X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675181511000

Well Details

Well ID: 0675181511000
Loading map...
Location: 00/11-15-067-18W5/0
Location Alias: 00/11-15-67-18 W5M
Location Alias 2: 00/11-15-067-18 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 18
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 11-15-67-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0154066
License Date: 1992-10-14
License Status: Suspension
Spud Date: 1992-10-15
Final Drill Date: 1992-11-04
Well Total Depth: 2845.00 m
Surface Hole Latitude: 54.802823
Surface Hole Longitude: -116.663214

For data sources see[1][2]

Well History

Date Event
1992-10-14 Obtained License
1992-10-16 Surface Casing Operation Performed
1992-11-04 Finished Drilling
1992-11-04 Well Mode changed to Drilled and Cased
1992-11-05 Well Log Performed
1992-11-07 Production Casing Operation Performed
1992-11-08 Rig Released
1992-11-18 Well Log Performed
1992-11-22 Perforation Treatment Performed - Jet Perforation
1992-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-26 Well Began Production
1992-11-26 Well Fluid changed to Crude Oil
1992-11-26 Well Mode changed to Flowing
1993-09-07 Well Log Performed
1994-09-06 Well Log Performed
1996-08-06 Perforation Treatment Performed - Chemical Squeeze
2002-10-15 Well Fluid changed to Crude Oil
2002-10-15 Well Mode changed to Pumping
2003-01-01 Well Fluid changed to Crude Oil
2003-01-01 Well Mode changed to Suspended
2003-06-27 Well Fluid changed to Crude Oil
2003-06-27 Well Mode changed to Pumping
2007-05-18 Well Log Performed
2010-10-31 Well Fluid changed to Crude Oil
2010-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-22 Perforation 2793.50 2795.00 16
1992-11-22 Perforation 2798.00 2818.00 16
1992-11-22 Perforation 2820.50 2821.50 16
1992-11-24 Acid Treatment 2793.50 2821.50 0
1996-08-06 Chemical Squeeze 2793.50 2821.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 762 0.0 0.0 0.0
1993 7038 0.0 0.0 0.0
1994 8368 0.0 0.0 0.0
1995 8505 0.0 0.0 0.0
1996 8480 0.0 0.0 0.0
1997 8703 0.0 0.0 0.0
1998 8240 0.0 0.0 0.0
1999 8609 0.0 0.0 0.0
2000 8625 0.0 0.0 0.0
2001 1288 0.0 0.0 0.0
2002 84 0.0 0.0 0.0
2003 3079 0.0 0.0 0.0
2004 7570 0.0 0.0 0.0
2005 8253 0.0 0.0 0.0
2006 8316 0.0 0.0 0.0
2007 7601 0.0 0.0 0.0
2008 8136 0.0 0.0 0.0
2009 6393 0.0 0.0 0.0

For data sources see[5]

References