X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-23386

Well Details

Well ID: 34-133-23386
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Hiram Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID:
Farm/Lease Name: SANGUEDOLCE UNIT
License Status: Producing
License Date: 1985-06-17
Spud Date: 1985-07-12
Spud Drilling Contractor: PEP DRLG
Final Drill Date: 1985-07-19
Well Total Depth: 4330.00 ft
Configuration: Vertical
Latitude: 41.280000
Longitude: -81.180000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1985-06-17 9 EDC GeoDate 6/17/85
Oil and Gas 1985-06-17 Issued Date 6/17/85 Expired Date 6/17/86 Acres 0042150 Tool Type RTF Proposed Formation CLINTON Proposed Depth 04330 Proposed Drill Depth 04330
Original Spud 1985-07-12
Completed 1985-07-19
Reached Total Depth 1985-07-19
Completion Report Received 1985-10-25
Construction Permit Expires 1986-06-17
Change of Owner 2008-07-21 Operator changed from 9, POWER GAS MARKETING & TRANS to 1388, EXCO - NORTH COAST ENERGY INC
Change of Owner 2009-12-14 Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4164 4272 0
4164 4272 0
2006-09-11 4195 4245 1
4195 4245 1
4164 4272 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
GEL 0 96000 Gal 1000 FRAC;H2O,SAND,N2
N2 0 170 Mscf 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 POWER GAS MARKETING & TRANS 1158.00 280.00 365
1986 POWER GAS MARKETING & TRANS 4791.00 833.00 365
1987 POWER GAS MARKETING & TRANS 3215.00 545.00 365
1988 POWER GAS MARKETING & TRANS 2164.00 443.00 365
1989 POWER GAS MARKETING & TRANS 2309.00 358.00 365
1990 POWER GAS MARKETING & TRANS 2160.00 287.00 365
1991 POWER GAS MARKETING & TRANS 1906.00 380.00 365
1992 POWER GAS MARKETING & TRANS 1796.00 291.00 365
1993 POWER GAS MARKETING & TRANS 2339.00 277.00 365
1994 POWER GAS MARKETING & TRANS 2144.00 180.00 0
1995 POWER GAS MARKETING & TRANS 1285.00 197.00 0
1996 POWER GAS MARKETING & TRANS 984.00 280.00 0
1997 POWER GAS MARKETING & TRANS 998.00 243.00 365
1998 POWER GAS MARKETING & TRANS 937.00 178.00 365
1999 POWER GAS MARKETING & TRANS 800.00 201.00 365
2000 POWER GAS MARKETING & TRANS 938.00 196.00 322
2001 POWER GAS MARKETING & TRANS 1046.00 71.00 301
2002 POWER GAS MARKETING & TRANS 891.00 290.00 365
2003 POWER GAS MARKETING & TRANS 589.00 136.00 365
2004 POWER GAS MARKETING & TRANS 978.00 134.00 365
2005 POWER GAS MARKETING & TRANS 1292.00 201.00 365
2006 EXCO - NORTH COAST ENERGY INC 708.00 125.00 365
2007 EXCO - NORTH COAST ENERGY INC 468.00 166.00 365
2008 EXCO - NORTH COAST ENERGY INC 1410.00 111.00 366
2009 EXCO - NORTH COAST ENERGY INC 1954.00 180.00 365
2010 ENERVEST OPERATING LLC 2803.00 134.00 365
2011 ENERVEST OPERATING LLC 2012.00 113.00 0
2012 ENERVEST OPERATING LLC 997.00 156.00 366
2013 ENERVEST OPERATING LLC 799.00 102.00 365
2014 ENERVEST OPERATING LLC 1150.00 110.00 365
2015 ENERVEST OPERATING LLC 1065.00 161.00 365
2016 ENERVEST OPERATING LLC 983.00 93.00 366
2017 ENERVEST OPERATING LLC 1071.00 132.00 365
2018 ENERVEST OPERATING LLC 1021.00 152.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 POWER GAS MARKETING & TRANS Brine 450 365
1986 POWER GAS MARKETING & TRANS Brine 755 365
1987 POWER GAS MARKETING & TRANS Brine 628 365
1988 POWER GAS MARKETING & TRANS Brine 628 365
1989 POWER GAS MARKETING & TRANS Brine 349 365
1990 POWER GAS MARKETING & TRANS Brine 370 365
1991 POWER GAS MARKETING & TRANS Brine 358 365
1992 POWER GAS MARKETING & TRANS Brine 327 365
1993 POWER GAS MARKETING & TRANS Brine 308 365
1994 POWER GAS MARKETING & TRANS Brine 279 0
1995 POWER GAS MARKETING & TRANS Brine 344 0
1996 POWER GAS MARKETING & TRANS Brine 241 0
1997 POWER GAS MARKETING & TRANS Brine 204 365
1998 POWER GAS MARKETING & TRANS Brine 135 365
1999 POWER GAS MARKETING & TRANS Brine 254 365
2000 POWER GAS MARKETING & TRANS Brine 274 322
2001 POWER GAS MARKETING & TRANS Brine 290 301
2002 POWER GAS MARKETING & TRANS Brine 170 365
2003 POWER GAS MARKETING & TRANS Brine 110 365
2004 POWER GAS MARKETING & TRANS Brine 208 365
2005 POWER GAS MARKETING & TRANS Brine 164 365
2006 EXCO - NORTH COAST ENERGY INC Brine 221 365
2007 EXCO - NORTH COAST ENERGY INC Brine 190 365
2008 EXCO - NORTH COAST ENERGY INC Brine 150 366
2009 ENERVEST OPERATING LLC Brine 0 92
2010 ENERVEST OPERATING LLC Brine 146 365
2011 ENERVEST OPERATING LLC Brine 191
2012 ENERVEST OPERATING LLC Brine 196 366
2013 ENERVEST OPERATING LLC Brine 214 365
2014 ENERVEST OPERATING LLC Brine 115 365
2015 ENERVEST OPERATING LLC Brine 47 365
2016 ENERVEST OPERATING LLC Brine 0 366
2017 ENERVEST OPERATING LLC Brine 0 365
2018 ENERVEST OPERATING LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL5993 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
1755457484 2007-03-26 Production Wells No Violations On 3/23, I received a call from Reggie Brown with OEPA reporting an anonymous gas leak complaint near the southwest corner of the intersection between Limeridge and Schubtrich Roads in Hiram Township. From his description, it appeared likely that the leak is from a North Coast sales line, which runs north and south along the west side of Limeridge Road. The nearest producing well is the Sanguedolce, which is located north of Schubtrich Road. Andy Koval (330-509-9565) with North Coast was notified and sent a crew to uncover and repair the line. On 3/24, the job was completed. On 3/26, I inspected the site and found that the affected area had been filled in and graded. Additional reclamation will be necessary as the weather permits.
PL5993 PL No Violations

For data sources see[9]

References