34-133-24451

Well Details

Well ID: 34-133-24451
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Palmyra Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID:
Farm/Lease Name: RUGGLES
License Status: Final Restoration
License Date: 2013-04-04
Spud Date: 2013-07-20
Spud Drilling Contractor: PEP DRLG
Final Drill Date: 2013-08-05
Well Total Depth: 7597.00 ft
Configuration: Vertical
Latitude: 41.080000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-04 Proposed Formations:BLACK RIVER THROUGH TREMPEALEAU, Issued Date:4/4/2013, Expired Date:4/4/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EW
Correction to Well 2013-04-26 CORRECTION TO CASING PROGRAM
Reached Total Depth 2013-08-05 D & A 10/18/13
Plugged/Abandoned 2013-10-21 D & A 10/18/13
Completion Report Received 2013-11-15 D & A 10/18/13
Construction Permit Expires 2015-04-04 D & A 10/18/13
Record Last Modified 2017-02-10 D & A 10/18/13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-11-20 7382 7422 88
7382 7422 88
7382 7422 88

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-08-12 H2O 0 39294 Gal 30100 Universal Well Services Inc. Universal Well Services rigged up their iron to the frac valve on the 4.5" casing. The valve is rated at 5000psi. The annulus between the surface and production casing is open. Universal closed the gate valve and pressure tested the iron to 5218psi with no leaks. The gate valve was opened and Universal broke the formation at 2464psi, waited 5 minutes, and displaced the acid with 500 barrels of water. They pumped their pad and started on sand in a crosslink gel. They put away 301 sacks (30,

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 ENERVEST OPERATING LLC 155.00 30.00 23

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 ENERVEST OPERATING LLC Brine 0 23

