X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695091516000

Well Details

Well ID: 0695091516000
Loading map...
Location: 00/16-15-069-09W5/0
Location Alias: 00/16-15-69-09 W5M
Location Alias 2: 00/16-15-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 15
County/Municipality: Big Lakes County
Well Name: ACCEL HOLDINGS SWANH 16-15-69-9
Operator Name: ACCEL Canada Holdings Limited
License Number: 0153995
License Date: 1992-10-08
License Status: Amended
Spud Date: 1992-11-08
Final Drill Date: 1992-11-25
Well Total Depth: 2478.00 m
Surface Hole Latitude: 54.976466
Surface Hole Longitude: -115.268964

For data sources see[1][2]

Well History

Date Event
1992-10-08 Obtained License
1992-11-09 Surface Casing Operation Performed
1992-11-11 Lost Circulation Occurred
1992-11-18 Direction Drilling Operation Performed - Horizontal
1992-11-22 Production Casing Operation Performed
1992-11-22 Well Log Performed
1992-11-25 Finished Drilling
1992-11-25 Perforation Treatment Performed - Open-Hole Completion
1992-11-25 Rig Released
1992-11-25 Well Mode changed to Drilled and Cased
1992-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-12-17 Well Log Performed
1992-12-22 Perforation Treatment Performed - Jet Perforation
1993-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-15 Well Began Production
1993-01-15 Well Fluid changed to Crude Oil
1993-01-15 Well Mode changed to Pumping
2001-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-27 Plug Back Performed
2001-08-27 Well Fluid changed to Crude Oil
2001-08-27 Well Mode changed to Abandoned Zone
2001-09-01 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-09-01 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-11-18 1965.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-25 Open Hole/Barefoot Completion 2150.00 2478.00 0
1992-12-04 Acid Treatment 2150.00 2478.00 0
1992-12-22 Perforation 2155.30 2255.50 13
1993-01-02 Acid Treatment 2150.00 2478.00 0
2001-08-27 Packing Device Capped w/Cement 2110.00 2141.90 0
2001-09-01 Bridge Plug, No Cement 1932.00 1933.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5970 0.0 0.0 0.0
1994 8743 0.0 0.0 0.0
1995 8194 0.0 0.0 0.0
1996 7381 0.0 0.0 0.0
1997 8381 0.0 0.0 0.0
1998 115 0.0 0.0 0.0
1999 4190 0.0 0.0 0.0
2000 8673 0.0 0.0 0.0
2001 4330 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-11-11 Lost Circulation 1254.00 1254.00

For data sources see[7]

References