X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675182005000

Well Details

Well ID: 0675182005000
Loading map...
Location: 00/05-20-067-18W5/0
Location Alias: 00/05-20-67-18 W5M
Location Alias 2: 00/05-20-067-18 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 18
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 5-20-67-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0158794
License Date: 1993-06-03
License Status: Suspension
Spud Date: 1993-06-03
Final Drill Date: 1993-06-20
Well Total Depth: 2882.00 m
Surface Hole Latitude: 54.812511
Surface Hole Longitude: -116.718891

For data sources see[1][2]

Well History

Date Event
1993-06-03 Obtained License
1993-06-04 Surface Casing Operation Performed
1993-06-08 Lost Circulation Occurred
1993-06-20 Finished Drilling
1993-06-20 Well Mode changed to Drilled and Cased
1993-06-21 Well Log Performed
1993-06-23 Production Casing Operation Performed
1993-06-24 Rig Released
1993-07-23 Perforation Treatment Performed - Open-Hole Completion
1993-07-23 Well Log Performed
1993-07-25 Well Log Performed
1993-07-26 Perforation Treatment Performed - Jet Perforation
1993-07-27 Well Log Performed
1993-07-29 Well Log Performed
1993-07-30 Perforation Treatment Performed - Jet Perforation
1993-08-05 Perforation Treatment Performed - Abrasa-Jet Perforation
1993-08-11 Perforation Treatment Performed - Cement Plug
1993-08-11 Perforation Treatment Performed - Open-Hole Completion
1993-08-19 Well Began Production
1993-08-19 Well Fluid changed to Crude Oil
1993-08-19 Well Mode changed to Pumping
1993-12-11 Well Log Performed
1996-06-05 Perforation Treatment Performed - Chemical Squeeze
1997-07-06 Well Log Performed
2010-07-31 Well Fluid changed to Crude Oil
2010-07-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-23 Open Hole/Barefoot Completion 2750.00 2882.00 0
1993-07-26 Perforation 2771.00 2776.00 13
1993-07-30 Perforation 2771.00 2776.00 13
1993-08-05 Hydra Jet Perforation 2771.00 2776.00 0
1993-08-11 Cement Plug 2832.90 2844.40 0
1993-08-11 Open Hole/Barefoot Completion 2750.00 2832.90 0
1996-06-05 Chemical Squeeze 2750.00 2832.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2608 0.0 0.0 0.0
1994 8434 0.0 0.0 0.0
1995 8489 0.0 0.0 0.0
1996 8450 0.0 0.0 0.0
1997 8459 0.0 0.0 0.0
1998 8148 0.0 0.0 0.0
1999 8488 0.0 0.0 0.0
2000 8102 0.0 0.0 0.0
2001 8517 0.0 0.0 0.0
2002 7472 0.0 0.0 0.0
2003 8645 0.0 0.0 0.0
2004 8514 0.0 0.0 0.0
2005 7957 0.0 0.0 0.0
2006 8329 0.0 0.0 0.0
2007 8676 0.0 0.0 0.0
2008 8621 0.0 0.0 0.0
2009 4358 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-06-08 Lost Circulation 1478.00 1733.00

For data sources see[6]

References