If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-22025 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.39,"lon":-81.09,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Parkman Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: HERSHBERGER UNIT | |
License Status: Producing | |
License Date: 2008-04-07 | |
Spud Date: 2008-09-24 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2008-09-29 | |
Well Total Depth: 4395.00 ft | |
Configuration: Vertical | |
Latitude: 41.390000 | |
Longitude: -81.090000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-04-07 | Proposed Formations:CLINTON, Issued Date:4/7/2008, Expired Date:4/7/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Change of Owner | 2008-07-21 | Operator changed from 9, POWER GAS MARKETING & TRANS to 1388, EXCO - NORTH COAST ENERGY INC |
Reached Total Depth | 2008-09-29 | |
Completion Report Received | 2009-03-03 | |
Construction Permit Expires | 2009-04-07 | |
Change of Owner | 2009-12-14 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-05-21 | 4148 | 4230 | 36 |
4148 | 4230 | 36 | |
4148 | 4230 | 36 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1212 Bbl | 80000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | EXCO - NORTH COAST ENERGY INC | 794.00 | 368.00 | 70 |
2009 | ENERVEST OPERATING LLC | 2350.00 | 113.00 | 92 |
2010 | ENERVEST OPERATING LLC | 1670.00 | 1339.00 | 365 |
2011 | ENERVEST OPERATING LLC | 2359.00 | 1030.00 | 0 |
2012 | ENERVEST OPERATING LLC | 2897.00 | 854.00 | 366 |
2013 | ENERVEST OPERATING LLC | 1844.00 | 758.00 | 365 |
2014 | ENERVEST OPERATING LLC | 1791.00 | 466.00 | 365 |
2015 | ENERVEST OPERATING LLC | 1568.00 | 624.00 | 365 |
2016 | ENERVEST OPERATING LLC | 1674.00 | 366.00 | 366 |
2017 | ENERVEST OPERATING LLC | 1110.00 | 475.00 | 365 |
2018 | ENERVEST OPERATING LLC | 1359.00 | 341.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | EXCO - NORTH COAST ENERGY INC | Brine | 204 | 70 |
2009 | EXCO - NORTH COAST ENERGY INC | Brine | 436 | 365 |
2010 | ENERVEST OPERATING LLC | Brine | 228 | 365 |
2011 | ENERVEST OPERATING LLC | Brine | 276 | |
2012 | ENERVEST OPERATING LLC | Brine | 208 | 366 |
2013 | ENERVEST OPERATING LLC | Brine | 181 | 365 |
2014 | ENERVEST OPERATING LLC | Brine | 115 | 365 |
2015 | ENERVEST OPERATING LLC | Brine | 39 | 365 |
2016 | ENERVEST OPERATING LLC | Brine | 65 | 366 |
2017 | ENERVEST OPERATING LLC | Brine | 54 | 365 |
2018 | ENERVEST OPERATING LLC | Brine | 140 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1207087492 | 2014-11-14 0:00 | PW | No Violations | |
-233563706 | 2015-10-23 0:00 | PW | No Violations | |
-383699591 | 2016-4-13 0:00: | PW | No Violations | |
-889988982 | 2011-6-29 0:00: | PL | No Violations | |
0233563706 | 2015-10-23 | Production Wells | No Violations | My inspection found no changes since my last inspection. No violations found. |
0383699591 | 2016-04-13 | Production Wells | No Violations | My inspection found the contaminated soil has been removed from the well location. The syphon dam that was in place has been removed and graded out across the location. The leak on the pumpjack motor needs repaired and the oil contaminated leaves and stone from under the pumpjack needs removed. I contacted Kyle Ahbel a supervisor with Enervest about the issue and he stated he would send his well tender over and have it cleaned up immediately. |
0889988982 | 2011-06-29 | Preliminary Restoration | No Violations | Well site has been graded and seeded. Well is a rabbit well. Tank battery is in good repair. Spacing is correct. Portable heating unit on site. Heating unit is shut off. Lease road is stable, rock to site. |
1207087492 | 2014-11-14 | Production Wells | No Violations | My inspection found the well to be equipped with a pump jack. The annulus valve was open and plumbed to the production tank. The tank battery and well are in good repair. The tank battery consists of a 210 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1222201251 | 2008-09-23 | Drill / Deepen / Reopen | No Violations | Lease road is stable and constructed out of durable material. Pit construction has been finished. Pits are in good clay. No water noted leaking into pits, they were dry. Site is in good repair. Rig will be moving on Wednesday. |
1222365614 | 2008-09-25 | Drill / Deepen / Reopen | No Violations | CND has been set. Drill depth 240. Pits are in good repair. Lease road is stable. Site is in good repair. |
1364918629 | 2013-04-02 | Production Wells | No Violations | My inspection found the well to be equipped with a pump jack. The annulus valve was open and plumbed to the production tank. The tank battery and well are in good repair. The tank battery consists of a 210 BBL production tank, a 50 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1458234241 | 2016-03-15 | Production Wells | No Violations | I was notified by Enervest supervisor Kyle Ahbel of a spill at this well. He stated he was in route to the location and his well tender believes there to be approximately 10 BBLs of crude oil on the ground. I notified Emergency Response of the spill and Inspector Dinsmore was responding as well. |
1794106286 | 2016-03-16 | Production Wells | No Violations | The oil saturated soil is stacked in a pile next to the well. Scott Miller of Scott Miller Construction was on location loading the last of the contaminated soil into a container to be taken to Waste Managements landfill. The clean up of the location should be complete by the end of the day. I will return to the location on 3/18/2016. |
For data sources see[9]