X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0875083304000

Well Details

Well ID: 0875083304000
Loading map...
Location: 00/04-33-087-08W5/0
Location Alias: 00/04-33-87-08 W5M
Location Alias 2: 00/04-33-087-08 W5/00
Country: Canada
Province: Alberta
Township: 087
Meridian: 5
Range: 08
Section: 33
County/Municipality: Municipal District of Opportunity No. 17
Well Name: BALLATER ET AL REDE 4-33-87-8
Operator Name: Vermilion Energy Inc.
License Number: 0094130
License Date: 1981-12-23
License Status: RecCertified
Spud Date: 1981-12-30
Final Drill Date: 1982-01-13
Well Total Depth: 1517.60 m
Surface Hole Latitude: 56.583179
Surface Hole Longitude: -115.222358

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-12-23 Obtained License
1982-01-13 Finished Drilling
1982-01-13 Well Mode changed to Drilled and Cased
1982-01-16 Production Casing Operation Performed
1982-03-13 Perforation Treatment Performed - Jet Perforation
1982-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-03-15 Well Began Production
1982-03-15 Well Fluid changed to Crude Oil
1982-03-15 Well Mode changed to Pumping
1986-03-06 Well Fluid changed to Crude Oil
1986-03-06 Well Mode changed to Suspended
1986-04-01 Well Fluid changed to Crude Oil
1986-04-01 Well Mode changed to Pumping
1986-05-01 Well Fluid changed to Crude Oil
1986-05-01 Well Mode changed to Suspended
1986-07-01 Well Fluid changed to Crude Oil
1986-07-01 Well Mode changed to Pumping
1986-07-15 Well Fluid changed to Crude Oil
1986-07-15 Well Mode changed to Suspended
1986-08-10 Well Fluid changed to Crude Oil
1986-08-10 Well Mode changed to Pumping
1986-08-12 Well Fluid changed to Crude Oil
1986-08-12 Well Mode changed to Suspended
1991-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-26 Plug Back Performed
1991-01-26 Well Abandoned
1991-01-26 Well Fluid changed to Crude Oil
1991-01-26 Well Log Performed
1991-01-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-13 Perforation 1330.00 1334.00 7
1982-03-14 Acid Treatment 1330.00 1334.00 0
1991-01-26 Packing Device Capped w/Cement 1315.00 1323.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 4895 0.0 0.0 0.0
1983 7108 0.0 0.0 0.0
1984 7829 0.0 0.0 0.0
1985 8627 0.0 0.0 0.0
1986 2286 0.0 0.0 0.0

For data sources see[5]

References