X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0736123206000

Well Details

Well ID: 0736123206000
Loading map...
Location: 00/06-32-073-12W6/0
Location Alias: 00/06-32-73-12 W6M
Location Alias 2: 00/06-32-073-12 W6/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 6
Range: 12
Section: 32
County/Municipality: County of Grande Prairie No. 1
Well Name: CHIEFCO TEXCAN BRAINARD 6-32-73-12
Operator Name: Ovintiv Canada ULC
License Number: 0067113
License Date: 1977-11-29
License Status: Abandoned
Spud Date: 1977-12-02
Final Drill Date: 1977-12-21
Well Total Depth: 2154.90 m
Surface Hole Latitude: 55.364602
Surface Hole Longitude: -119.811920

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-29 Obtained License
1977-12-21 Finished Drilling
1977-12-23 Drill Stem Test Performed
1977-12-25 Production Casing Operation Performed
1978-01-28 Perforation Treatment Performed - Jet Perforation
1978-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-18 Perforation Treatment Performed - Fractured
1978-06-19 Well Mode changed to Drilled and Cased
1983-02-18 Well Began Production
1983-02-18 Well Fluid changed to Gas
1983-02-18 Well Mode changed to Flowing
1985-01-01 Well Fluid changed to Gas
1985-01-01 Well Mode changed to Suspended
1988-09-01 Well Fluid changed to Gas
1988-09-01 Well Mode changed to Flowing
1996-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-25 Perforation Treatment Performed - Jet Perforation
1996-03-25 Plug Back Performed
1996-03-26 Perforation Treatment Performed - Remedial Casing
1996-03-30 Well Abandoned
1996-03-30 Well Fluid changed to Gas
1996-03-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-28 Perforation 1917.80 1923.90 7
1978-02-10 Acid Treatment 1917.80 1923.90 0
1978-02-18 Acid Treatment 1917.80 1923.90 0
1978-02-18 Fracture 1917.80 1923.90 0
1996-03-25 Packing Device Capped w/Cement 1895.00 1903.00 0
1996-03-25 Perforation 312.00 313.00 13
1996-03-26 Remedial Casing Cementing 312.00 313.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2711 0.0 0.0 0.0
1988 1694 0.0 0.0 0.0
1989 348 0.0 0.0 0.0
1990 2584 0.0 0.0 0.0
1991 935 0.0 0.0 0.0
1992 239 0.0 0.0 0.0
1993 843 0.0 0.0 0.0

For data sources see[5]

References