X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675180610000

Well Details

Well ID: 0675180610000
Loading map...
Location: 00/10-06-067-18W5/0
Location Alias: 00/10-06-67-18 W5M
Location Alias 2: 00/10-06-067-18 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 18
Section: 06
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 10-6-67-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0026319
License Date: 1964-06-23
License Status: Abandoned
Spud Date: 1964-06-26
Final Drill Date: 1964-07-18
Well Total Depth: 2888.00 m
Surface Hole Latitude: 54.772704
Surface Hole Longitude: -116.730325

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-06-23 Obtained License
1964-07-18 Finished Drilling
1964-07-18 Well Mode changed to Drilled and Cased
1964-07-22 Production Casing Operation Performed
1964-09-18 Perforation Treatment Performed - Jet Perforation
1964-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-24 Well Began Production
1964-09-24 Well Fluid changed to Crude Oil
1964-09-24 Well Mode changed to Flowing
1964-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-10-10 Perforation Treatment Performed - Jet Perforation
1964-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-11 Perforation Treatment Performed - Jet Perforation
1964-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-09 Perforation Treatment Performed - Cement Squeeze
1964-12-13 Perforation Treatment Performed - Jet Perforation
1964-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-05-19 Perforation Treatment Performed - Cement Squeeze
1965-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-05-24 Perforation Treatment Performed - Bullet Perforation
1965-07-04 Well Fluid changed to Crude Oil
1965-07-04 Well Mode changed to Pumping
1966-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-01 Well Began Injection
1969-06-01 Well Fluid changed to Water
1969-06-01 Well Type changed to Injection
1969-06-08 Perforation Treatment Performed - Jet Perforation
1969-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-06-09 Perforation Treatment Performed - Acid Wash - No Pressure
1978-02-13 Well Fluid changed to Water
1978-02-13 Well Mode changed to Suspended
1978-02-13 Well Type changed to Injection
1991-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-09 Perforation Treatment Performed - Cement Plug
1993-02-09 Perforation Treatment Performed - Jet Perforation
1993-02-09 Perforation Treatment Performed - Remedial Casing
1993-02-09 Well Fluid changed to Water
1993-02-09 Well Mode changed to Abandoned
1993-02-09 Well Type changed to Injection
1993-02-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-09-18 Perforation 2824.90 2828.20 3
1964-12-09 Cement Squeeze 2797.80 2810.00 0
1964-12-13 Perforation 2797.50 2798.70 3
1964-12-14 Acid Treatment 2797.50 2798.70 0
1964-12-20 Acid Treatment 2797.50 2798.70 0
1964-12-22 Acid Treatment 2797.50 2798.70 0
1965-04-04 Acid Treatment 2797.50 2798.70 0
1965-05-18 Acid Treatment 2796.80 2798.70 0
1965-05-19 Cement Squeeze 2796.80 2798.70 0
1965-05-24 Bullet Perforation 2796.80 2798.70 3
1965-05-24 Acid Treatment 2796.80 2798.70 0
1964-09-19 Acid Treatment 2824.90 2828.20 0
1966-02-09 Acid Treatment 2796.80 2798.70 0
1968-11-28 Acid Treatment 2796.80 2798.70 0
1969-06-08 Perforation 2813.90 2816.40 10
1969-06-08 Perforation 2818.80 2820.60 10
1969-06-08 Perforation 2824.60 2827.30 10
1969-06-09 Acid Wash 2813.90 2827.30 0
1969-06-09 Acid Treatment 2813.90 2827.30 0
1991-12-16 Packing Device Capped w/Cement 2777.50 2786.00 0
1993-02-09 Perforation 429.00 429.50 13
1993-02-09 Remedial Casing Cementing 429.00 429.50 0
1964-09-25 Acid Treatment 2824.90 2828.20 0
1993-02-09 Cement Plug 369.80 429.50 0
1964-10-10 Packing Device Capped w/Cement 2817.90 2817.90 0
1964-10-10 Perforation 2804.50 2806.30 3
1964-10-10 Perforation 2808.40 2810.00 3
1964-10-11 Perforation 2797.80 2799.60 3
1964-10-11 Acid Treatment 2797.80 2810.00 0
1964-11-24 Acid Treatment 2797.80 2799.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 360 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0

For data sources see[5]

References