If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-24193 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.15,"lon":-81.63,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wheeling Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: RHDK INVESTMENTS EV | |
License Status: Final Restoration | |
License Date: 2011-09-28 | |
Spud Date: 2012-01-13 | |
Spud Drilling Contractor: BOWMAN DRILLING | |
Final Drill Date: 2012-01-13 | |
Well Total Depth: 2811.00 ft | |
Configuration: Vertical | |
Latitude: 40.150000 | |
Longitude: -81.630000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-09-26 | Proposed Formations:BEREA THRU TOP OF ONONDAGA, Issued Date:9/26/2011, Expired Date:9/25/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:ESPW |
APP | 2011-09-28 | Proposed Formations:BEREA THRU OHIO SHALE, CLINTON, Issued Date:9/28/2011, Expired Date:9/27/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Correction to Well | 2011-10-28 | CHANGE IN PROPOSED TOTAL DEPTH, PROPOSED GEOLOGICAL FORMATION & CASING PROGRAM. |
Reached Total Depth | 2012-01-13 | |
Plugged/Abandoned | 2012-03-29 | |
Completion Report Received | 2012-05-17 | |
Construction Permit Expires | 2013-09-27 | |
Record Last Modified | 2014-10-08 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-49160842 | 2012-1-18 0:00: | DD | No Violations | |
-757041975 | 2013-6-27 0:00: | FR | No Violations | 1.00 |
0049160842 | 2012-01-18 | Drill / Deepen / Reopen | No Violations | Total depth has been reached at 2805. The operator loaded hole with brine while waiting on the logging truck. |
0757041975 | 2013-06-27 | Final Restoration | No Violations | Everything passed according to 1509.072B. |
1333033708 | 2012-03-29 | Plug / Plug Back | No Violations | On day of inspection well was being plugged by Chipco and cemented by Formation cementing.1st plug set @2770-2520ran 39 sks in6.25 open hole. Thru 1.5tubing.2nd plug set@1092-916.Ran 28 sks cement at 6.4 lb/gal.3rd plug set @694-494.Ran 32 sks at 6.4 lb/gal.4th plug set@200-0.Ran 42 sks cement. All cement was 2%gel .Cotton hulls were lost circulating material. Total of 141 sks . |
For data sources see[3]