X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31231

Well Details

Well ID: 37-005-31231
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 151874
Farm/Lease Name: AMBROSE
License Status: Active
Spud Date: 2015-03-13
Permit Date: 2015-02-23
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.860544
Longitude: -79.539406

For data sources see[1][2][3]

Well History

Date Event
2015-02-23 New Permit Application
2015-03-13 Drilling Completion
2015-03-13 Performed Spud Operation
2015-05-08 Drilling Completion
2015-06-23 Drilling Completion
2015-08-17 Perforation
2015-09-10 Perforation
2015-09-11 Perforation
2015-09-11 Performed Stage 1 of Stimulation
2015-09-11 Performed Stage 2 of Stimulation
2015-09-11 Performed Stimulation
2015-09-12 Perforation
2015-09-12 Performed Stage 3 of Stimulation
2015-09-12 Performed Stage 4 of Stimulation
2015-09-13 Perforation
2015-09-13 Performed Stage 5 of Stimulation
2015-09-13 Performed Stage 6 of Stimulation
2015-09-13 Performed Stage 7 of Stimulation
2015-09-14 Perforation
2015-09-14 Performed Stage 8 of Stimulation
2015-09-15 Perforation
2015-09-15 Performed Stage 10 of Stimulation
2015-09-15 Performed Stage 9 of Stimulation
2015-09-16 Perforation
2015-09-16 Performed Stage 11 of Stimulation
2015-09-16 Performed Stage 12 of Stimulation
2015-09-16 Performed Stage 13 of Stimulation
2015-09-17 Perforation
2015-09-17 Performed Stage 14 of Stimulation
2015-09-17 Performed Stage 15 of Stimulation
2015-09-18 Perforation
2015-09-18 Performed Stage 18 of Stimulation
2015-09-18 Performed Stage 19 of Stimulation
2015-09-18 Performed Stage 20 of Stimulation
2015-09-19 Perforation
2015-09-19 Performed Stage 21 of Stimulation
2015-09-19 Performed Stage 22 of Stimulation
2015-09-20 Perforation
2015-09-20 Performed Stage 23 of Stimulation
2015-09-20 Performed Stage 24 of Stimulation
2015-09-20 Performed Stage 25 of Stimulation
2015-09-21 Perforation
2015-09-21 Performed Stage 26 of Stimulation
2015-09-21 Performed Stage 27 of Stimulation
2015-09-21 Performed Stage 28 of Stimulation
2015-09-22 Perforation
2015-09-22 Performed Stage 29 of Stimulation
2015-09-22 Performed Stage 30 of Stimulation
2015-09-22 Performed Stage 31 of Stimulation
2015-09-23 Perforation
2015-09-23 Performed Stage 32 of Stimulation
2015-09-23 Performed Stage 33 of Stimulation
2015-09-23 Performed Stage 34 of Stimulation
2015-09-24 Perforation
2015-09-24 Performed Stage 35 of Stimulation
2015-09-24 Performed Stage 36 of Stimulation
2015-09-24 Performed Stage 37 of Stimulation
2015-09-25 Perforation
2015-09-25 Performed Stage 38 of Stimulation
2015-09-25 Performed Stage 39 of Stimulation
2015-09-25 Performed Stage 40 of Stimulation
2015-09-25 Performed Stage 41 of Stimulation
2015-09-26 Perforation
2015-09-26 Performed Stage 42 of Stimulation
2015-09-26 Performed Stage 43 of Stimulation
2015-09-26 Performed Stage 44 of Stimulation
2015-09-27 Perforation
2015-09-27 Performed Stage 45 of Stimulation
2015-09-27 Performed Stage 46 of Stimulation
2015-09-27 Performed Stage 47 of Stimulation
2015-09-27 Performed Stage 48 of Stimulation
2015-09-28 Perforation
2015-09-28 Performed Stage 49 of Stimulation
2015-09-28 Performed Stage 50 of Stimulation
2015-09-28 Performed Stage 51 of Stimulation
2015-09-28 Performed Stage 52 of Stimulation
2015-09-28 Performed Stage 53 of Stimulation
2015-09-29 Perforation
2015-09-29 Performed Stage 54 of Stimulation
2015-09-29 Performed Stage 55 of Stimulation
2016-06-03 Drilled Deeper
2016-06-03 Newly Drilled
2017-06-03 Deviated

