X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0746123110000

Well Details

Well ID: 0746123110000
Loading map...
Location: 00/10-31-074-12W6/0
Location Alias: 00/10-31-74-12 W6M
Location Alias 2: 00/10-31-074-12 W6/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 6
Range: 12
Section: 31
County/Municipality: County of Grande Prairie No. 1
Well Name: CHIEFCO TEXCAN RAY 10-31-74-12
Operator Name: Ovintiv Canada ULC
License Number: 0065956
License Date: 1977-09-30
License Status: Abandoned
Spud Date: 1977-10-02
Final Drill Date: 1977-10-23
Well Total Depth: 2529.80 m
Surface Hole Latitude: 55.457070
Surface Hole Longitude: -119.827903

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-30 Obtained License
1977-10-23 Finished Drilling
1977-10-23 Well Log Performed
1977-10-26 Drill Stem Test Performed
1977-10-30 Production Casing Operation Performed
1978-01-30 Perforation Treatment Performed - Jet Perforation
1978-01-31 Perforation Treatment Performed - Jet Perforation
1978-02-13 Perforation Treatment Performed - Jet Perforation
1978-03-07 Well Mode changed to Drilled and Cased
1982-01-01 Well Began Production
1982-01-01 Well Fluid changed to Gas
1982-01-01 Well Mode changed to Flowing
1999-08-25 Perforation Treatment Performed - Jet Perforation
1999-08-25 Well Fluid changed to Gas
1999-08-25 Well Mode changed to Flowing
1999-08-31 Perforation Treatment Performed - Jet Perforation
1999-09-01 Perforation Treatment Performed - Cement Squeeze
1999-09-08 Perforation Treatment Performed - Jet Perforation
1999-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-09 Plug Back Performed
2001-06-09 Well Fluid changed to Gas
2001-06-09 Well Mode changed to Abandoned Zone
2001-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-10 Perforation Treatment Performed - Jet Perforation
2001-06-10 Plug Back Performed
2001-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-11 Perforation Treatment Performed - Remedial Casing
2001-06-12 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-30 Perforation 1807.50 1813.60 7
2001-06-09 Packing Device Capped w/Cement 1775.00 1783.00 0
2001-06-10 Packing Device Capped w/Cement 1330.00 1338.00 0
2001-06-10 Perforation 354.00 355.00 78
2001-06-11 Remedial Casing Cementing 354.00 355.00 0
2001-06-11 Packing Device Capped w/Cement 320.00 350.00 0
1978-01-31 Perforation 1794.70 1803.80 7
1978-02-13 Perforation 1794.70 1800.80 7
1999-08-25 Perforation 1350.00 1354.00 18
1999-08-31 Perforation 1359.00 1359.30 30
1999-09-01 Cement Squeeze 1350.00 1359.30 0
1999-09-08 Perforation 1350.00 1354.00 17
1999-09-13 Acid Treatment 1350.00 1352.00 0
1999-09-14 Acid Treatment 1350.00 1354.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1645 0.0 0.0 0.0
1983 2748 0.0 0.0 0.0
1984 214 0.0 0.0 0.0
1985 1464 0.0 0.0 0.0
1986 2833 0.0 0.0 0.0
1988 3717 0.0 0.0 0.0
1989 3722 0.0 0.0 0.0
1990 5990 0.0 0.0 0.0
1991 1880 0.0 0.0 0.0
1992 4284 0.0 0.0 0.0
1993 7890 0.0 0.0 0.0
1994 7785 0.0 0.0 0.0
1995 7095 0.0 0.0 0.0
1996 6362 0.0 0.0 0.0
1997 3056 0.0 0.0 0.0
1998 2759 0.0 0.0 0.0
1999 866 0.0 0.0 0.0

For data sources see[5]

References