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1282655241 2013-8-12 0:00: CT No Violations
-1316183942 2013-8-19 0:00: CT No Violations
-139690941 2013-7-21 0:00: CS No Violations
-1434778977 2013-7-25 0:00: DD No Violations
-1503642199 2013-7-1 0:00:0 DD No Violations 0.50
-1785788458 2013-10-1 0:00: CT No Violations
-2028992704 2013-7-30 0:00: DD No Violations
-2101999160 2013-7-23 0:00: CS No Violations
-250425125 2014-7-22 0:00: FR No Violations 1.00
-481350770 2013-8-8 0:00:0 DD No Violations
-558364997 2013-10-18 0:00 PB No Violations
-81977291 2013-7-17 0:00: DD No Violations
-896765914 2013-8-2 0:00:0 DD No Violations
0072385883 2013-10-22 Plug / Plug Back No Violations I was on location to check the plug from previous day. The surface plug had dropped four feet, was solid, and there was no sign of gas channeling. Chipco was rigging down and Jhawk was removing water from the lined pit. The top of the surface casing was cut below grade and the ID plate was tacked on top of the casing. This well has been properly plugged and abandoned. No violations.
0081977291 2013-07-17 Drill / Deepen / Reopen No Violations I stopped by the location to check on site construction. The location has been leveled and several frac tanks have been spotted for water. The rig will start moving in tomorrow. No violations.
0132685752 2013-09-05 Completion Testing No Violations I was on location to check the status of this well following completion. Woody McDaniel was on location with a swabbing rig and preparing to rig up to the hole and swab the well to a steel tank. The 2 line was secure to the tank and all water is being contained. No violations.
0139690941 2013-07-21 Casing String Witnessed No Violations I was in location to witness the cementing of the 11.75 surface casing. PEP Drilling Rig #10 drilled a 17.5 hole to a depth of 100, tripped out of the hole, changed bits, and drilled a 14.75 hole from 100 to a depth of 344. They ran 7 joints of 11.75 casing and were unable to get the eighth joint past an obstruction in the bottom of the hole. The permit called for 306 (GL) (314 KB) of casing, 50 below the Big Injun. Leaving the eighth joint out put the casing at 295 (GL) (303 KB) and I allowed Enervest to continue with cementing operations with the casing set at this depth. PEP circulated on the hole for an hour until the cementers arrived. Universal Well Services rigged up, began circulating the hole, and mixed and pumped 53 barrels of Type I cement. The cement was displaced to a depth of 280 with 35 barrels of freshwater and the cement head was shut-in. 10-12 barrels of good cement returned to surface. No violations.
0250425125 2014-07-22 Final Restoration No Violations I was on location to inspect the Final Restoration status of this well site. The well was completed in the Rose Run Sandstone on 8/6/2013. After negative completion testing results, I approved plugging off of the drilling permit and the well was properly plugged and abandoned from 10/17/13-10/21/13. Preliminary Restoration was never necessary and all equipment used in completion testing was temporary and has been removed. No flow lines were ever buried and the lease road has been removed back to the Ruggles #2 Clinton well (PN#22148). The well was located in the middle of a bean/corn field and has been properly graded. No seeding is required as it will be replanted next year. Final Restoration is approved.
0272802925 2015-04-29 Final Restoration No Violations Status check of final restoration on this Rose Run well location. The well was completed on 8/6/2013 and stimulated on 8/12/2013. Flow back and production testing occurred for two (2) months and it was determined that the well was not economically viable. The well was plugged and abandoned between 10/17/2013 and 10/21/2013. No tanks or production equipment were ever permanently installed on this location. My inspection today found the location has been completely restored to an agricultural field and erosion controls have been removed. There is no equipment on location and a good seedbed has taken root in the field. The access road has been removed and pulled back to the lease road for the Ruggles #2 (PN# 22148). No landowner waiver (Form 5) is required for this location. Final Restoration is approved. No violations.
0481350770 2013-08-08 Drill / Deepen / Reopen No Violations I was on location to check the status of the site following drilling completion. PEP Rig #10 was moving off location. The pits were lined and in good condition. Henderson Road was being swept during the move out. No violations.
0558364997 2013-10-18 Plug / Plug Back No Violations I was on location to witness the plugging of this Rose Run well. Chipco found free pipe at a depth of 6340 and ripped the collar. One joint of 4.5 casing was pulled to 6298 to spot a 300 plug across the top of the Utica Shale (top of the Utica~6201). Petroset rigged up, began circulating the hole, and mixed and pumped 75 sacks of Class A cement with 2% gel. The cement was displaced with 93 barrels of water. Chipco pulled 36 joints of 11.6 lb/ft casing to a depth of 4786 to set a plug across the Clinton Sandstone (4625-4736). Petroset rigged up, broke circulation, then mixed and pumped 75 sacks of cement. The slurry was displaced with 69 barrels of water and the plug was set from 4786-4475. Petrset rigged down and left location. Chipco is going to pull 42 joints to 3022 and the remaining plugs will be set on 10/21/13. No violations.
0896765914 2013-08-02 Drill / Deepen / Reopen No Violations I was on location to check the drilling status of PEP Rig #10 at this Rose Run well. I met with Bob Randall (consultant) and Jeff Foley (Enervest) to discuss drilling. Drilling had slowed dramatically during the previous day and Enervest made the decision to make a bit trip. The blow pit and liner were in good condition and the blow line was secured properly. No violations.
1282655241 2013-08-12 Completion Testing No Violations I was on location with Woody McDaniel, Jeff Foley, and Universal Well Services to witness completion operations for this Rose Run well. Universal Well Services rigged up their iron to the frac valve on the 4.5 casing. The valve is rated at 5000psi. Universal closed the gate valve and pressure tested the iron to 5218psi with no leaks. The annulus between the surface and production casing was opened prior to stimulation. The job was completed as designed and there were pressure deviations observed throughout the job. See stimulation report for details on this job. No violations.
1316183942 2013-08-19 Completion Testing No Violations I was on site to check the status of the location following completion. The pits have been solidified and closed and the site was being reclaimed. Kyle Ahbel (Enervest) was on location overseeing flow back operations. Fluids were being produced to a steel tank through a 2 steel line. The line was chained to the tank and all fluids were contained. No violations.
132685752 2013-9-5 0:00:0 CT No Violations
