If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0726073015F10 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.270954,"lon":-119.06324,"icon":""}]} |
Location: F1/15-30-072-07W6/0 | |
Location Alias: F1/15-30-72-07 W6M | |
Location Alias 2: F1/15-30-072-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 072 | |
Meridian: 6 | |
Range: 07 | |
Section: 30 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: ECA WEMBLEY 15-30-72-7 | |
Operator Name: Ovintiv Canada ULC | |
License Number: 0174666 | |
License Date: 1995-01-06 | |
License Status: Suspension | |
Spud Date: 1995-03-09 | |
Final Drill Date: 1995-03-12 | |
Well Total Depth: 550.00 m | |
Surface Hole Latitude: 55.270954 | |
Surface Hole Longitude: -119.063240 |
Date | Event |
---|---|
1995-01-06 | Obtained License |
1995-03-12 | Finished Drilling |
1995-03-12 | Production Casing Operation Performed |
1995-03-12 | Rig Released |
1995-03-12 | Well Log Performed |
1995-03-12 | Well Mode changed to Drilled and Cased |
1995-04-03 | Perforation Treatment Performed - Jet Perforation |
1995-04-03 | Well Log Performed |
1995-07-01 | Well Began Production |
1995-07-01 | Well Fluid changed to Water |
1995-07-01 | Well Type changed to Source |
1996-11-05 | Perforation Treatment Performed - Fractured |
2011-03-31 | Well Fluid changed to Water |
2011-03-31 | Well Mode changed to Suspended |
2011-03-31 | Well Type changed to Source |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-04-03 | Perforation | 482.00 | 496.00 | 26 |
1996-11-05 | Fracture | 482.00 | 496.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 1372 | 0.0 | 0.0 | 0.0 |
2003 | 4843 | 0.0 | 0.0 | 0.0 |
2004 | 2318 | 0.0 | 0.0 | 0.0 |
2005 | 694 | 0.0 | 0.0 | 0.0 |
2006 | 504 | 0.0 | 0.0 | 0.0 |
2007 | 254 | 0.0 | 0.0 | 0.0 |
2008 | 11 | 0.0 | 0.0 | 0.0 |
2009 | 2 | 0.0 | 0.0 | 0.0 |
For data sources see[5]