If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0675182111000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.816816,"lon":-116.688043,"icon":""}]} |
Location: 00/11-21-067-18W5/0 | |
Location Alias: 00/11-21-67-18 W5M | |
Location Alias 2: 00/11-21-067-18 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 067 | |
Meridian: 5 | |
Range: 18 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ACCEL HOLDINGS GOOSER 11-21-67-18 | |
Operator Name: ACCEL Canada Holdings Limited | |
License Number: 0184190 | |
License Date: 1996-01-05 | |
License Status: Issued | |
Spud Date: 1996-01-16 | |
Final Drill Date: 1996-01-22 | |
Well Total Depth: 1640.00 m | |
Surface Hole Latitude: 54.816816 | |
Surface Hole Longitude: -116.688043 |
Date | Event |
---|---|
1996-01-05 | Obtained License |
1996-01-17 | Surface Casing Operation Performed |
1996-01-22 | Finished Drilling |
1996-01-22 | Well Log Performed |
1996-01-22 | Well Mode changed to Drilled and Cased |
1996-01-23 | Drill Stem Test Performed |
1996-01-23 | Well Log Performed |
1996-01-25 | Plug Back Performed |
1996-01-26 | Production Casing Operation Performed |
1996-01-27 | Rig Released |
1996-03-01 | Perforation Treatment Performed - Jet Perforation |
1996-03-14 | Perforation Treatment Performed - Fractured |
1996-06-01 | Well Began Production |
1996-06-01 | Well Fluid changed to Gas |
1996-06-01 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-01 | Perforation | 1192.50 | 1195.50 | 13 |
1996-03-14 | Fracture | 1192.50 | 1195.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 5123 | 0.0 | 0.0 | 0.0 |
1997 | 8572 | 0.0 | 0.0 | 0.0 |
1998 | 8434 | 0.0 | 0.0 | 0.0 |
1999 | 8720 | 0.0 | 0.0 | 0.0 |
2000 | 8551 | 0.0 | 0.0 | 0.0 |
2001 | 8650 | 0.0 | 0.0 | 0.0 |
2002 | 8756 | 0.0 | 0.0 | 0.0 |
2003 | 8346 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 8639 | 0.0 | 0.0 | 0.0 |
2006 | 8535 | 0.0 | 0.0 | 0.0 |
2007 | 8716 | 0.0 | 0.0 | 0.0 |
2008 | 8754 | 0.0 | 0.0 | 0.0 |
2009 | 8527 | 0.0 | 0.0 | 0.0 |
2010 | 8711 | 0.0 | 0.0 | 0.0 |
2011 | 8675 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8702 | 0.0 | 0.0 | 0.0 |
2019 | 4584 | 0.0 | 0.0 | 0.0 |
2020 | 1761 | 0.0 | 0.0 | 0.0 |
For data sources see[5]