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-10 2015-09-29 6,475 16,472,900 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6486A Nalco Scale Inhibitor Ethylene Glycol 107-21-1 30 0.000617717 954.209
SCALE CLEAR 125W Weatherford Scale Inhibitor Phosphonomethylated polyamine,
cmpd. with substituted amine Proprietary 5 - 15
Proprietary 15 0.00110669 1709.54
Ammonium Chloride 12125-02-9 2.5 0.000184448 284.923
Ethylene Glycol 107-21-1 60 0.00442675 6838.15
LEB 10X Clearwater Gel Breaker Ethylene Glycol 107-21-1 60 0.00001807 27.916
Hydrochloric Acid (15%) FSTI Acid HCL 7647-01-0 15 0.09388 145020
EC6673W Nalco Iron Control Ethylene Glycol 107-21-1 30 0.00314659 4860.65
PGS-214 Rockwater Guar Slurry PGS-214 Proprietary 100 0.00008387 129.562
BIOCLEAR 2000 Weatherford Biocide 2, 2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.0029241 4516.96
Water Snyder Brothers Inc Carrier/Base Fluid Water 7732-18-5 100 88.9903 137,466,000.0
AI 600P Weatherford Acid Inhibitor Dimethylformamide 68-12-2 20 0.00030313 468.255
Alkyl Pyridine 68391-11-7 1 0.00001516 23.413
Cinnamaldehyde 104-55-2 15 0.000227347 351.191
1-Decanol 112-30-1 5 0.00007578 117.064
Ethylene Glycol 107-21-1 40 0.000606259 936.509
Methanol 67-56-1 2.5 0.00003789 58.532
Nonyl Phenol Ethoxylate, Branched 127087-87-0 15 0.000227347 351.191
2-Butoxyethanol 111-76-2 5 0.00007578 117.064
Pyridine, alkyl derives., quaternized with benzyl chloride 68909-18-2 15 0.000227347 351.191
Triethyl Phosphate 78-40-0 2.5 0.00003789 58.532
1-Octanol 111-87-5 5 0.00007578 117.064
Sand (Proppant) Keane Proppant Crystalline Silica, Quartz 14808-60-7 100 10.2719 15,867,300.0
ABS-40 Fluids Management Aliphatic Based Non-Aqueous Drilling Fluid iso-paraffins, normal paraffins, and olefins and olefin 64742-46-7 100 0.000555727 858.45
FFR 730 Nalco Friction Reducer Oxyalkylated alcohol A Proprietary 5 0.00375939 5807.26

