X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-059-24168

Well Details

Well ID: 34-059-24168
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Liberty Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID:
Farm/Lease Name: WARD UNIT
License Status: Producing
License Date: 2010-12-09
Spud Date: 2010-11-18
Spud Drilling Contractor: UNION DRLG
Final Drill Date: 2010-12-29
Well Total Depth: 7604.00 ft
Configuration: Directional
Latitude: 40.160000
Longitude: -81.590000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-07-30 Proposed Formations:BEEKMANTOWN, Issued Date:7/30/2010, Expired Date:7/29/2012 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:EOUT
Change of Owner 2010-12-08 Operator changed from 8587, ANSCHUTZ EXPLORATION CORP to 8705, OHIO BUCKEYE ENERGY LLC
APP 2010-12-09 Proposed Formations:BEEKMANTOWN, Issued Date:12/9/2010, Expired Date:12/8/2012 12:00:00 PM, Drilling unit acres:160, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2010-12-29
Change of Owner 2011-01-26 Operator changed from 8705, OHIO BUCKEYE ENERGY LLC to 7578, ENERVEST OPERATING L
Correction to Well 2011-02-25 CORRECTION TO LOCATION INFORMATION, FROM "AS DRILLED SURVEY". SURFACE: FOOTAGE= 728'NL & 262'WL OF NE QTR., SEC. 24; X= 2,253,172 AND Y= 788,925. TARGET: FOOTAGE= 880'NL & 1880'EL OF SEC. 24; X= 2,253,777 AND Y= 788,765.
Completion Report Received 2011-03-07
Construction Permit Expires 2012-12-08
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-06-06 7230 7337 165
7230 7337 165
7230 7337 165

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-01-25 ACID 15 8000 Gal 0 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 ENERVEST OPERATING LLC 0.00 0.00 0
2011 ENERVEST OPERATING LLC 297717.00 913.00 0
2012 ENERVEST OPERATING LLC 231254.00 653.00 366
2013 ENERVEST OPERATING LLC 155568.00 463.00 365
2014 ENERVEST OPERATING LLC 115967.00 128.00 365
2015 ENERVEST OPERATING LLC 94077.00 168.00 365
2016 ENERVEST OPERATING LLC 78154.00 173.00 366
2017 ENERVEST OPERATING LLC 62009.00 81.00 351
2018 ENERVEST OPERATING LLC 53026.00 80.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 ENERVEST OPERATING LLC Brine 0 0
2011 ENERVEST OPERATING LLC Brine 168
2012 ENERVEST OPERATING LLC Brine 63 366
2013 ENERVEST OPERATING LLC Brine 50 365
2014 ENERVEST OPERATING LLC Brine 48 365
2015 ENERVEST OPERATING LLC Brine 32 365
2016 ENERVEST OPERATING LLC Brine 11 366
2017 ENERVEST OPERATING LLC Brine 30 351
2018 ENERVEST OPERATING LLC Brine 16 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1185159514 2010-11-29 0:00 DD No Violations
-146865093 2011-1-3 0:00:0 DD No Violations
-1681932324 2010-12-23 0:00 DD No Violations
-1752538637 2011-6-23 0:00: PL No Violations
-1851931213 2017-10-5 0:00: PW No Violations 0.50
-1891664488 2010-11-24 0:00 DD No Violations
-342751576 2020-4-22 0:00: PW No Violations 1.00
-493905583 2010-12-6 0:00: DD No Violations
-789655912 2010-12-20 0:00 DD No Violations
0146865093 2011-01-03 Drill / Deepen / Reopen No Violations UDI moving equipment off location told company rep Buba Huey to call when they were ready to bond log well to check cement top and also when they were ready to close pit.
0493905583 2010-12-06 Drill / Deepen / Reopen No Violations Stopped by drill rig for update on upcoming intermediate string job they were 3705 deep coming out of hole to log well and then they will start to run 7 casing through Oriskany sand and cement it back to surface, well is located in storage field owned by Columbia Gas.
0786088744 2010-12-16 Drill / Deepen / Reopen No Violations Inspection revealed that rig was preparing to trip bit@5910 drilling slow with 10.5 drill mud.
0789655912 2010-12-20 Drill / Deepen / Reopen No Violations Drilling at 6305 on 10.3#fluid should drill to total depth later on in week.
0895243221 2010-12-21 Drill / Deepen / Reopen No Violations Drilling on 10.4# drilling fluid encountered 3200 unit show in top of Trenton lime,they were 6630 at the time of my inspection.
1185159514 2010-11-29 Drill / Deepen / Reopen No Violations Stopped by drilling rig for update they were drilling 8.750 hole and were building angle with downhole motor estimated total depth on 8 hole should be@3500 then 7 casing will be run through Oriskany sand and cemented back to surface.
1288297521 2010-10-28 Drill / Deepen / Reopen No Violations Went by future drill site to check with site builder on when they want to start construction on drilling pit he stated he would check with company rep on too when drill rig was scheduled to arrive on site.
1289948968 2010-11-15 Drill / Deepen / Reopen No Violations Union Drlling rig#37 moving in on site preparing to drill new well.
1291325744 2010-12-02 Drill / Deepen / Reopen No Violations Stopped by drill rig for update on upcoming 7 job they were down for repair work being preformed on mud pump. Depth 3376 expect to set 3550 of 7 casing.
1291458177 2010-12-03 Drill / Deepen / Reopen No Violations Stopped by drill rig for update on upcoming 7 job they were down for repair work being preformed on mud pump. Depth 3376 expect to set 3550 of 7 casing.

