began Production
1964-08-17 Well Fluid changed to Crude Oil
1964-08-17 Well Mode changed to Flowing
1973-11-26 Well Fluid changed to Crude Oil
1973-11-26 Well Mode changed to Pumping
1973-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-06 Well Fluid changed to Crude Oil
1973-12-06 Well Mode changed to Pumping
1976-12-03 Perforation Treatment Performed - Jet Perforation
1979-08-30 Well Log Performed
1993-02-23 Well Log Performed
1993-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-01 Well Fluid changed to Crude Oil
1993-06-01 Well Mode changed to Suspended
2001-08-11 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-07-15 Perforation 2815.40 2818.80 3
1976-12-03 Perforation 2787.70 2788.30 13
1993-02-24 Packing Device Capped w/Cement 2772.00 2780.00 0
2001-08-11 Perforation 2807.80 2812.40 3
2001-08-11 Perforation 2796.80 2799.30 13
2001-08-11 Perforation 2787.70 2791.40 13
1964-07-15 Acid Treatment 2815.40 2818.80 0
1964-08-03 Perforation 2807.80 2812.40 3
1964-08-04 Acid Treatment 2807.80 2812.40 0
1964-08-16 Perforation 2787.70 2791.40 3
1964-08-16 Acid Treatment 2787.70 2791.40 0
1973-11-28 Acid Treatment 2787.70 2791.40 0
1976-12-03 Perforation 2796.80 2799.30 13
1976-12-03 Perforation 2788.30 2791.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4608 0.0 0.0 0.0
1968 2916 0.0 0.0 0.0
1969 4603 0.0 0.0 0.0
1970 5024 0.0 0.0 0.0
1971 7108 0.0 0.0 0.0
1972 7746 0.0 0.0 0.0
1973 7734 0.0 0.0 0.0
1974 6235 0.0 0.0 0.0
1975 8267 0.0 0.0 0.0
1976 7054 0.0 0.0 0.0
1977 6386 0.0 0.0 0.0
1978 1674 0.0 0.0 0.0
1979 2826 0.0 0.0 0.0
1980 4492 0.0 0.0 0.0
1981 3521 0.0 0.0 0.0

For data sources see[5]

References