X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706092508020

Well Details

Well ID: 0706092508020
Loading map...
Location: 02/08-25-070-09W6/0
Location Alias: 02/08-25-70-09 W6M
Location Alias 2: 02/08-25-070-09 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 09
Section: 25
County/Municipality: County of Grande Prairie No. 1
Well Name: ECA HZ 102 ELM 8-25-70-9
Operator Name: Ovintiv Canada ULC
License Number: 0460114
License Date: 2013-10-18
License Status: Amended
Spud Date: 2014-03-06
Final Drill Date: 2014-03-31
Well Total Depth: 5190.00 m
Surface Hole Latitude: 55.105674
Surface Hole Longitude: -119.254488

For data sources see[1][2]

Well History

Date Event
2013-10-18 Obtained License
2014-03-06 Direction Drilling Operation Performed - Deviate
2014-03-08 Surface Casing Operation Performed
2014-03-16 Intermediate Casing Operation Performed
2014-03-17 Direction Drilling Operation Performed - Horizontal
2014-03-31 Finished Drilling
2014-03-31 Well Log Performed
2014-03-31 Well Mode changed to Drilled and Cased
2014-04-01 Liner Casing Operation Performed
2014-04-01 Perforation Treatment Performed - Open-Hole Completion
2014-04-03 Rig Released
2014-10-14 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-14 Well Began Production
2014-11-14 Well Fluid changed to Gas
2014-11-14 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-06 Precision Drilling Corporation 535 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-03-06 231.00 Deviate (5 - 79 degrees)
2014-03-17 2620.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-04-01 Open Hole/Barefoot Completion 5174.00 5190.00 0
2014-10-15 Multi-Stage Fracture 4238.70 4239.90 0
2014-10-15 Multi-Stage Fracture 4119.80 4121.10 0
2014-10-15 Multi-Stage Fracture 4011.70 4012.90 0
2014-10-15 Multi-Stage Fracture 3904.10 3905.30 0
2014-10-15 Multi-Stage Fracture 3796.80 3798.10 0
2014-10-15 Multi-Stage Fracture 3678.80 3680.00 0
2014-10-15 Multi-Stage Fracture 3572.60 3573.80 0
2014-10-15 Multi-Stage Fracture 3469.50 3470.70 0
2014-10-15 Multi-Stage Fracture 3360.20 3361.40 0
2014-10-16 Multi-Stage Fracture 3242.00 3243.30 0
2014-10-14 Multi-Stage Fracture 5110.80 5125.90 0
2014-10-16 Multi-Stage Fracture 3132.80 3134.00 0
2014-10-16 Multi-Stage Fracture 3027.40 3028.60 0
2014-10-16 Multi-Stage Fracture 2910.50 2911.80 0
2014-10-16 Multi-Stage Fracture 2804.50 2805.70 0
2014-10-16 Multi-Stage Fracture 2698.40 2699.60 0
2014-10-14 Multi-Stage Fracture 5002.00 5003.20 0
2014-10-14 Multi-Stage Fracture 4892.70 4893.90 0
2014-10-14 Multi-Stage Fracture 4786.50 4787.70 0
2014-10-14 Multi-Stage Fracture 4677.20 4678.40 0
2014-10-14 Multi-Stage Fracture 4569.90 4571.10 0
2014-10-14 Multi-Stage Fracture 4451.40 4452.60 0
2014-10-15 Multi-Stage Fracture 4346.40 4347.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-14 2014-10-16 2,507 10,970 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 81.6542 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 18.2844 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0018 N/A
Non-Hazardous Not Available 100 0.0594 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-09-29 2014-10-14 Surface Water - Runoff 7796
2014-10-13 2014-10-15 Groundwater - Non-saline greater than 150m deep 2135
2014-10-13 2014-10-15 Surface Water - Runoff 1888

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 98 0.0 0.0 0.0
2015 5346 0.0 0.0 0.0
2016 8563 0.0 0.0 0.0
2017 8729 0.0 0.0 0.0
2018 8731 0.0 0.0 0.0
2019 1488 0.0 0.0 0.0
2020 1 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-04-06 No Incident Encountered 0.00 0.00
2014-10-16 No Incident Encountered 0.00 0.00
2014-11-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References