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2015-09-11 1 Silica Sand 16,472,904 8,503 8,711
2015-09-11 2 Silica Sand 16,472,904 8,184 8,724
2015-09-12 3 Silica Sand 16,472,904 8,021 8,895
2015-09-12 4 Silica Sand 16,472,904 8,047 8,948
2015-09-13 5 Silica Sand 16,472,904 7,794 8,306
2015-09-13 6 Silica Sand 16,472,904 8,273 8,798
2015-09-13 7 Silica Sand 16,472,904 8,269 9,103
2015-09-14 8 Silica Sand 16,472,904 8,268 8,641
2015-09-15 9 Silica Sand 16,472,904 8,328 8,580
2015-09-15 10 Silica Sand 16,472,904 8,317 9,013
2015-09-16 11 Silica Sand 16,472,904 7,966 8,565
2015-09-16 12 Silica Sand 16,472,904 7,998 8,356
2015-09-16 13 Silica Sand 16,472,904 8,228 8,758
2015-09-17 14 Silica Sand 16,472,904 8,427 8,767
2015-09-17 15 Silica Sand 16,472,904 8,237 8,806
16 16,472,904 0 0
17 16,472,904 0 0
2015-09-18 18 Silica Sand 16,472,904 7,546 8,884
2015-09-18 19 Silica Sand 16,472,904 7,782 8,294
2015-09-18 20 Silica Sand 16,472,904 7,553 8,110
2015-09-19 21 Silica Sand 16,472,904 7,613 8,880
2015-09-19 22 Silica Sand 16,472,904 7,577 8,145
2015-09-20 23 Silica Sand 16,472,904 7,716 8,066
2015-09-20 24 Silica Sand 16,472,904 7,694 7,874
2015-09-20 25 Silica Sand 16,472,904 7,684 8,729
2015-09-21 26 Silica Sand 16,472,904 7,578 8,489
2015-09-21 27 Silica Sand 16,472,904 7,550 7,941
2015-09-21 28 Silica Sand 16,472,904 7,776 8,823
2015-09-22 29 Silica Sand 16,472,904 7,794 9,167
2015-09-22 30 Silica Sand 16,472,904 7,521 8,183
2015-09-22 31 Silica Sand 16,472,904 7,739 8,811
2015-09-23 32 Silica Sand 16,472,904 7,639 8,502
2015-09-23 33 Silica Sand 16,472,904 7,727 8,329
2015-09-23 34 Silica Sand 16,472,904 7,334 7,994
2015-09-24 35 Silica Sand 16,472,904 7,305 8,039
2015-09-24 36 Silica Sand 16,472,904 7,098 7,460
2015-09-24 37 Silica Sand 16,472,904 7,500 7,878
2015-09-25 38 Silica Sand 16,472,904 7,157 8,026
2015-09-25 39 Silica Sand 16,472,904 7,294 7,581
2015-09-25 40 Silica Sand 16,472,904 7,366 8,109
2015-09-25 41 Silica Sand 16,472,904 7,013 8,097
2015-09-26 42 Silica Sand 16,472,904 7,656 8,237
2015-09-26 43 Silica Sand 16,472,904 7,203 7,812
2015-09-26 44 Silica Sand 16,472,904 7,081 8,385
2015-09-27 45 Silica Sand 16,472,904 7,161 7,982
2015-09-27 46 Silica Sand 16,472,904 7,252 7,698
2015-09-27 47 Silica Sand 16,472,904 7,383 8,267
2015-09-27 48 Silica Sand 16,472,904 7,525 8,809
2015-09-28 49 Silica Sand 16,472,904 7,008 7,782
2015-09-28 50 Silica Sand 16,472,904 7,020 7,515
2015-09-28 51 Silica Sand 16,472,904 7,283 8,796
2015-09-28 52 Silica Sand 16,472,904 6,810 7,285
2015-09-28 53 Silica Sand 16,472,904 6,845 7,062
2015-09-29 54 Silica Sand 16,472,904 6,784 7,558
2015-09-29 55 Silica Sand 16,472,904 6,528 7,205

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 SNYDER BROS INC 174,747.00 24 0.00 0 0.00 0
2016 SNYDER BROS INC 1,021,968.00 204 0.00 0 0.00 0
2017 SNYDER BROS INC 922,784.00 273 0.00 0 0.00 0
2018 SNYDER BROS INC 1,116,385.00 365 0.00 0 0.00 0
2019 SNYDER BROS INC 633,614.00 302 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2015 SNYDER BROS INC Fracturing Fluid Waste 56.79 Tons LANDFILL 100585
2015 SNYDER BROS INC Produced Fluid 850.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Drilling Fluid Waste 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 SNYDER BROS INC Drill Cuttings 1,139.67 Tons LANDFILL SWF 1025
2015 SNYDER BROS INC Fracing Fluid Waste 110.00 Bbl INJECTION DISPOSAL WELL 34-007-21847
2015 SNYDER BROS INC Fracing Fluid Waste 18,178.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Fracing Fluid Waste 18,178.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2015 SNYDER BROS INC Produced Fluid 2,513.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2015 SNYDER BROS INC Fracing Fluid Waste 7,155.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2015 SNYDER BROS INC Produced Fluid 2,513.00 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 5,126.66 Bbl CENT WASTE TRT FAC NPDES EPA ID: 748-163
2016 SNYDER BROS INC Produced Fluid 710.60 Bbl INJECTION DISPOSAL WELL 34-007-21847
2016 SNYDER BROS INC Produced Fluid 1,582.41 Bbl INJECTION DISPOSAL WELL 34-155-24079
2016 SNYDER BROS INC Produced Fluid 217.80 Bbl INJECTION DISPOSAL WELL 34-007-2-3692
2016 SNYDER BROS INC Produced Fluid 1,488.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 SNYDER BROS INC Produced Fluid 2,949.21 Bbl INJECTION DISPOSAL WELL 34-099-23158
2016 SNYDER BROS INC Produced Fluid 2,636.76 Bbl INJECTION DISPOSAL WELL 34-155-23196
2016 SNYDER BROS INC Produced Fluid 12,452.93 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SNYDER BROS INC Produced Fluid 5,126.66 Bbl CENT WASTE TRT FAC NPDES DISCHARGE EPA ID: 748-163
2017 SNYDER BROS INC 8,582.70 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 89.70 Bbl INJECTION DISPOSAL WELL 34-155-24063
2017 SNYDER BROS INC Produced Fluid 4,842.93 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC 4,035.83 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Produced Fluid 1,175.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 10,002.40 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 1,147.50 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 14,378.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 263.40 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid 5,140.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 1,188.00 Bbl REUSE (AT WELL PAD)

