37-005-31230

Well Details

Well ID: 37-005-31230
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 151874
Farm/Lease Name: AMBROSE
License Status:
Spud Date: 2015-03-12
Permit Date: 2015-02-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.860614
Longitude: -79.539294

For data sources see[1][2][3]

Well History

Date Event
2015-02-23 New Permit Application
2015-03-12 Drilling Completion
2015-03-12 Performed Spud Operation
2015-04-29 Drilling Completion
2015-07-04 Drilling Completion
2015-08-17 Perforation
2016-06-03 Deviated
2016-06-03 DRILLED DEEPER
2016-06-03 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-10 2015-09-29 6,473 16,955,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BIOCLEAR 2000 Weatherford Biocide 2, 2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.00290434 4610.73
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00300454 4769.8
AI 600P Weatherford Acid Inhibitor Cinnamaldehyde 104-55-2 15 0.000231435 367.41
Dimethylformamide 68-12-2 20 0.00030858 489.88
1-Decanol 112-30-1 5 0.00007714 122.47
Nonyl Phenol Ethoxylate, Branched 127087-87-0 15 0.000231435 367.41
Pyridine, alkyl derives., quaternized with benzyl chloride 68909-18-2 15 0.000231435 367.41
1-Octanol 111-87-5 5 0.00007714 122.47
Alkyl Pyridine 68391-11-7 1 0.00001543 24.494
Ethylene Glycol 107-21-1 40 0.000617159 979.76
Methanol 67-56-1 2.5 0.00003857 61.235
Triethyl Phosphate 78-40-0 2.5 0.00003857 61.235
2-Butoxyethanol 111-76-2 5 0.00007714 122.47
Sand (Proppant) Keane Proppant Crystalline Silica, Quartz 14808-60-7 100 10.1312 16,083,600.0
LEB 10X Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00000593 9.407
EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.000608697 966.326
PGS-214 Rockwater Guar Slurry PGS-214 Proprietary 100 0.000138364 219.657
Water Snyder Brothers Inc Carrier/Base Fluid Water 7732-18-5 100 89.1264 141,491,000.0
Hydrochloric Acid (15%) FSTI Acid HCL 7647-01-0 15 0.0946699 150292
FFR 730 Nalco Friction Reducer Oxyalkylated alcohol A Proprietary 5 0.00378222 6004.4
SCALE CLEAR 125W Weatherford Scale Inhibitor Phosphonomethylated polyamine,
cmpd. with substituted amine Proprietary 5 - 15
Proprietary 15 0.00110407 1752.74
Ammonium Chloride 12125-02-9 2.5 0.000184011 292.124
Ethylene Glycol 107-21-1 60 0.00441627 7010.97

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SNYDER BROS INC 186,785.00 29 0.00 0 0.00 0
2016 SNYDER BROS INC 1,154,983.00 366 0.00 0 0.00 0
2017 SNYDER BROS INC 1,284,056.00 365 0.00 0 0.00 0
2018 SNYDER BROS INC 1,013,519.00 365 0.00 0 0.00 0
2019 SNYDER BROS INC 540,541.00 271 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SNYDER BROS INC Fracturing Fluid Waste 56.45 Tons LANDFILL 100585
2015 SNYDER BROS INC Produced Fluid 945.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Drill Cuttings 709.95 Tons LANDFILL SWF 1025
2015 SNYDER BROS INC Drill Cuttings 367.52 Tons LANDFILL 100585
2015 SNYDER BROS INC Fracing Fluid Waste 12,675.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 SNYDER BROS INC Produced Fluid 110.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2015 SNYDER BROS INC Fracing Fluid Waste 12,675.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Produced Fluid 3,383.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Fracing Fluid Waste 1,555.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Produced Fluid 3,383.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 5,155.66 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 1,136.90 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 SNYDER BROS INC Produced Fluid 1,587.30 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 SNYDER BROS INC Produced Fluid 217.80 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2016 SNYDER BROS INC Produced Fluid 1,488.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SNYDER BROS INC Produced Fluid 2,958.31 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 SNYDER BROS INC Produced Fluid 2,644.90 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 SNYDER BROS INC Produced Fluid 12,465.52 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SNYDER BROS INC Produced Fluid 5,155.66 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 SNYDER BROS INC Produced Fluid 89.90 Bbl INJECTION DISPOSAL WELL 34-155-24063
2017 SNYDER BROS INC 8,609.18 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 5,982.43 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC 4,048.28 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Produced Fluid 1,179.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 10,912.99 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 1,151.00 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 14,423.10 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 264.20 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid 5,155.80 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 1,191.60 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2352699 Primary Facility 2015-03-16 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed,the impoundment was properly lined and it contained snow and snow melt. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2354586 Primary Facility 2015-03-19 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2366667 Primary Facility 2015-04-24 Drilling/Alteration No Violations Noted First Class Energy rig#1 Schramm TXD 200 Trailer Mounted drilling at 557’ at time of inspection. Closed loop system being utilized.
2366833 Primary Facility 2015-04-29 Drilling/Alteration No Violations Noted First Class Energy rig#1 Schramm TXD 200 Trailer Mounted drilling at 5700’ at time of inspection. Closed loop system being utilized. Department site visit w/WQS S. Foulk and C. Witham.
2368648 Primary Facility 2015-05-11 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2377861 Primary Facility 2015-06-09 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2382200 Primary Facility 2015-06-22 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2390256 Primary Facility 2015-07-16 Routine/Complete Inspection No Violations Noted Drill rig located onsite, drilling was ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2441963 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2442052 Primary Facility 2016-01-19 Routine/Complete Inspection No Violations Noted 6 wells drilled and equipped for production. 4 tanks onsite. ID sign and e&s ok.
2443548 Primary Facility 2016-01-26 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production units-equipment-tank battery-dike look ok.
2480495 Primary Facility 2016-05-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2538007 Primary Facility 2016-11-18 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2583510 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted Well tagged-in production-annulus open. Well head casing-production set equipment-tank battery-dike containment look ok.
2589369 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2674090 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted At time of inspection, well 5H drilled and appears equipped for production. Wells 2H, 1H, 3H, 4H, 6H also drilled and appear equipped for production.
2683777 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 5H drilled and appears equipped for production. Wells 1H, 2H, 3H, 4H, 6H also drilled and appear equipped for production.
2709945 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2771436 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks located on site. An additional brine tank located on eastern side of well pad site located in secondary containment.
2798054 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok.
2821109 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2847434 Primary Facility 2019-02-26 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks. The cellar was filled with water. No bubbles were seen. Tubing pressure was reading at around 401 psi and the casing pressure was 662 psi. There was a separator at the well. Also onsite were 3 dual line heaters and within a lined steel dike were 4 tanks. Pad was being used to store equipment and temporary work areas were set up. One had welding activity occurring. A compressor station was near the well pad.

For data sources see[8]

References