If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0675182004000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.808649,"lon":-116.718107,"icon":""}]} |
Location: 00/04-20-067-18W5/0 | |
Location Alias: 00/04-20-67-18 W5M | |
Location Alias 2: 00/04-20-067-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 5 | |
Range: 18 | |
Section: 20 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ACCEL HOLDINGS GOOSER 4-20-67-18 | |
Operator Name: ACCEL Canada Holdings Limited | |
License Number: 0026168 | |
License Date: 1964-05-28 | |
License Status: Issued | |
Spud Date: 1964-05-30 | |
Final Drill Date: 1964-06-22 | |
Well Total Depth: 2837.70 m | |
Surface Hole Latitude: 54.808649 | |
Surface Hole Longitude: -116.718107 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1964-05-28 | Obtained License |
1964-06-22 | Finished Drilling |
1964-06-22 | Well Mode changed to Drilled and Cased |
1964-06-23 | Production Casing Operation Performed |
1964-07-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-07-03 | Perforation Treatment Performed - Jet Perforation |
1964-07-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1964-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1964-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1964-07-09 | Perforation Treatment Performed - Jet Perforation |
1964-07-11 | Well Began Production |
1964-07-11 | Well Fluid changed to Crude Oil |
1964-07-11 | Well Mode changed to Flowing |
1973-01-29 | Perforation Treatment Performed - Jet Perforation |
1973-01-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1975-05-27 | Well Fluid changed to Crude Oil |
1975-05-27 | Well Mode changed to Pumping |
1982-07-15 | Perforation Treatment Performed - Cement Squeeze |
1982-07-20 | Perforation Treatment Performed - Cement Squeeze |
1982-07-29 | Perforation Treatment Performed - Jet Perforation |
1982-07-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-11-17 | Perforation Treatment Performed - Jet Perforation |
1986-11-23 | Perforation Treatment Performed - Fractured |
1991-11-15 | Well Log Performed |
1993-05-13 | Well Log Performed |
1993-05-31 | Well Fluid changed to Crude Oil |
1993-05-31 | Well Mode changed to Suspended |
1993-09-01 | Well Began Injection |
1993-09-01 | Well Fluid changed to Solvent |
1993-09-01 | Well Type changed to Injection |
1993-11-22 | Well Log Performed |
1994-03-19 | Well Log Performed |
1995-04-13 | Well Log Performed |
1997-05-01 | Well Fluid changed to Solvent |
1997-05-01 | Well Mode changed to Suspended |
1997-05-01 | Well Type changed to Injection |
2008-05-12 | Well Type changed to Observation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1964-07-03 | Perforation | 2810.30 | 2812.40 | 7 |
1973-01-29 | Perforation | 2773.70 | 2779.20 | 10 |
1973-01-30 | Acid Treatment | 2773.70 | 2790.70 | 0 |
1973-02-12 | Acid Treatment | 2773.70 | 2779.20 | 0 |
1982-07-15 | Cement Squeeze | 2773.70 | 2790.70 | 0 |
1982-07-20 | Cement Squeeze | 2773.70 | 2790.70 | 0 |
1982-07-29 | Perforation | 2796.30 | 2799.30 | 13 |
1982-07-29 | Perforation | 2793.20 | 2796.20 | 13 |
1982-07-31 | Acid Treatment | 2793.20 | 2799.30 | 0 |
1986-11-17 | Perforation | 2772.00 | 2779.90 | 13 |
1986-11-17 | Perforation | 2782.00 | 2791.50 | 13 |
1964-07-03 | Perforation | 2815.70 | 2818.80 | 7 |
1986-11-23 | Fracture | 2772.00 | 2799.30 | 0 |
1964-07-03 | Perforation | 2822.10 | 2823.10 | 7 |
1964-07-03 | Acid Treatment | 2810.30 | 2823.10 | 0 |
1964-07-05 | Packing Device Capped w/Cement | 2813.60 | 2813.60 | 0 |
1964-07-08 | Packing Device Capped w/Cement | 2803.20 | 2803.20 | 0 |
1964-07-09 | Perforation | 2793.20 | 2799.30 | 7 |
1964-07-09 | Acid Treatment | 2793.20 | 2799.30 | 0 |
1973-01-29 | Perforation | 2782.50 | 2790.70 | 10 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 3870 | 0.0 | 0.0 | 0.0 |
1968 | 2560 | 0.0 | 0.0 | 0.0 |
1969 | 2992 | 0.0 | 0.0 | 0.0 |
1970 | 7103 | 0.0 | 0.0 | 0.0 |
1971 | 5970 | 0.0 | 0.0 | 0.0 |
1972 | 5470 | 0.0 | 0.0 | 0.0 |
1973 | 4080 | 0.0 | 0.0 | 0.0 |
1974 | 3413 | 0.0 | 0.0 | 0.0 |
1975 | 192 | 0.0 | 0.0 | 0.0 |
1980 | 1327 | 0.0 | 0.0 | 0.0 |
1981 | 3145 | 0.0 | 0.0 | 0.0 |
1982 | 1001 | 0.0 | 0.0 | 0.0 |
1984 | 2608 | 0.0 | 0.0 | 0.0 |
1985 | 4656 | 0.0 | 0.0 | 0.0 |
1986 | 1001 | 0.0 | 0.0 | 0.0 |
1987 | 7541 | 0.0 | 0.0 | 0.0 |
1988 | 8241 | 0.0 | 0.0 | 0.0 |
1989 | 8456 | 0.0 | 0.0 | 0.0 |
1990 | 8001 | 0.0 | 0.0 | 0.0 |
1991 | 7148 | 0.0 | 0.0 | 0.0 |
1992 | 4478 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]