1375811805 2013-08-06 Drill / Deepen / Reopen No Violations I was on location today for the cementing of the production casing. The drilling contractor was PEP Drilling and they drilled a 7 7/8 hole to 7601. The casing used was 4.5 and was 11.6 lb casing and was set at 7576. Universal broke circulation and ran 150 BBLs of Class A cement. The plug landed and was held at 1200 psi for 5 minutes. The permit was in the dog house. Fire extinguishers were available in case of an emergency. No violations.
1378318696 2013-07-23 Drill / Deepen / Reopen No Violations I was on location at 10:30pm to verify casing integrity and test the blow out preventor (BOP) prior to drilling the cement plug. PEP Rig #10 placed 320lbs on the casing and I monitored the Pason gauge and inspected the BOP stack for 30 minutes. After thirty minutes, the gauge registered a drop of 5% and is within the maximum of 10% leak off. The BOP showed no signs of leaking during the test. Casing integrity has been verified and operations may continue. No violations
1385044641 2013-10-17 Plug / Plug Back No Violations I was on location to witness the setting of the bottom plug on this Rose Run well. This well was completed on 8/12/13, and, after testing the well, the company determined that the well was not commercially viable and they will plug the well off of the drilling permit. Enervest, Chipco, and Petroset were on location to conduct plugging operations. 2.375 tubing in the well was set at 7350 and I had Enervest run 3 more joints in the hole to 7440 to get below the bottom perforation at 7422. Petroset rigged up to the tubing, mixed and pumped 35 sacks cement, and displaced the slurry with 27.5 barrels of water at 1200psi. Water was circulated into a steel tank during the job. The plug was down at 11:59am and Chipco began tripping the tubing out of the hole. The 4.5 casing will be ripped in the morning and plugging operations will continue. No violations.
1385053442 2013-10-21 Plug / Plug Back No Violations I was on location to witness the setting of the final 3 plugs in this Rose Run well. Omega Cementing was on location, rigged up to the casing, established circulation, and mixed and pumped 75 sacks of cement slurry. The slurry was displaced with 43.4 barrels of water. Chipco pulled 45 joints to a depth of 1132 and omega set a 51 sack plug at the bottom of the surface casing. Chipco pulled 22 more joints and Omega set a 55 sack plug that circulated to surface. Chipco pulled the remaining 5 joints and Omega topped off the hole. The top plug held at the surface and the casing will be cut off below grade tomorrow and fitted with an ID plate. 151 joints of 11.6 lb/ft, 4.5 casing was recovered during the job. No violations.
1434778977 2013-07-25 Drill / Deepen / Reopen No Violations I was on location to check the drilling status of PEP Rig #10. They were currently drilling ahead on air and soaping at a depth of 2777. The top of the Onondaga (Big Lime) was encountered at 2734. The rig was drilling 60/hour. The conductor and surface hole working pits were lined and had been pumped down. The blow pit was lined and in good condition. The steel blow line was staked and properly chained down. No violations.
1472282944 2013-07-08 Drill / Deepen / Reopen No Violations I was on location to inspect site construction for this Rose Run well. The contractor was on location and stockpiling the topsoil to the south and east of the well location. No violations.
1503642199 2013-07-01 Drill / Deepen / Reopen No Violations I was on location to check on site construction. The apron for the lease road has been constructed and stoned with durable material. The road is only partially constructed to the well location. No violations.
1572727239 2013-07-19 Completion Testing No Violations I was on location to check the rig up of PEP #10. PEP was currently drilling the mouse hole below the derrick floor. The pits were lined and in good condition. No violations.
1633257309 2013-10-09 Completion Testing No Violations I was on location to check the status of this Rose Run well. The pumping unit was running and the well was being tested through a horizontal separator. Gas was being routed into a sales line and the liquids were flowing through a 2 steel line into a 500 barrel frac tank. The flow line was chained securely to the frac tank and the tank was half full. No violations.
1696789364 2014-03-11 Preliminary Restoration No Violations On location to check the final restoration status of this recently drilled and abandoned Rose Run Well. The site has been graded to the original contour and equipment has been removed. Preliminary restoration is approved. Final restoration is pending removal of the silt fence on the north side of location. No violations.
1785788458 2013-10-01 Completion Testing No Violations I was on location to check the status of completion testing. The gauge on the casing read 425psi and the gauge on the tubing was at 300psi. The annulus between the 8.625 casing and the 4.5 casing was open and equipped with a gauge that read 0psi. The flow line was chained to the 500 barrel frac tank and the tank was half full. No violations.
1872840280 2013-09-16 Completion Testing No Violations I was on location to check the status of the testing of this well. Enervest was on location spotting the pumping unit over the well. Their plan is to connect the well to a separator and produce the gas to a sales line on the location and produce the fluids to a 500 barrel steel tank in order to determine if the well is commercially viable. Rods still need to be run into the tubing and should be done by the end of the week. No violations.
2028992704 2013-07-30 Drill / Deepen / Reopen No Violations I was on location to check the drilling status of PEP Rig #1. The rig is currently drilling ahead on soap and air at a depth of 5430. The blow pit and liner are in good condition and the blow line is properly secured. No violations.
2081289992 2013-11-06 Final Restoration No Violations I was on location to check the status of the site following plugging operations. Final restoration is due by 4/24/2014. The stockpiled topsoil has been spread and graded. The lease road has been pulled back to the Ruggles #2 (PN# 22148) and the stone is stockpiled to the north. The pumping unit used for testing the well is next to the stone pile. Silt fence is still in place along the north side of the location. No violations.
2101999160 2013-07-23 Casing String Witnessed No Violations I was on location to witness the cementing of the 8.625 casing. PEP drilled an 11 hole to a depth of 1045 and ran 23 joints of 8.625 casing to a depth of 1025 with a 10 landing joint. Universal rigged up, established circulation, and pumped 15 barrels of gel and 5 barrels of water spacer ahead of the slurry. They then mixed and pumped 79 barrels of Type I cement slurry, dropped the wiper plug, and displaced the plug and cement to 1003 with 64 barrels of freshwater. 25 barrels of good cement returned and held at the surface. No violations.
272802925 2015-4-29 0:00: FR No Violations 0.50
72385883 2013-10-22 0:00 PB No Violations