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2352701 Primary Facility 2015-03-16 Routine/Complete Inspection No Violations Noted Drilling had commenced but was not ongoing at the time of the inspection. No other well development activites were ongoing at the time of the inspection. The freshwater impoundment construction had been completed,the impoundment was properly lined and it contained snow and snow melt. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2354589 Primary Facility 2015-03-19 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2366672 Primary Facility 2015-04-24 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2366817 Primary Facility 2015-04-29 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Department site visit w/WQS S. Foulk and C. Witham.
2368651 Primary Facility 2015-05-11 Routine/Complete Inspection No Violations Noted Well was not equipped for production, drilling was not ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2377864 Primary Facility 2015-06-09 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2382203 Primary Facility 2015-06-22 Drilling/Alteration No Violations Noted Precision Drilling rig#228 drilling at 14168’ at time of inspection. Closed loop system being utilized (12.5 lb/gal synthetic oil based mud).
2382252 Primary Facility 2015-06-22 Drilling/Alteration No Violations Noted Precision Drilling rig#228 drilling at 14168’ at time of inspection. Closed loop system being utilized (12.5 lb/gal synthetic oil based mud).
2390259 Primary Facility 2015-07-16 Routine/Complete Inspection No Violations Noted Drill rig located onsite, drilling for Ambrose 5H was ongoing at the time of the inspection. The freshwater impoundment construction had been completed, the impoundment had been lined properly and it contained freshwater. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2441967 Primary Facility 2016-01-20 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2442053 Primary Facility 2016-01-19 Routine/Complete Inspection No Violations Noted 6 wells drilled and equipped for production. 4 tanks onsite. ID sign and e&s ok.
2443550 Primary Facility 2016-01-26 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit-equipment-tank battery-dike look ok.
2480497 Primary Facility 2016-05-03 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2538010 Primary Facility 2016-11-18 Routine/Complete Inspection No Violations Noted Drilling had been completed, well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. The site had been stabilized and there was no observed accelerated erosion or sedimentation.
2583512 Primary Facility 2017-04-17 Routine/Complete Inspection No Violations Noted Well tagged-on-annulus open. Well head casing-production set equipment-tank battery-dike containment look ok.
2589374 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted All site and access road erosion controls had been properly implemented and maintained as outlined in the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Site had been effectively stabilized with vegetative cover. Waste fluid storage tanks located onsite within secondary containment. Both the tanks and containment appeared to be in sound condition. Well development impoundment located onsite and it contained withdrawn fluids.
2674091 Primary Facility 2017-12-19 Routine/Complete Inspection No Violations Noted At time of inspection, well 6H drilled and appears equipped for production. Wells 2H, 1H, 3H, 4H, 5H also drilled and appear equipped for production.
2683778 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 6H drilled and appears equipped for production. Wells 1H, 2H, 3H, 4H, 5H also drilled and appear equipped for production.
2709949 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2771440 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Four brine tanks located on site. An additional brine tank located on eastern side of well pad site located in secondary containment.
2798056 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, dike containment and tank battery look ok.
2821115 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2847432 Primary Facility 2019-02-26 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks. The cellar was filled with water. No bubbles were seen. Tubing pressure was reading at around 408 psi and the casing pressure was 733 psi. There was a separator at the well. Also onsite were 3 dual line heaters and within a lined steel dike were 4 tanks. Pad was being used to store equipment and temporary work areas were set up. One had welding activity occurring. A compressor station was near the well pad.

For data sources see[9]

References