X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31261

Well Details

Well ID: 37-005-31261
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 153668
Farm/Lease Name: RENSHAW 1H
License Status:
Spud Date:
Permit Date: 2016-05-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.715939
Longitude: -79.621661

For data sources see[1][2][3]

Well History

Date Event
2016-05-12 New Permit Application
2017-03-08 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-17 2017-11-08 6,921 14,962,800 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (15%) Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.0957358 132856
Water 7732-18-5 85 0.542503 752850
KFR-16FW Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0162814 22594.3
oleic acid diethanolamide 93-83-4 1.5 0.00122111 1694.57
Water 7732-18-5 60 0.0488443 67783
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000814072 1129.72
ammonium chloride 12125-02-9 1.5 0.00122111 1694.57
KSI-19NW Keane Scale Inhibitor Methanol 67-56-1 30 0.00509734 7073.76
Other Chemical(s) Listed Above See Trade Name(s) List Fatty imidazoline 61790-69-0 5 0.00006541 90.777
didecyldimethylammonium chloride 7173-51-5 8 0.000737233 1023.09
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0162814 22594.3
prop-2-yn-1-ol 107-19-7 5 0.00006541 90.777
Water 7732-18-5 92.5 0 0
ammonium chloride 12125-02-9 1.5 0.00122111 1694.57
Water 7732-18-5 85 0.542503 752850
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.00049118 681.629
alcohols, C12-16, ethoxylated 68551-12-2 1 0.000814072 1129.72
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00006541 90.777
isoproyl alcohol 67-63-0 5 0.00006541 90.777
xylene 1330-20-7 5 0.00006541 90.777
oleic acid diethanolamide 93-83-4 1.5 0.00122111 1694.57
ethylbenzene 100-41-4 1 0.00001308 18.155
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 9.2754 12,871,800.0
Water Ascent Carrier/Base Fluid Water 7732-18-5 100 89.9774 124,865,000.0
KAI-12 Keane Acid Inhibitor prop-2-yn-1-ol 107-19-7 5 0.00006541 90.777
xylene 1330-20-7 5 0.00006541 90.777
isoproyl alcohol 67-63-0 5 0.00006541 90.777
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00006541 90.777
Fatty imidazoline 61790-69-0 5 0.00006541 90.777
ethylbenzene 100-41-4 1 0.00001308 18.155
Methanol 67-56-1 90 0.00117745 1633.98
MBC-516 Keane Biocide glutaral 111-30-8 26.7 0.00246978 3427.4
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.00049118 681.629
didecyldimethylammonium chloride 7173-51-5 8 0.000737233 1023.09

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2018 SNYDER BROS INC 1,635,298.00 320 0.00 0 0.00 0
2019 SNYDER BROS INC 625,807.00 152 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC 491.25 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 915.80 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 491.25 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 227.20 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 101.60 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC Produced Fluid 133.90 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Synthetic Liner Materials 4.08 Tons LANDFILL 100585
2017 SNYDER BROS INC Drill Cuttings 915.80 Tons LANDFILL 100585
2018 SNYDER BROS INC Synthetic Liner Materials 3.89 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 25,813.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 2,212.10 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 10.80 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 446.80 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 59.05 Tons LANDFILL 100585
2018 SNYDER BROS INC Filter Socks 0.73 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 12,713.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 1,244.20 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 39.40 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 SNYDER BROS INC Produced Fluid 2,397.30 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Produced Fluid 9.60 Bbl INJECTION DISPOSAL WELL 34-155-23196

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2571147 Primary Facility 2017-03-13 Routine/Complete Inspection No Violations Noted Drilling appeared to have commenced but was not ongoing at the time of the inspection. All access road and site erosion controls had been implemented and maintained properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2573226 Primary Facility 2017-03-20 Drilling/Alteration No Violations Noted Well spudded to 42' on 3/9/2017. Set 42' of new 24" conductor pipe. Cellar-casing look ok.
2599998 Primary Facility 2017-05-23 Drilling/Alteration No Violations Noted Top hole TD'd waiting on finishing rig. Ran and cemented 893' of 13 3/8" pipe with 662 sks cement-got good 30 bbl return. Ran 2206' of 9 5/8"-cemented with 658 sks cement-got good 30 bbl return. All equipment on site looked ok.
2606698 Primary Facility 2017-06-22 Routine/Complete Inspection No Violations Noted Top-hole drilling had been completed, drill rig had been moved off-site. Well development secondary containment located onsite and it appeared to be in sound condition. There was no evidence observed of any spills to the containment,i.e. There were no sheens observed in the puddles of precipitation on the secondary containment. All access road and site erosion controls had been properly maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2619740 Primary Facility 2017-07-24 Drilling/Alteration No Violations Noted The Rig was drilling at 12,043' at the time of this inspection. Drilling site info, BOP test charts and all equipment on site looked ok.
2633966 Primary Facility 2017-09-08 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Secondary containment was located onsite. Minimal precipitation had accumulated on the containment. No sheens were observed in the puddles of water located on the containment. All erosion controls had been properly implemented and maintained as outlined in the E&S plan contained within the ESCGP. Disturbed areas, cut and fill slopes had been temporarily stabilized and vegetation had begun to emerge. There was no observed accelerated erosion or sedimentation in relation to the access road.
2647155 Primary Facility 2017-10-13 Routine/Complete Inspection No Violations Noted Well development impoundment construction had been completed and those areas disturbed by that construction had been temporarily stabilized. All site and access road erosion controls had been implemented and maintained as outlined in the E&S plan included within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Work was underway to set-up equipment and prepare the site for well stimulation activities slated to begin on 10/15/17. Secondary containment had been implemented as outlined in the containment plan.
2681579 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted At time of inspection, wells 1H, 2H, 3H, and 4H have been frac'd, not yet equipped for production. On-site contractors appear to be installing production equipment during this inspection.
2750717 Primary Facility 2018-07-11 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, containment dike and tank battery looks ok.

For data sources see[8]

References