X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706101301000

Well Details

Well ID: 0706101301000
Loading map...
Location: 00/01-13-070-10W6/0
Location Alias: 00/01-13-70-10 W6M
Location Alias 2: 00/01-13-070-10 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 10
Section: 13
County/Municipality: County of Grande Prairie No. 1
Well Name: ECA HZ ELM 1-13-70-10
Operator Name: Ovintiv Canada ULC
License Number: 0419682
License Date: 2010-04-09
License Status: Suspension
Spud Date: 2010-04-28
Final Drill Date: 2010-06-12
Well Total Depth: 5200.00 m
Surface Hole Latitude: 55.075288
Surface Hole Longitude: -119.395837

For data sources see[1][2]

Well History

Date Event
2010-04-09 Obtained License
2010-04-29 Surface Casing Operation Performed
2010-05-05 Well Log Performed
2010-05-07 Direction Drilling Operation Performed - Horizontal
2010-06-12 Finished Drilling
2010-06-12 Well Log Performed
2010-06-12 Well Mode changed to Drilled and Cased
2010-06-13 Well Log Performed
2010-06-15 Production Casing Operation Performed
2010-06-16 Rig Released
2010-07-04 Well Log Performed
2010-08-24 Perforation Treatment Performed - Jet Perforation
2010-08-24 Well Fluid changed to Gas
2010-08-24 Well Mode changed to Testing
2010-08-30 Perforation Treatment Performed - Fractured
2010-09-02 Perforation Treatment Performed - Fractured
2010-09-02 Perforation Treatment Performed - Jet Perforation
2010-09-03 Perforation Treatment Performed - Fractured
2010-09-03 Perforation Treatment Performed - Jet Perforation
2010-09-04 Perforation Treatment Performed - Fractured
2010-09-04 Perforation Treatment Performed - Jet Perforation
2010-09-05 Perforation Treatment Performed - Fractured
2010-09-05 Perforation Treatment Performed - Jet Perforation
2010-09-06 Perforation Treatment Performed - Fractured
2010-09-06 Perforation Treatment Performed - Jet Perforation
2010-09-08 Perforation Treatment Performed - Jet Perforation
2010-09-09 Perforation Treatment Performed - Fractured
2010-09-10 Perforation Treatment Performed - Fractured
2010-09-10 Perforation Treatment Performed - Jet Perforation
2010-09-11 Perforation Treatment Performed - Fractured
2010-09-11 Perforation Treatment Performed - Jet Perforation
2010-09-12 Perforation Treatment Performed - Fractured
2010-09-13 Perforation Treatment Performed - Fractured
2010-09-13 Perforation Treatment Performed - Jet Perforation
2010-09-14 Perforation Treatment Performed - Fractured
2010-09-14 Perforation Treatment Performed - Jet Perforation
2010-09-15 Perforation Treatment Performed - Fractured
2010-09-15 Perforation Treatment Performed - Jet Perforation
2010-09-16 Perforation Treatment Performed - Fractured
2010-09-16 Perforation Treatment Performed - Jet Perforation
2010-09-17 Perforation Treatment Performed - Fractured
2010-09-17 Perforation Treatment Performed - Jet Perforation
2010-09-18 Perforation Treatment Performed - Fractured
2010-09-18 Perforation Treatment Performed - Jet Perforation
2010-09-29 Well Log Performed
2010-10-03 Perforation Treatment Performed - Jet Perforation
2010-10-03 Well Log Performed
2010-10-04 Perforation Treatment Performed - Remedial Casing
2010-10-06 Well Log Performed
2010-10-07 Perforation Treatment Performed - Jet Perforation
2010-10-07 Well Log Performed
2010-10-08 Well Log Performed
2010-10-09 Perforation Treatment Performed - Remedial Casing
2010-10-10 Perforation Treatment Performed - Jet Perforation
2010-10-10 Well Log Performed
2010-10-11 Perforation Treatment Performed - Remedial Casing
2010-10-12 Perforation Treatment Performed - Jet Perforation
2010-10-12 Well Log Performed
2010-10-13 Perforation Treatment Performed - Remedial Casing
2010-10-14 Perforation Treatment Performed - Jet Perforation
2010-10-14 Well Log Performed
2010-10-15 Perforation Treatment Performed - Remedial Casing
2010-10-23 Well Log Performed
2010-11-12 Well Began Production
2010-11-12 Well Fluid changed to Gas
2010-11-12 Well Mode changed to Flowing
2018-11-04 Well Log Performed
2018-11-06 Well Fluid changed to Gas
2018-11-06 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-05-07 2463.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-24 Perforation 4960.00 4963.00 20
2010-09-05 Fracture 4543.00 4546.00 0
2010-09-06 Perforation 4397.00 4400.00 20
2010-09-06 Fracture 4397.00 4400.00 0
2010-09-08 Perforation 4285.00 4286.50 20
2010-09-09 Fracture 4285.00 4286.50 0
2010-09-10 Perforation 4146.50 4148.00 20
2010-09-10 Fracture 4146.50 4148.00 0
2010-09-10 Perforation 3980.50 3982.00 20
2010-09-11 Fracture 3980.50 3982.00 0
2010-09-11 Perforation 3838.00 3839.50 20
2010-08-30 Fracture 4960.00 4963.00 0
2010-09-12 Fracture 3838.00 3839.50 0
2010-09-13 Perforation 3688.00 3689.50 20
2010-09-13 Fracture 3688.00 3689.50 0
2010-09-14 Perforation 3527.00 3528.50 20
2010-09-14 Fracture 3527.00 3528.50 0
2010-09-14 Perforation 3356.00 3357.50 20
2010-09-15 Fracture 3356.00 3357.50 0
2010-09-15 Perforation 3231.50 3233.00 20
2010-09-16 Fracture 3231.50 3233.00 0
2010-09-16 Perforation 3096.00 3097.50 20
2010-09-02 Perforation 4838.00 4841.00 20
2010-09-17 Fracture 3096.00 3097.50 0
2010-09-17 Perforation 2956.50 2958.00 20
2010-09-17 Fracture 2956.50 2958.00 0
2010-09-18 Perforation 2849.50 2851.00 20
2010-09-18 Fracture 2849.50 2851.00 0
2010-10-03 Perforation 2203.00 2205.00 20
2010-10-04 Remedial Casing Cementing 2203.00 2205.00 0
2010-10-07 Perforation 1944.00 1945.00 20
2010-10-09 Remedial Casing Cementing 1944.00 1945.00 0
2010-10-10 Perforation 1792.00 1793.00 20
2010-09-02 Fracture 4838.00 4841.00 0
2010-10-11 Remedial Casing Cementing 1792.00 1793.00 0
2010-10-12 Perforation 1405.00 1406.00 20
2010-10-13 Remedial Casing Cementing 1405.00 1406.00 0
2010-10-14 Perforation 800.00 801.00 20
2010-10-15 Remedial Casing Cementing 800.00 801.00 0
2010-09-03 Perforation 4812.00 4815.00 20
2010-09-03 Fracture 4812.00 4815.00 0
2010-09-04 Perforation 4716.00 4719.00 20
2010-09-04 Fracture 4716.00 4719.00 0
2010-09-05 Perforation 4543.00 4546.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 826 0.0 0.0 0.0
2011 4941 0.0 0.0 0.0
2012 7980 0.0 0.0 0.0
2013 5668 0.0 0.0 0.0
2014 8551 0.0 0.0 0.0
2015 8255 0.0 0.0 0.0
2016 3551 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-11-07 No Incident Encountered 0.00 0.00
2018-11-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References