X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-21656

Well Details

Well ID: 34-019-21656
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Brown Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID:
Farm/Lease Name: EVANICH
License Status: Producing
License Date: 1983-09-01
Spud Date: 1983-10-03
Spud Drilling Contractor: SHERMAN DRLG
Final Drill Date: 1983-10-08
Well Total Depth: 5181.00 ft
Configuration: Vertical
Latitude: 40.710000
Longitude: -81.230000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1983-09-01 Issued Date 9/1/83 Expired Date 2/28/84 Acres 0080000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05181 Proposed Drill Depth 05181
Completed 1983-10-08
Reached Total Depth 1983-10-08
CO 1983-10-29 182 BELDEN & BLAKE CO GeoDate 9/1/83
Completion Report Received 1983-11-14
Original Spud 1983-12-03
Construction Permit Expires 1984-02-28
Change of Owner 2007-04-27 Operator changed from 182, BELDEN & BLAKE CORPORATION to 7578, ENERVEST OPERATING LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4960 5074 0
4960 5074 0
2006-09-11 4988 5031 21
4988 5031 21
4960 5074 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 0 100000 FRAC;H2O,100M# SD

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 WITCO CORP 3535.00 3996.00 365
1985 WITCO CORP 2051.00 2461.00 365
1986 WITCO CORP 1077.00 1811.00 365
1987 BELDEN & BLAKE CORPORATION 1019.00 1396.00 365
1988 BELDEN & BLAKE CORPORATION 2155.00 2056.00 353
1990 BELDEN & BLAKE CORPORATION 2271.00 1831.00 314
1991 BELDEN & BLAKE CORPORATION 1713.00 1993.00 365
1992 BELDEN & BLAKE CORPORATION 1700.00 1165.00 333
1993 BELDEN & BLAKE CORPORATION 2264.00 1555.00 342
1994 BELDEN & BLAKE CORPORATION 1856.00 1593.00 356
1995 BELDEN & BLAKE CORPORATION 1320.00 1173.00 337
1996 BELDEN & BLAKE CORPORATION 1644.00 1335.00 366
1997 BELDEN & BLAKE CORPORATION 1796.00 1001.00 365
1998 BELDEN & BLAKE CORPORATION 1702.00 930.00 365
1999 BELDEN & BLAKE CORPORATION 1318.00 994.00 365
2000 BELDEN & BLAKE CORPORATION 1108.00 1094.00 359
2001 BELDEN & BLAKE CORPORATION 632.00 495.00 370
2002 BELDEN & BLAKE CORPORATION 692.00 731.00 353
2003 BELDEN & BLAKE CORPORATION 645.00 504.00 358
2004 BELDEN & BLAKE CORPORATION 575.00 537.00 366
2005 BELDEN & BLAKE CORPORATION 662.00 550.00 365
2006 BELDEN & BLAKE CORPORATION 723.00 386.00 365
2007 ENERVEST OPERATING LLC 796.00 563.00 365
2008 ENERVEST OPERATING LLC 822.00 377.00 365
2009 ENERVEST OPERATING LLC 831.00 445.00 365
2010 ENERVEST OPERATING LLC 1025.00 384.00 365
2011 ENERVEST OPERATING LLC 845.00 357.00 0
2012 ENERVEST OPERATING LLC 614.00 110.00 366
2013 ENERVEST OPERATING LLC 624.00 0.00 365
2014 ENERVEST OPERATING LLC 153.00 384.00 365
2015 ENERVEST OPERATING LLC 487.00 296.00 365
2016 ENERVEST OPERATING LLC 340.00 217.00 366
2017 ENERVEST OPERATING LLC 148.00 49.00 365
2018 ENERVEST OPERATING LLC 427.00 189.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 WITCO CORP Brine 0 365
1985 WITCO CORP Brine 1885 365
1986 WITCO CORP Brine 710 365
1987 BELDEN & BLAKE CORPORATION Brine 485 365
1988 BELDEN & BLAKE CORPORATION Brine 733 353
1990 BELDEN & BLAKE CORPORATION Brine 784 314
1991 BELDEN & BLAKE CORPORATION Brine 823 365
1992 BELDEN & BLAKE CORPORATION Brine 600 333
1993 BELDEN & BLAKE CORPORATION Brine 691 342
1994 BELDEN & BLAKE CORPORATION Brine 815 356
1995 BELDEN & BLAKE CORPORATION Brine 452 337
1996 BELDEN & BLAKE CORPORATION Brine 677 366
1997 BELDEN & BLAKE CORPORATION Brine 613 365
1998 BELDEN & BLAKE CORPORATION Brine 539 365
1999 BELDEN & BLAKE CORPORATION Brine 486 365
2000 BELDEN & BLAKE CORPORATION Brine 527 359
2001 BELDEN & BLAKE CORPORATION Brine 184 370
2002 BELDEN & BLAKE CORPORATION Brine 198 353
2003 BELDEN & BLAKE CORPORATION Brine 266 358
2004 BELDEN & BLAKE CORPORATION Brine 175 366
2005 BELDEN & BLAKE CORPORATION Brine 196 365
2006 BELDEN & BLAKE CORPORATION Brine 182 365
2007 ENERVEST OPERATING LLC Brine 142 365
2008 ENERVEST OPERATING LLC Brine 151 365
2009 ENERVEST OPERATING LLC Brine 173 365
2010 ENERVEST OPERATING LLC Brine 168 365
2011 ENERVEST OPERATING LLC Brine 152
2012 ENERVEST OPERATING LLC Brine 42 366
2013 ENERVEST OPERATING LLC Brine 0 365
2014 ENERVEST OPERATING LLC Brine 421 365
2015 ENERVEST OPERATING LLC Brine 238 365
2016 ENERVEST OPERATING LLC Brine 164 366
2017 ENERVEST OPERATING LLC Brine 125 365
2018 ENERVEST OPERATING LLC Brine 143 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1124837928 2015-5-28 0:00: PW No Violations 1.50
-1726135785 2018-4-19 0:00: PW No Violations 0.60
-1856430328 2015-3-30 0:00: PW No Violations 1.00
-257669981 2015-4-13 0:00: PW No Violations 1.00
-754587210 2015-4-7 0:00:0 PW No Violations 1.00
0257669981 2015-04-13 Production Wells No Violations I was on location to follow up to the oil spill that occurred on 3/22/2015. The soft booms and siphon damns have been removed and no additional oil can be seen. Enervest has installed the required silt fence, but has not seeded the hillside on location. The 300bbl production tank is still on location and is awaiting removal. A follow up will be conducted to ensure the spill has been properly remediated.
