Well ID: 34-055-20170 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.38,"lon":-81.02,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Parkman Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: STOLL DERLIN | |
License Status: Producing | |
License Date: 1982-07-22 | |
Spud Date: 1976-03-28 | |
Spud Drilling Contractor: | |
Final Drill Date: 1976-04-08 | |
Well Total Depth: 4090.00 ft | |
Configuration: Vertical | |
Latitude: 41.380000 | |
Longitude: -81.020000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1976-03-28 | REV. LOC. & R.I. 1-28-76 |
Completed | 1976-04-08 | REV. LOC. & R.I. 1-28-76 |
Reached Total Depth | 1976-04-08 | REV. LOC. & R.I. 1-28-76 |
CO | 1982-07-22 | 9 EDC GeoDate 7/22/82 |
Correction to Well | 2007-07-13 | UNIT REDUCED TO 58.30 ACRES. |
Change of Owner | 2008-07-21 | Operator changed from 9, POWER GAS MARKETING & TRANS to 1388, EXCO - NORTH COAST ENERGY INC |
Change of Owner | 2009-12-14 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
Record Last Modified | 2019-06-14 | REV. LOC. & R.I. 1-28-76 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3952 | 4024 | 27 |
2006-09-11 | 3961 | 3977 | 9 |
3952 | 4024 | 27 | |
3952 | 4024 | 27 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 181 Mscf | 0 | |||
GEL | 0 | 68000 Gal | 50000 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1286559731 | 2013-3-27 0:00: | PW | No Violations | |
-322639392 | 2012-3-29 0:00: | PW | No Violations | |
-547044091 | 2018-8-23 0:00: | PW | No Violations | |
0101859641 | 2014-08-28 | Production Wells | No Violations | My inspection found the production tank was removed and replaced with a new 100 BBL tank. The oil contaminated soil has been removed from inside the dike and the dike was rebuilt. No violations found. |
0322639392 | 2012-03-29 | Production Wells | No Violations | I was on site in regards to a water well complaint to the east of this well site. The tank battery is equipped with one 100 barrel production tank and a cement brine tank. The brine tank is 3/4 underground and there was minor seeping at the top seam of the tank. The fluid level in the tank was 6 from the top. I meet the Enervest well tender (Joe) who stated he had not used this tank and the fluid in it must be rain water. I requested that it be emptied as there is crude oil floating on top of the water. The vegetation around the tank battery was lush, with no indication of scalding. The well head was leaking from the annulus. The pressure on the annulus gauge indicated 50 PSI. The surface casing was set at 340. My calculations show that 72.11 PSI is the allowable pressure on the annulus. I requested that he install a fitting on the annulus plumbing to allow for a Division of Oil and Gas pressure gauge to be used as needed. |
0547044091 | 2018-08-23 | Production Wells | No Violations | I conducted an inspection on this well. The well was equipped with a plunger lift assembly and the well was in production. Production records were current. The tank battery consisted of one 100 BBL tank and a mechanical separator. Valves on the separator were open. The tank battery was diked with legible signage. Lease access was stable. |
0597396628 | 2008-09-17 | Production Wells | No Violations | Tank battery has one 100BBl tank heat treat separator. Well is a rabbit well. Spacing is good. ID sign is posted. Lease road is stable. |
101859641 | 2014-8-28 0:00: | PW | No Violations | |
1286559731 | 2013-03-27 | Production Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The well and tank battery are in good repair. The tank battery consists of a 100 BBL production tank, a buried concrete brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1409319192 | 2014-08-27 | Production Wells | Violations Noted | I was called to the location by Enervest Supervisor Kyle Ahbel. The 100 BBL production tank has rusted through at the base of the tank releasing 20 gallons of oil. Everything was contained inside the dike. The company needs to remove or repair the tank. The oil contaminated soil needs removed from inside the tank battery and the South side of the dike needs rebuilt. The issue needs resolved by 8/28/2014. |
597396628 | 2008-9-17 0:00: | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1409319192 | US-OH-112057 | 2014-09-10 | No SPCC dike/or failure to keep dike free of water or oil |
For data sources see[9]