Note: Stone trucks are hauling stone to cover entire location and mechanic on site repairing mud pump, consultant hopes to be back drilling later today.

1291915917 2010-12-09 Drill / Deepen / Reopen No Violations Well has been transferred to Ohio Buckeye Energy LLC-Chesapeake informed drilling consultant to resume drilling operations will check back on rig at later date.
1292268261 2010-12-13 Drill / Deepen / Reopen No Violations Stopped by drill rig for update they were drilling ahead@5390 soaping they blew high pressure air line while I was at site they pulled bit off bottom and repaired line will check on them at later date.
1457002976 2010-12-15 Drill / Deepen / Reopen No Violations Stopped by drill rig for update they were at fluid point@5815 they expect to reach total depth possibly by 12/17/10.
1681932324 2010-12-23 Drill / Deepen / Reopen No Violations Stopped by drill site to check on progress they were drilling on fluid@6980 driller stated they anticipate on reaching total depth late 12/24/10 and will possibly be ready to run casing and cement it in place 12/26/10.
1752538637 2011-06-23 Preliminary Restoration No Violations Restoration work at site satisfactory pit has been filled and site reclaimed and well is equipped with pumping unit and tubing and rods and 2-100 bbl tanks with dike in place.
1851931213 2017-10-05 Production Wells No Violations On the day of my inspection I witnessed the production equipment included a horizontal separator, a drip, a 2 inch salesmeter with a 1 inch orifice and a chart recorder. Also present a 100 barrel tank and a 175 barrel tank within an earthen dike. The well was equipped with 4.5 inch diameter casing; 2.375 inch diameter tubing and a plunger lift system with valves in the open position. Identification was present and production records were current.
1891664488 2010-11-24 Drill / Deepen / Reopen No Violations On site to witness testing of BOP and choke system, we tested pipe rams @1000# for 15 minutes with no decline in pressure and then we tested blind rams@1000# for 15 minutes with no decline and then we proceeded to test annular and we tested it@500# with no decline and also tested choke manifold@500# with no decline in pressures
1949759458 2016-10-19 Production Wells No Violations On the day of my inspection I witnessed the production equipment included a horizontal separator, a drip, a 2 inch salesmeter with a 1 inch orifice and a chart recorder. Also present a 100 barrel tank and a 175 barrel tank within an earthen dike. The well was equipped with 4.5 inch casing; 2.375 inch tubing and a plunger lift system with valves in the open position. Identification was present and production records were current.
1975187087 2011-01-27 Completion Testing No Violations Crew on site closing pits and starting reclaiming project.

Well is equipped with 4.5 casing and 2.375 tubing and contractor has not gotten tank pad completed yet.

786088744 2010-12-16 0:00 DD No Violations
895243221 2010-12-21 0:00 DD No Violations

For data sources see[9]

References