If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0706092403020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.086322,"lon":-119.273298,"icon":""}]} |
Location: 02/03-24-070-09W6/0 | |
Location Alias: 02/03-24-70-09 W6M | |
Location Alias 2: 02/03-24-070-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 6 | |
Range: 09 | |
Section: 24 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: ECA HZ 102 ELM 3-24-70-9 | |
Operator Name: Ovintiv Canada ULC | |
License Number: 0458117 | |
License Date: 2013-07-17 | |
License Status: Amended | |
Spud Date: 2014-02-27 | |
Final Drill Date: 2014-03-25 | |
Well Total Depth: 5204.00 m | |
Surface Hole Latitude: 55.086322 | |
Surface Hole Longitude: -119.273298 |
Date | Event |
---|---|
2013-07-17 | Obtained License |
2014-02-27 | Direction Drilling Operation Performed - Deviate |
2014-02-28 | Surface Casing Operation Performed |
2014-03-11 | Intermediate Casing Operation Performed |
2014-03-13 | Direction Drilling Operation Performed - Horizontal |
2014-03-16 | Well Log Performed |
2014-03-20 | Well Log Performed |
2014-03-25 | Finished Drilling |
2014-03-25 | Well Mode changed to Drilled and Cased |
2014-03-27 | Perforation Treatment Performed - Open-Hole Completion |
2014-03-27 | Production Casing Operation Performed |
2014-03-28 | Rig Released |
2014-07-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-09 | Well Fluid changed to Gas |
2014-08-09 | Well Mode changed to Testing |
2014-08-10 | Well Began Production |
2014-08-10 | Well Fluid changed to Gas |
2014-08-10 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-27 | 218.00 | Deviate (5 - 79 degrees) |
2014-03-13 | 2654.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-27 | Open Hole/Barefoot Completion | 5189.00 | 5204.00 | 0 |
2014-07-14 | Multi-Stage Fracture | 4196.90 | 4198.10 | 0 |
2014-07-15 | Multi-Stage Fracture | 4076.20 | 4077.40 | 0 |
2014-07-15 | Multi-Stage Fracture | 3953.30 | 3954.50 | 0 |
2014-07-15 | Multi-Stage Fracture | 3842.00 | 3843.20 | 0 |
2014-07-15 | Multi-Stage Fracture | 3717.80 | 3719.10 | 0 |
2014-07-15 | Multi-Stage Fracture | 3606.50 | 3607.70 | 0 |
2014-07-15 | Multi-Stage Fracture | 3482.60 | 3483.80 | 0 |
2014-07-15 | Multi-Stage Fracture | 3373.10 | 3374.30 | 0 |
2014-07-15 | Multi-Stage Fracture | 3249.40 | 3250.60 | 0 |
2014-07-15 | Multi-Stage Fracture | 3138.90 | 3140.20 | 0 |
2014-07-13 | Multi-Stage Fracture | 5124.40 | 5140.00 | 0 |
2014-07-16 | Multi-Stage Fracture | 3014.10 | 3015.30 | 0 |
2014-07-16 | Multi-Stage Fracture | 2905.00 | 2906.30 | 0 |
2014-07-16 | Multi-Stage Fracture | 2780.90 | 2782.10 | 0 |
2014-07-16 | Multi-Stage Fracture | 2670.40 | 2671.60 | 0 |
2014-07-13 | Multi-Stage Fracture | 5013.10 | 5014.30 | 0 |
2014-07-13 | Multi-Stage Fracture | 4888.40 | 4889.60 | 0 |
2014-07-14 | Multi-Stage Fracture | 4777.20 | 4778.40 | 0 |
2014-07-14 | Multi-Stage Fracture | 4652.40 | 4653.60 | 0 |
2014-07-14 | Multi-Stage Fracture | 4541.90 | 4543.20 | 0 |
2014-07-14 | Multi-Stage Fracture | 4419.30 | 4420.60 | 0 |
2014-07-14 | Multi-Stage Fracture | 4308.10 | 4309.30 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-07-13 | 2014-07-16 | 2,550 | 20,772 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 86.2478 | N/A | |||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 13.6874 | N/A | ||
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0019 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0627 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-07-02 | 2014-07-15 | Surface Water - Runoff | 8440 |
2014-07-16 | 2014-07-20 | Surface Water - River | 12763 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 2880 | 0.0 | 0.0 | 0.0 |
2015 | 8592 | 0.0 | 0.0 | 0.0 |
2016 | 8603 | 0.0 | 0.0 | 0.0 |
2017 | 5821 | 0.0 | 0.0 | 0.0 |
2019 | 2952 | 0.0 | 0.0 | 0.0 |
2020 | 1439 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-28 | No Incident Encountered | 0.00 | 0.00 |
2014-07-16 | No Incident Encountered | 0.00 | 0.00 |
2014-09-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]