If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0844060705000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.266392,"lon":-110.951329,"icon":""}]} |
Location: 00/05-07-084-06W4/0 | |
Location Alias: 00/05-07-84-06 W4M | |
Location Alias 2: 00/05-07-084-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 084 | |
Meridian: 4 | |
Range: 06 | |
Section: 07 | |
County/Municipality: Regional Municipality of Wood Buffalo | |
Well Name: NEXEN RESDELN 5-7-84-6 | |
Operator Name: CNOOC Petroleum North America ULC | |
License Number: 0195119 | |
License Date: 1996-12-13 | |
License Status: Abandoned | |
Spud Date: 1997-03-17 | |
Final Drill Date: 1997-03-18 | |
Well Total Depth: 380.00 m | |
Surface Hole Latitude: 56.266392 | |
Surface Hole Longitude: -110.951329 |
Date | Event |
---|---|
1996-12-13 | Obtained License |
1997-03-17 | Surface Casing Operation Performed |
1997-03-18 | Finished Drilling |
1997-03-18 | Well Log Performed |
1997-03-18 | Well Mode changed to Drilled and Cased |
1997-03-19 | Production Casing Operation Performed |
1997-03-19 | Rig Released |
1997-03-21 | Perforation Treatment Performed - Jet Perforation |
1997-12-06 | Perforation Treatment Performed - Jet Perforation |
1997-12-06 | Well Log Performed |
1998-02-01 | Well Log Performed |
1998-03-03 | Perforation Treatment Performed - Jet Perforation |
1998-03-03 | Perforation Treatment Performed - Remedial Casing |
1998-03-03 | Well Log Performed |
1998-03-08 | Well Log Performed |
1998-03-09 | Perforation Treatment Performed - Jet Perforation |
1998-03-09 | Well Log Performed |
1998-03-27 | Well Began Production |
1998-03-27 | Well Fluid changed to Gas |
1998-03-27 | Well Mode changed to Flowing |
2003-09-02 | Well Fluid changed to Gas |
2003-09-02 | Well Mode changed to Suspended |
2004-03-01 | Well Fluid changed to Gas |
2004-03-01 | Well Mode changed to Flowing |
2004-07-01 | Well Fluid changed to Gas |
2004-07-01 | Well Mode changed to Suspended |
2017-03-02 | Perforation Treatment Performed - Jet Perforation |
2017-03-02 | Well Log Performed |
2017-03-03 | Perforation Treatment Performed - Jet Perforation |
2017-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-03-04 | Perforation Treatment Performed - Cement Squeeze |
2017-03-04 | Perforation Treatment Performed - Remedial Casing |
2017-03-04 | Plug Back Performed |
2017-03-04 | Well Fluid changed to Gas |
2017-03-04 | Well Mode changed to Abandoned Zone |
2017-03-06 | Perforation Treatment Performed - Jet Perforation |
2017-03-06 | Well Log Performed |
2017-03-07 | Perforation Treatment Performed - Cement Plug |
2017-03-07 | Perforation Treatment Performed - Remedial Casing |
2017-03-07 | Plug Back Performed |
2017-03-16 | Well Abandoned |
2017-03-16 | Well Fluid changed to Gas |
2017-03-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-03-21 | Perforation | 312.00 | 317.00 | 13 |
2017-03-02 | Perforation | 368.50 | 370.50 | 17 |
2017-03-03 | Perforation | 307.00 | 309.00 | 17 |
2017-03-04 | Remedial Casing Cementing | 368.50 | 370.50 | 0 |
2017-03-04 | Cement Squeeze | 312.00 | 317.00 | 0 |
2017-03-04 | Remedial Casing Cementing | 307.00 | 309.00 | 0 |
2017-03-04 | Packing Device Capped w/Cement | 300.00 | 365.00 | 0 |
2017-03-06 | Perforation | 294.00 | 295.90 | 17 |
2017-03-07 | Remedial Casing Cementing | 294.00 | 295.90 | 0 |
2017-03-07 | Cement Plug | 163.90 | 300.00 | 0 |
1997-12-06 | Perforation | 321.00 | 322.00 | 20 |
1998-03-03 | Perforation | 302.50 | 303.50 | 20 |
1998-03-03 | Remedial Casing Cementing | 321.00 | 322.00 | 0 |
1998-03-03 | Remedial Casing Cementing | 302.50 | 303.50 | 0 |
1998-03-03 | Perforation | 239.50 | 240.50 | 20 |
1998-03-03 | Remedial Casing Cementing | 239.50 | 240.50 | 0 |
1998-03-09 | Perforation | 312.00 | 315.00 | 20 |
1998-03-09 | Perforation | 315.50 | 317.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 6576 | 0.0 | 0.0 | 0.0 |
1999 | 8638 | 0.0 | 0.0 | 0.0 |
2000 | 8610 | 0.0 | 0.0 | 0.0 |
2001 | 8066 | 0.0 | 0.0 | 0.0 |
2002 | 8482 | 0.0 | 0.0 | 0.0 |
2003 | 5653 | 0.0 | 0.0 | 0.0 |
2004 | 2901 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1998-03-09 | No Incident Encountered | 0.00 | 0.00 |
2016-03-23 | No Incident Encountered | 0.00 | 0.00 |
2017-03-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]