X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675180512000

Well Details

Well ID: 0675180512000
Loading map...
Location: 00/12-05-067-18W5/0
Location Alias: 00/12-05-67-18 W5M
Location Alias 2: 00/12-05-067-18 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 18
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 12-5-67-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0262227
License Date: 2001-11-21
License Status: Suspension
Spud Date: 2002-07-15
Final Drill Date: 2002-07-30
Well Total Depth: 2936.00 m
Surface Hole Latitude: 54.774485
Surface Hole Longitude: -116.714970

For data sources see[1][2]

Well History

Date Event
2001-11-21 Obtained License
2002-07-16 Surface Casing Operation Performed
2002-07-24 Direction Drilling Operation Performed - Deviate
2002-07-29 Well Log Performed
2002-07-30 Finished Drilling
2002-08-01 Production Casing Operation Performed
2002-08-01 Rig Released
2002-08-01 Well Mode changed to Drilled and Cased
2002-08-15 Perforation Treatment Performed - Jet Perforation
2002-08-15 Well Log Performed
2002-08-16 Perforation Treatment Performed - Remedial Casing
2002-08-16 Well Log Performed
2002-08-17 Perforation Treatment Performed - Jet Perforation
2002-08-17 Well Log Performed
2002-08-18 Perforation Treatment Performed - Cement Squeeze
2002-08-22 Perforation Treatment Performed - Jet Perforation
2002-08-22 Well Log Performed
2002-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-04 Well Began Production
2002-09-04 Well Fluid changed to Crude Oil
2002-09-04 Well Mode changed to Pumping
2005-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-11-01 Well Fluid changed to Crude Oil
2015-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-07-24 2339.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-08-15 Perforation 1570.00 1571.20 13
2002-08-22 Perforation 2853.60 2855.00 13
2002-08-22 Perforation 2850.20 2852.60 13
2002-08-22 Perforation 2842.80 2845.20 13
2002-08-22 Perforation 2833.70 2835.20 13
2002-08-22 Perforation 2830.00 2832.50 13
2002-08-25 Acid Treatment 2874.00 2875.50 0
2002-08-25 Acid Treatment 2873.00 2873.50 0
2002-08-25 Acid Treatment 2872.00 2872.50 0
2002-08-25 Acid Treatment 2867.00 2868.20 0
2002-08-25 Acid Treatment 2860.00 2861.50 0
2002-08-16 Remedial Casing Cementing 1570.00 1571.20 0
2002-08-25 Acid Treatment 2853.60 2855.00 0
2002-08-25 Acid Treatment 2850.20 2852.60 0
2002-08-25 Acid Treatment 2842.80 2845.20 0
2002-08-25 Acid Treatment 2833.70 2835.20 0
2002-08-25 Acid Treatment 2830.00 2832.50 0
2005-05-04 Acid Treatment 2872.00 2875.50 0
2005-05-04 Acid Treatment 2867.00 2868.20 0
2005-05-05 Acid Treatment 2830.00 2835.20 0
2005-05-05 Acid Treatment 2842.80 2855.00 0
2002-08-17 Perforation 1260.00 1261.20 13
2002-08-18 Cement Squeeze 1260.00 1261.20 0
2002-08-22 Perforation 2874.00 2875.50 13
2002-08-22 Perforation 2873.00 2873.50 13
2002-08-22 Perforation 2872.00 2872.50 13
2002-08-22 Perforation 2867.00 2868.20 13
2002-08-22 Perforation 2860.00 2861.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2059 0.0 0.0 0.0
2003 8477 0.0 0.0 0.0
2004 8747 0.0 0.0 0.0
2005 5242 0.0 0.0 0.0
2006 4814 0.0 0.0 0.0
2007 6728 0.0 0.0 0.0
2008 8007 0.0 0.0 0.0
2009 7961 0.0 0.0 0.0
2010 6672 0.0 0.0 0.0
2011 7282 0.0 0.0 0.0
2012 8748 0.0 0.0 0.0
2013 2327 0.0 0.0 0.0

For data sources see[6]

References