X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1125223602000

Well Details

Well ID: 1125223602000
Loading map...
Location: 00/02-36-112-22W5/0
Location Alias: 00/02-36-12-22 W5M
Location Alias 2: 00/02-36-112-22 W5/00
Country: Canada
Province: Alberta
Township: 112
Meridian: 5
Range: 22
Section: 36
County/Municipality: Mackenzie County
Well Name: CDNOXY ET AL HUTCH 2-36-112-22
Operator Name: CNOOC Petroleum North America ULC
License Number: 0122700
License Date: 1986-02-26
License Status: Re-Entered
Spud Date: 1986-02-27
Final Drill Date: 1986-03-18
Well Total Depth: 1478.00 m
Surface Hole Latitude: 58.763983
Surface Hole Longitude: -117.558920

For data sources see[1][2]

Well History

Date Event
1986-02-26 Obtained License
1986-02-28 Surface Casing Operation Performed
1986-03-09 Drill Stem Test Performed
1986-03-18 Finished Drilling
1986-03-18 Well Log Performed
1986-03-21 Drill Stem Test Performed
1986-03-22 Plug Back Performed
1986-03-23 Production Casing Operation Performed
1986-03-23 Rig Released
1986-03-23 Well Mode changed to Drilled and Cased
1986-03-26 Well Log Performed
1986-03-27 Perforation Treatment Performed - Jet Perforation
1986-03-27 Well Log Performed
1986-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-02 Well Began Production
1986-12-02 Well Fluid changed to Crude Oil
1986-12-02 Well Mode changed to Pumping
1987-03-21 Well Fluid changed to Crude Oil
1987-03-21 Well Mode changed to Suspended
1993-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-02-25 Plug Back Performed
1993-02-25 Well Fluid changed to Crude Oil
1993-02-25 Well Mode changed to Abandoned and Re-entered
1993-02-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-03-27 Perforation 1107.00 1111.00 13
1986-03-28 Acid Treatment 1107.00 1111.00 0
1993-02-25 Packing Device Capped w/Cement 1094.00 1102.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 497 0.0 0.0 0.0
1987 1664 0.0 0.0 0.0

For data sources see[5]

References