X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-31275

Well Details

Well ID: 37-005-31275
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154091
Farm/Lease Name: NOLDER
License Status:
Spud Date:
Permit Date: 2017-03-20
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.852017
Longitude: -79.558244

For data sources see[1][2][3]

Well History

Date Event
2017-03-20 New Permit Application
2017-04-24 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-24 2018-08-04 6,595 20,126,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 KFR-16FW Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 20 0.000910945 1709.04
Water 7732-18-5 60 0.00273284 5127.12
ammonium chloride 12125-02-9 1.5 0.00006832 128.178
oleic acid diethanolamide 93-83-4 1.5 0.00006832 128.178
alcohols, C12-16, ethoxylated 68551-12-2 1 0.00004555 85.452
KFR-36 Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 60 0.0159567 29936.7
KSI-22 Keane Scale Inhibitor 2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic
acid monosodium salt and sodium phosphinite
110224-99-2 10 0.00222899 4181.85
Methanol 67-56-1 50 0.011145 20909.2
MBC-516 Keane Biocide quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000713246 1338.13
glutaral 111-30-8 26.7 0.00358638 6728.46
didecyldimethylammonium chloride 7173-51-5 8 0.00107054 2008.46
Hydrochloric Acid (15%) Keane Acid Inhibitor Hydrochloric Acid 7647-01-0 15 0.0749943 140698
Water 7732-18-5 85 0.424968 797289
Other Chemical(s) Listed Above See Trade Name(s) List xylene 1330-20-7 5 0.00005332 100.04
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000713246 1338.13
ammonium chloride 12125-02-9 1.5 0.00006832 128.178
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.000910945 1709.04
isoproyl alcohol 67-63-0 5 0.00005332 100.04
prop-2-yn-1-ol 107-19-7 5 0.00005332 100.04
didecyldimethylammonium chloride 7173-51-5 8 0.00107054 2008.46
Fatty imidazoline 61790-69-0 5 0.00005332 100.04
2-propenoic acid, polymer with
2-methyl-2-[(1-oxo-2- propenyl)amino]-1-propensulfonic
acid monosodium salt and sodium phosphinite
110224-99-2 10 0.00222899 4181.85
oleic acid diethanolamide 93-83-4 1.5 0.00006832 128.178
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005332 100.04
ethylbenzene 100-41-4 1 0.00001066 20.008
alcohols, C12-16, ethoxylated 68551-12-2 1 0.00004555 85.452
Water 7732-18-5 85 0.424968 797289
Water Snyder Brothers, Inc Carrier/Base Fluid Water 7732-18-5 100 89.5232 167,956,000.0
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 9.90893 18,590,300.0
KAI-12 Keane Acid Inhibitor Methanol 67-56-1 90 0.000959811 1800.72
xylene 1330-20-7 5 0.00005332 100.04
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005332 100.04
prop-2-yn-1-ol 107-19-7 5 0.00005332 100.04
isoproyl alcohol 67-63-0 5 0.00005332 100.04
Fatty imidazoline 61790-69-0 5 0.00005332 100.04
ethylbenzene 100-41-4 1 0.00001066 20.008

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2018 SNYDER BROS INC 555,973.00 69 0.00 0 0.00 0
2019 SNYDER BROS INC 1,407,159.00 352 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC 2,203.75 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 27.37 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 441.28 Tons LANDFILL 100585
2017 SNYDER BROS INC Drill Cuttings 1,131.78 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 2,263.46 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 801.20 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Synthetic Liner Materials 1.92 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 24,508.40 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 96.37 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 1,066.10 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Synthetic Liner Materials 2.16 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 18,138.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 4,297.80 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2584997 Primary Facility 2017-04-20 Preoperation Inspection No Violations Noted Site construction had been completed. All access road and site erosion controls had been implemented as outlined in the E&S plan contained within the ESCGP. All controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2591825 Primary Facility 2017-05-09 Drilling/Alteration No Violations Noted Spudded 4/25/2017. Ran 42' of 30" casing-cemented to surface-covered with a steel plate until Rig arrives. Paper work in place-site looks ok.
2608100 Primary Facility 2017-06-26 Drilling/Alteration No Violations Noted Top hole Rig had drilled this well to the kick off point - moved to the next hole and covered the cellar with a steel plate. Site looks ok.
2612508 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted The RD 20 Rig had just moved on to this well and began drilling at the time of this inspection. Daily drilling info and all equipment on site looked ok.
2613756 Primary Facility 2017-07-10 Drilling/Alteration No Violations Noted The Rig was drilling at 2,108' at the time of this inspection. Ran 972' of 13"-cemented with 625 sks cement-got 25 bbl return. Daily drilling info-all equipment on site looked ok.
2617268 Primary Facility 2017-07-20 Routine/Complete Inspection No Violations Noted Drilling was ongoing for the Nolder 1H at the time of the inspection. Well-site secondary containment located onsite and it appeared to be in sound condition and functioning as intended. Drill cuttings are being collected to be hauled offsite for disposal. All site and access road erosion controls had been installed properly and were functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2624941 Primary Facility 2017-08-07 Drilling/Alteration No Violations Noted Well drilled to kick off point-casing covered over with steel plate waiting on finishing rig. All equipment on site looked ok.
2635211 Primary Facility 2017-09-11 Routine/Complete Inspection No Violations Noted Drilling was ongoing for Nolder 4H at the time of the inspection. Secondary containment was located onsite. There were no issues observed in relation to the secondary containment. All site and access road controls had been implemented and maintained as outlined in the E&S plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2637284 Primary Facility 2017-09-18 Drilling/Alteration No Violations Noted The Rig was drilling at 11,441' at the time of this inspection. The on site drilling log was up to date and all equipment on site looked ok.
2661654 Primary Facility 2017-11-16 Routine/Complete Inspection No Violations Noted At time of inspection, well 3H drilled, not yet frac'd. 4H, 2H, 1H drilled, not yet frac'd. Rig not on-site. No tanks on-site. Pad containment remains on-site.
2683715 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 3H drilled, not yet frac'd. Wells 1H, 2H, and 4H also drilled, not yet frac'd. No rig on-site.
2705267 Primary Facility 2018-03-14 Routine/Complete Inspection No Violations Noted This well has been drilled and is waiting on frac. The well head casing, cellar, protective grating, containment and piping on site looks ok.
2713769 Primary Facility 2018-03-20 Routine/Complete Inspection No Violations Noted At time of inspection, well 3H drilled, not yet frac'd. Wells 1H, 2H, 4H also drilled, not yet frac'd. No rig on-site.
2724814 Primary Facility 2018-04-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 3H drilled, not yet frac'd. Wells 1H, 2H, 4H also drilled, not yet frac'd. No rig on-site.
2748318 Primary Facility 2018-07-03 Routine/Complete Inspection No Violations Noted At time of inspection, frac'g equipment and crew on-site preparing to resume stimulation operations. Keane safety representative Carl on-site.
2760922 Primary Facility 2018-08-07 Routine/Complete Inspection No Violations Noted This well has been fracked and is awaiting the snubbing unit to drill out the plugs. The well head casing and equipment looks ok.
2798077 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted Flow back operations have been completed on this well and it has the new well head and equipment installed and is awaiting turn on to the new pipeline. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
2821143 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[8]

References