X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0726081114000

Well Details

Well ID: 0726081114000
Loading map...
Location: 00/14-11-072-08W6/0
Location Alias: 00/14-11-72-08 W6M
Location Alias 2: 00/14-11-072-08 W6/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 6
Range: 08
Section: 11
County/Municipality: County of Grande Prairie No. 1
Well Name: PCP WEMBLEY 14-11-72-8
Operator Name: Ovintiv Canada ULC
License Number: 0110408
License Date: 1984-10-31
License Status: Re-Entered
Spud Date: 1984-11-03
Final Drill Date: 1984-11-27
Well Total Depth: 2300.00 m
Surface Hole Latitude: 55.228156
Surface Hole Longitude: -119.118921

For data sources see[1][2]

Well History

Date Event
1984-10-31 Obtained License
1984-11-05 Surface Casing Operation Performed
1984-11-08 Water Flow Occurred
1984-11-27 Finished Drilling
1984-11-29 Well Log Performed
1984-12-01 Production Casing Operation Performed
1984-12-02 Rig Released
1984-12-12 Perforation Treatment Performed - Jet Perforation
1984-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-17 Perforation Treatment Performed - Fractured
1985-01-11 Well Mode changed to Drilled and Cased
1985-01-28 Well Began Production
1985-01-28 Well Fluid changed to Crude Oil
1985-01-28 Well Mode changed to Flowing
1985-02-11 Well Fluid changed to Crude Oil
1985-02-11 Well Mode changed to Suspended
1986-10-01 Well Fluid changed to Crude Oil
1986-10-01 Well Mode changed to Pumping
1987-01-06 Well Fluid changed to Crude Oil
1987-01-06 Well Mode changed to Suspended
1993-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-21 Perforation Treatment Performed - Jet Perforation
1993-11-21 Plug Back Performed
1993-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-22 Perforation Treatment Performed - Jet Perforation
1993-11-22 Perforation Treatment Performed - Remedial Casing
1993-11-23 Perforation Treatment Performed - Jet Perforation
1993-11-27 Perforation Treatment Performed - Jet Perforation
1993-11-27 Perforation Treatment Performed - Remedial Casing
1993-11-27 Well Fluid changed to Crude Oil
1993-11-27 Well Mode changed to Abandoned and Re-entered
1993-11-29 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-12 Perforation 2180.00 2185.00 13
1993-11-23 Perforation 287.00 300.00 4
1993-11-27 Perforation 289.70 290.30 4
1993-11-27 Remedial Casing Cementing 287.00 300.00 0
1984-12-12 Perforation 2187.00 2190.00 13
1984-12-13 Acid Treatment 2180.00 2190.00 0
1984-12-17 Fracture 2180.00 2190.00 0
1993-11-21 Packing Device Capped w/Cement 2166.00 2174.00 0
1993-11-21 Perforation 445.00 445.30 4
1993-11-22 Packing Device Capped w/Cement 439.00 447.00 0
1993-11-22 Perforation 310.00 310.50 4
1993-11-22 Remedial Casing Cementing 310.00 310.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 5 0.0 0.0 0.0
1985 429 0.0 0.0 0.0
1986 1477 0.0 0.0 0.0
1987 86 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-11-08 Water Flow 673.00 673.00

For data sources see[6]

References