0754587210 2015-04-07 Production Wells No Violations I was on location to follow up to the oil spill that occurred on 3/22/2015. The soft booms and siphon damns are still in place to ensure no oil moves down the creek. An oil sheen and small amounts of oil are still entering the stream from the hillside. Enervest will be required to install silt fence and seed the hillside on location and the hillside to prevent erosion of the hillside into the stream. A follow up will be conducted to ensure the spill has been properly remediated.
1124837928 2015-05-28 Production Wells No Violations I was on location to follow up to the oil spill that occurred on 3/22/2015. There is no more oil on location or entering the stream. The silt fence has been installed and the location has been seeded. Vegetation has only been partially established. The stuffing box on the wellhead is leaking and there is fresh oil inside the dike of the well. I have contacted Troy Wells of Enervest requesting the stuffing box be replaced to stop the flow of oil from the wellhead, and all free oil be cleaned up. When vegetation is established on the hillside and the stuffing box repaired the compliance notice will be closed. A follow up will be conducted to ensure the spill has been properly remediated.
1427215382 2015-03-22 Production Wells Violations Noted I was on location to respond to a call regarding an oil spill from well #21696 shared with this tank battery. The tank battery for the well is contained within a worn dike and has I.D. signage, two (2) horizontal separators, house gas connection, a 140bbl production tank and concrete brine vault. An unmarked 300bbl production tank was sitting outside of the dike and is currently unused. The well is an electrically driven pumpjack well with invalid identification stating Belden and Blake as the operator. The soil surrounding the wellhead has approximately 1 bbl of fresh oil spilled surrounding the wellhead. The wellhead is covered in heavy paraffin. The well was shut in to prevent any additional oil spill. Enervest has been informed that the leaking wellhead must be repaired, the spill around the wellhead cleaned up and proper identification placed on the pumpjack. The unused 300bbl production tank shall be removed from the location. The oil spill must be cleaned up and the surrounding soil cleaned up of any free oil, and a proper identification sign must be installed before the compliance notice will be closed.
1612783167 2015-07-06 Production Wells No Violations I was on location to follow up to the oil spill that occurred on 3/22/2015. There is no more oil on location or entering the stream. The silt fence has been installed and the location has been seeded. Vegetation has been established. The stuffing box on the well has been fixed and is not leaking oil. At this time the spill has been remediated and the compliance notice has been closed.
1688826736 2017-02-10 Production Wells No Violations I conducted a status check of this well. The well is equipped with an electrically-driven pumpjack and the production valves were in the open position. The tank battery shares production equipment with PN#21696 and consists of one 210 bbl production tank, two vertical separators, one horizontal separators, and one meter run with a current 31-day chart. The tank battery was surrounded by a dike. The load line to the tanks production valve was equipped with a lock and plug. Identification was posted at the well and tank battery.
1726135785 2018-04-19 Production Wells No Violations The well is equipped with a pumping unit. The tank battery is shared with PN#21696. No violations were observed at the time of inspection.
1775870613 2015-04-28 Production Wells No Violations I was on location to follow up to the oil spill that occurred on 3/22/2015. There is no more oil on location or entering the stream. The silt fence has been installed and the location has been seeded. Vegetation has only been partially established. The 300bbl tank has been removed from location and the area around the tank battery has been graded and a new dike installed. When vegetation is established on the hillside the compliance notice will be closed. A follow up will be conducted to ensure the spill has been properly remediated.
1856430328 2015-03-30 Production Wells No Violations I was on location to follow up to the oil spill that occurred on 3/22/2015. Currently Enervest is skimming oil from the surface of the creek before the siphon damns placed in the creek. The Ohio EPA has approved the removal of the hard booms from the stream. The soft booms and siphon damns will stay in place to ensure no oil moves down the creek. Enervest will be required to install silt fence and seed the hillside on location and the hillside to prevent erosion of the hillside into the stream. A follow up will be conducted to ensure the spill has been properly remediated.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1427215382 US-OH-112465 2015-07-20 Well operation causing pollution and contamination
1427215382 US-OH-112466 2015-07-20 Failure to legibly identify well

For data sources see[9]

References