If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0706092704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.098785,"lon":-119.324718,"icon":""}]} |
Location: 00/04-27-070-09W6/0 | |
Location Alias: 00/04-27-70-09 W6M | |
Location Alias 2: 00/04-27-070-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 6 | |
Range: 09 | |
Section: 27 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: ECA HZ ELM 4-27-70-9 | |
Operator Name: Ovintiv Canada ULC | |
License Number: 0455799 | |
License Date: 2013-03-06 | |
License Status: Amended | |
Spud Date: 2014-03-11 | |
Final Drill Date: 2014-04-06 | |
Well Total Depth: 5240.00 m | |
Surface Hole Latitude: 55.098785 | |
Surface Hole Longitude: -119.324718 |
Date | Event |
---|---|
2013-03-06 | Obtained License |
2014-03-13 | Direction Drilling Operation Performed - Deviate |
2014-03-13 | Surface Casing Operation Performed |
2014-03-22 | Intermediate Casing Operation Performed |
2014-03-24 | Direction Drilling Operation Performed - Horizontal |
2014-04-06 | Finished Drilling |
2014-04-06 | Well Log Performed |
2014-04-06 | Well Mode changed to Drilled and Cased |
2014-04-08 | Perforation Treatment Performed - Open-Hole Completion |
2014-04-08 | Production Casing Operation Performed |
2014-04-10 | Rig Released |
2014-07-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-16 | Well Fluid changed to Gas |
2014-08-16 | Well Mode changed to Testing |
2014-08-17 | Well Began Production |
2014-08-17 | Well Fluid changed to Gas |
2014-08-17 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-03-11 | Ensign Drilling Inc. | 222 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-03-13 | 247.00 | Deviate (5 - 79 degrees) |
2014-03-24 | 2695.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-04-08 | Open Hole/Barefoot Completion | 5224.00 | 5239.00 | 0 |
2014-07-28 | Multi-Stage Fracture | 4246.00 | 4247.20 | 0 |
2014-07-28 | Multi-Stage Fracture | 4131.00 | 4132.30 | 0 |
2014-07-28 | Multi-Stage Fracture | 4013.60 | 4014.80 | 0 |
2014-07-28 | Multi-Stage Fracture | 3894.60 | 3895.80 | 0 |
2014-07-28 | Multi-Stage Fracture | 3775.70 | 3776.90 | 0 |
2014-07-28 | Multi-Stage Fracture | 3671.30 | 3672.50 | 0 |
2014-07-28 | Multi-Stage Fracture | 3549.90 | 3551.10 | 0 |
2014-07-28 | Multi-Stage Fracture | 3432.60 | 3433.90 | 0 |
2014-07-28 | Multi-Stage Fracture | 3326.70 | 3327.90 | 0 |
2014-07-28 | Multi-Stage Fracture | 3205.00 | 3206.20 | 0 |
2014-07-27 | Multi-Stage Fracture | 5151.40 | 5166.10 | 0 |
2014-07-28 | Multi-Stage Fracture | 3088.20 | 3089.40 | 0 |
2014-07-28 | Multi-Stage Fracture | 2981.80 | 2983.00 | 0 |
2014-07-29 | Multi-Stage Fracture | 2850.40 | 2851.70 | 0 |
2014-07-29 | Multi-Stage Fracture | 2732.40 | 2733.70 | 0 |
2014-07-27 | Multi-Stage Fracture | 5052.10 | 5053.30 | 0 |
2014-07-27 | Multi-Stage Fracture | 4925.50 | 4926.80 | 0 |
2014-07-27 | Multi-Stage Fracture | 4821.10 | 4822.30 | 0 |
2014-07-27 | Multi-Stage Fracture | 4706.40 | 4707.60 | 0 |
2014-07-28 | Multi-Stage Fracture | 4591.00 | 4592.20 | 0 |
2014-07-28 | Multi-Stage Fracture | 4477.40 | 4478.60 | 0 |
2014-07-28 | Multi-Stage Fracture | 4360.80 | 4362.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-07-27 | 2014-07-29 | 2,589 | 9,329 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 80.2872 | N/A | |||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 19.6525 | N/A | ||
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0018 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0584 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-07-27 | 2014-07-29 | Surface Water - River | 10843 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 1899 | 0.0 | 0.0 | 0.0 |
2015 | 8397 | 0.0 | 0.0 | 0.0 |
2016 | 8703 | 0.0 | 0.0 | 0.0 |
2017 | 8741 | 0.0 | 0.0 | 0.0 |
2018 | 8739 | 0.0 | 0.0 | 0.0 |
2019 | 2880 | 0.0 | 0.0 | 0.0 |
2020 | 743 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-04-10 | No Incident Encountered | 0.00 | 0.00 |
2014-07-29 | No Incident Encountered | 0.00 | 0.00 |
2014-09-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]