X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0675182010000

Well Details

Well ID: 0675182010000
Loading map...
Location: 00/10-20-067-18W5/0
Location Alias: 00/10-20-67-18 W5M
Location Alias 2: 00/10-20-067-18 W5/00
Country: Canada
Province: Alberta
Township: 067
Meridian: 5
Range: 18
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACCEL HOLDINGS GOOSER 10-20-67-18
Operator Name: ACCEL Canada Holdings Limited
License Number: 0025998
License Date: 1964-04-20
License Status: Suspension
Spud Date: 1964-04-25
Final Drill Date: 1964-05-17
Well Total Depth: 2852.60 m
Surface Hole Latitude: 54.815875
Surface Hole Longitude: -116.705517

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-04-20 Obtained License
1964-05-17 Finished Drilling
1964-05-17 Well Mode changed to Drilled and Cased
1964-05-18 Production Casing Operation Performed
1964-05-20 Perforation Treatment Performed - Jet Perforation
1964-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-21 Perforation Treatment Performed - Jet Perforation
1964-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-05-27 Well Began Production
1964-05-27 Well Fluid changed to Crude Oil
1964-05-27 Well Mode changed to Flowing
1964-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-05-27 Well Fluid changed to Crude Oil
1975-05-27 Well Mode changed to Pumping
1976-12-18 Perforation Treatment Performed - Jet Perforation
1993-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-07 Well Log Performed
1999-07-01 Well Fluid changed to Crude Oil
1999-07-01 Well Mode changed to Suspended
2001-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-09 Plug Back Performed
2001-12-09 Well Fluid changed to Crude Oil
2001-12-09 Well Log Performed
2001-12-09 Well Mode changed to Abandoned Zone
2001-12-10 Perforation Treatment Performed - Jet Perforation
2001-12-11 Perforation Treatment Performed - Fractured
2001-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-17 Plug Back Performed
2001-12-18 Perforation Treatment Performed - Jet Perforation
2001-12-18 Well Log Performed
2001-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-20 Perforation Treatment Performed - Jet Perforation
2001-12-20 Plug Back Performed
2001-12-20 Well Log Performed
2001-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-21 Plug Back Performed
2001-12-21 Well Log Performed
2001-12-22 Perforation Treatment Performed - Jet Perforation
2001-12-22 Well Log Performed
2004-11-11 Perforation Treatment Performed - Jet Perforation
2004-11-12 Perforation Treatment Performed - Cement Squeeze
2004-11-15 Perforation Treatment Performed - Jet Perforation
2004-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-17 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-05-20 Perforation 2803.60 2804.50 7
1976-12-18 Perforation 2803.60 2804.50 13
1993-10-03 Acid Treatment 2799.00 2811.30 0
2001-12-09 Packing Device Capped w/Cement 2787.00 2795.00 0
2001-12-10 Perforation 1599.00 1603.00 20
2001-12-11 Fracture 1599.00 1603.00 0
2001-12-17 Packing Device Capped w/Cement 1582.00 1590.00 0
2001-12-18 Perforation 1501.50 1504.50 20
2001-12-20 Packing Device Capped w/Cement 1487.00 1495.00 0
2001-12-20 Perforation 1280.20 1283.20 20
2001-12-21 Packing Device Capped w/Cement 1267.00 1275.00 0
1964-05-20 Perforation 2808.40 2811.20 7
2001-12-22 Perforation 1202.70 1205.20 20
2004-11-11 Perforation 1215.00 1216.10 72
2004-11-12 Cement Squeeze 1215.00 1216.10 0
2004-11-15 Perforation 1202.70 1205.20 14
2004-11-17 Packing Device Capped w/Cement 1184.00 1192.00 0
1964-05-21 Perforation 2799.00 2800.50 7
1964-05-21 Acid Treatment 2799.00 2811.20 0
1964-05-23 Acid Treatment 2799.00 2811.20 0
1964-05-26 Acid Treatment 2799.00 2811.20 0
1964-07-11 Acid Treatment 2799.00 2811.20 0
1976-12-18 Perforation 2808.40 2811.20 13
1976-12-18 Perforation 2799.00 2800.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2683 0.0 0.0 0.0
1968 2745 0.0 0.0 0.0
1969 1284 0.0 0.0 0.0
1970 260 0.0 0.0 0.0
1971 3026 0.0 0.0 0.0
1972 994 0.0 0.0 0.0
1973 6614 0.0 0.0 0.0
1974 7215 0.0 0.0 0.0
1975 2472 0.0 0.0 0.0
1976 4052 0.0 0.0 0.0
1977 5444 0.0 0.0 0.0
1978 3927 0.0 0.0 0.0
1979 772 0.0 0.0 0.0
1980 3103 0.0 0.0 0.0
1981 4045 0.0 0.0 0.0
1982 4435 0.0 0.0 0.0
1983 2489 0.0 0.0 0.0
1984 7856 0.0 0.0 0.0
1985 7593 0.0 0.0 0.0
1986 6203 0.0 0.0 0.0
1987 7547 0.0 0.0 0.0
1988 6692 0.0 0.0 0.0
1989 7973 0.0 0.0 0.0
1990 5808 0.0 0.0 0.0
1991 5380 0.0 0.0 0.0
1992 6275 0.0 0.0 0.0
1993 7743 0.0 0.0 0.0
1994 7353 0.0 0.0 0.0
1995 8293 0.0 0.0 0.0
1996 8094 0.0 0.0 0.0
1997 7945 0.0 0.0 0.0
1998 1512 0.0 0.0 0.0

For data sources see[5]

References