X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695063510000

Well Details

Well ID: 0695063510000
Loading map...
Location: 00/10-35-069-06W5/0
Location Alias: 00/10-35-69-06 W5M
Location Alias 2: 00/10-35-069-06 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 06
Section: 35
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: PROGRESS PARKER 10-35-69-6
Operator Name: Petronas Energy Canada Ltd.
License Number: 0247820
License Date: 2000-12-21
License Status: RecCertified
Spud Date: 2000-12-30
Final Drill Date: 2001-01-02
Well Total Depth: 1055.00 m
Surface Hole Latitude: 55.018523
Surface Hole Longitude: -114.802382

For data sources see[1][2]

Well History

Date Event
2000-12-21 Obtained License
2000-12-30 Surface Casing Operation Performed
2001-01-02 Finished Drilling
2001-01-02 Well Log Performed
2001-01-03 Production Casing Operation Performed
2001-01-03 Rig Released
2001-01-03 Well Mode changed to Drilled and Cased
2001-01-09 Perforation Treatment Performed - Jet Perforation
2001-01-09 Well Log Performed
2001-01-10 Well Log Performed
2001-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-11 Perforation Treatment Performed - Jet Perforation
2001-01-11 Plug Back Performed
2001-01-11 Well Log Performed
2001-01-11 Well Mode changed to Abandoned Zone
2001-01-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-14 Perforation Treatment Performed - Jet Perforation
2001-01-14 Plug Back Performed
2001-01-14 Well Log Performed
2001-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-27 Plug Back Performed
2001-01-27 Well Log Performed
2001-02-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-01-09 Perforation 722.00 725.00 13
2001-01-09 Perforation 715.50 717.50 13
2001-01-11 Packing Device Capped w/Cement 705.00 713.00 0
2001-01-11 Perforation 577.00 580.00 13
2001-01-14 Packing Device Capped w/Cement 567.00 575.00 0
2001-01-14 Perforation 453.00 455.00 13
2001-01-14 Perforation 387.00 389.00 13
2001-01-27 Packing Device Capped w/Cement 376.50 385.00 0

For data sources see[4]



References