X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706100804000

Well Details

Well ID: 0706100804000
Loading map...
Location: 00/04-08-070-10W6/0
Location Alias: 00/04-08-70-10 W6M
Location Alias 2: 00/04-08-070-10 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 10
Section: 08
County/Municipality: County of Grande Prairie No. 1
Well Name: ECA HZ ELM 4-8-70-10
Operator Name: Ovintiv Canada ULC
License Number: 0443526
License Date: 2012-01-31
License Status: Suspension
Spud Date: 2012-04-05
Final Drill Date: 2012-05-25
Well Total Depth: 4500.20 m
Surface Hole Latitude: 55.029967
Surface Hole Longitude: -119.473770

For data sources see[1][2]

Well History

Date Event
2012-01-31 Obtained License
2012-04-06 Surface Casing Operation Performed
2012-04-16 Well Log Performed
2012-04-18 Direction Drilling Operation Performed - Deviate
2012-04-25 Intermediate Casing Operation Performed
2012-04-27 Direction Drilling Operation Performed - Horizontal
2012-04-27 Well Log Performed
2012-05-25 Finished Drilling
2012-05-25 Perforation Treatment Performed - Open-Hole Completion
2012-05-25 Well Mode changed to Drilled and Cased
2012-05-28 Well Log Performed
2012-05-29 Liner Casing Operation Performed
2012-05-31 Rig Released
2012-07-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-18 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-08 Well Fluid changed to Gas
2012-11-08 Well Mode changed to Testing
2012-12-14 Well Fluid changed to Gas
2012-12-14 Well Mode changed to Test Completed
2012-12-15 Well Log Performed
2016-08-22 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-04-18 2605.20 Deviate (5 - 79 degrees)
2012-04-27 2906.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-05-25 Open Hole/Barefoot Completion 4460.70 4500.20 0
2012-11-01 Multi-Stage Fracture 3618.70 3619.90 0
2012-11-01 Multi-Stage Fracture 3514.20 3515.40 0
2012-11-01 Multi-Stage Fracture 3410.90 3412.10 0
2012-11-02 Multi-Stage Fracture 3305.40 3306.70 0
2012-11-02 Multi-Stage Fracture 3206.20 3207.40 0
2012-11-02 Multi-Stage Fracture 3103.90 3105.20 0
2012-11-03 Multi-Stage Fracture 3011.50 3012.80 0
2012-07-17 Multi-Stage Fracture 4421.50 4423.50 0
2012-07-17 Multi-Stage Fracture 4316.50 4317.80 0
2012-07-18 Multi-Stage Fracture 4212.70 4213.90 0
2012-07-18 Multi-Stage Fracture 4121.00 4122.30 0
2012-07-18 Multi-Stage Fracture 4017.90 4019.20 0
2012-10-31 Multi-Stage Fracture 3915.30 3916.50 0
2012-10-31 Multi-Stage Fracture 3811.50 3812.70 0
2012-11-01 Multi-Stage Fracture 3709.50 3710.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 796 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-31 No Incident Encountered 0.00 0.00
2012-08-03 No Incident Encountered 0.00 0.00
2012-11-03 No Incident Encountered 0.00 0.00
2012-12-15 No Incident Encountered 0.00 0.00
2014-11-08 No Incident Encountered 0.00 0.00
2012-05-29 No Incident Encountered 0.00 0.00
2012-05-30 No Incident Encountered 0.00 0.00
2014-12-07 No Incident Encountered 0.00 0.00
2016-08-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References