If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22431 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.52,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Union Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000797 | |
Farm/Lease Name: MITCHELL 34-13-5 | |
License Status: Drilling | |
License Date: 2017-09-08 | |
Spud Date: 2013-08-27 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 40.520000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-20 | Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/20/2013, Expired Date:5/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-09-16 | Proposed Formations:POINT PLEASANT, Issued Date:9/16/2013, Expired Date:9/16/2015 12:00:00 PM, Drilling unit acres:319.07, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2015-10-01 | Proposed Formations:POINT PLEASANT, Issued Date:10/1/2015, Expired Date:9/30/2017 12:00:00 PM, Drilling unit acres:319.07, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2017-09-08 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:9/8/2017, Expired Date:9/8/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Record Last Modified | 2017-10-23 | |
Construction Permit Expires | 2019-09-08 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-443658118 | 2017-10-19 0:00 | PW | No Violations | |
0443658118 | 2017-10-19 | Production Wells | No Violations |
I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. Three producing wells were located on the pad #(22429, 22430, 22433). The well is equipped with a plunger lift unit. There were also three wells on site that were drilled to conductor depth and were capped #(22431, 22432, 22434). The equipment on the pad consists of the following: 6 - 400 bbl production tanks, three labelled as containing produced water, and three labelled as containing condensate. The tanks were surrounded by a steel dike. 1 Low pressure vertical separator 6 Sand separators 6 Gas processing units 1 Heat Treater 1 Combustor unit. The access road was stable and drivable. No violations were noted at the time of inspection. |
0466945404 | 2013-08-29 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Precision Rathole has drilled a 30 inch hole to a total depth of 120 feet and ran 117 feet of 20 inch casing into the well bore. Allied cemented the casing with 460 sacks of Class A (2% CaCl and 1/2 pound per sack cello flake) with a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and used 5.2 gallons of freshwater per sack of mix water. They pumped 97 barrels of cement slurry, displaced with 39 barrels of freshwater, and got 24 barrels of cement returns to surface. My inspection revealed no violations at this time. |
1680857098 | 2013-08-28 | Drill / Deepen / Reopen | No Violations | I was on site to check the status of Precision Ratholes conductor rig (accompanied by Kyle Tharpe). My inspection revealed that they are reaming out the 26 inch hole to a 30 inch hole because there is a deviation in the hole at approximately 80 feet. Gary (Precision Rathole) advised that they were going to have to ream the 1H, 3H, and 5H conductor holes with the 30 inch auger so they would be able to get the conductor casing into the well bore. He also advised that they were hoping to be ready to start cementing these conductors tomorrow around noon. Our inspection revealed no violations at this time. |
466945404 | 2013-8-29 0:00: | DD | No Violations | 3.00 |
For data sources see[3]