X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0844071314AC0

Well Details

Well ID: 0844071314AC0
Loading map...
Location: AC/14-13-084-07W4/0
Location Alias: AC/14-13-84-07 W4M
Location Alias 2: AC/14-13-084-07 W4/00
Country: Canada
Province: Alberta
Township: 084
Meridian: 4
Range: 07
Section: 13
County/Municipality: Regional Municipality of Wood Buffalo
Well Name: NEXEN OPTI SW RESDELN 14-13-84-7
Operator Name: CNOOC Petroleum North America ULC
License Number: 0439428
License Date: 2011-11-23
License Status: Abandoned
Spud Date: 2012-02-05
Final Drill Date: 2012-02-09
Well Total Depth: 406.00 m
Surface Hole Latitude: 56.286460
Surface Hole Longitude: -110.971748

For data sources see[1][2]

Well History

Date Event
2011-11-23 Obtained License
2012-02-05 Surface Casing Operation Performed
2012-02-09 Finished Drilling
2012-02-09 Well Log Performed
2012-02-09 Well Mode changed to Drilled and Cased
2012-02-11 Production Casing Operation Performed
2012-02-12 Rig Released
2012-02-23 Well Log Performed
2012-03-07 Perforation Treatment Performed - Bridge Plug No Cement Required
2012-03-07 Perforation Treatment Performed - Fractured
2012-03-07 Perforation Treatment Performed - Jet Perforation
2012-03-09 Perforation Treatment Performed - Fractured
2012-03-09 Perforation Treatment Performed - Jet Perforation
2012-03-17 Perforation Treatment Performed - Cement Plug
2012-03-17 Plug Back Performed
2012-03-17 Well Abandoned
2012-03-17 Well Mode changed to Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-05 Encore Coring & Drilling Inc. 454 N/A Drill To LD

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-07 Perforation 315.00 315.50 20
2012-03-17 Cement Plug 6.80 307.70 0
2012-03-07 Fracture 315.00 315.50 0
2012-03-07 Bridge Plug, No Cement 307.70 308.30 0
2012-03-07 Perforation 283.50 284.00 20
2012-03-07 Fracture 283.50 284.00 0
2012-03-07 Perforation 275.00 275.50 20
2012-03-07 Fracture 275.00 275.50 0
2012-03-09 Perforation 261.50 262.00 20
2012-03-09 Fracture 261.50 262.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-09 No Incident Encountered 0.00 0.00
2012-03-09 No Incident Encountered 0.00 0.00
2012-03-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References