37-005-31282

Well Details

Well ID: 37-005-31282
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 153958
Farm/Lease Name: DYNAMITE
License Status:
Spud Date:
Permit Date: 2017-02-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.869203
Longitude: -79.565958

For data sources see[1][2][3]

Well History

Date Event
2017-02-02 New Permit Application
2017-02-13 Performed Spud Operation

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-09 2017-09-12 6,423 17,314,200 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SI-1171 Producers Service Corp Scale Inhibitor Hexamethylene Triamine Penta 34690-00-1 3 0.000362542 586.873
Phosphino Carboxylic Acid Polymer 71050-62-9 3 0.000362542 586.873
DETA phosphonate 15827-60-8 3 0.000362542 586.873
Copolymer of Maleic and Acrylic Acid 52255-49-9 10 0.00120847 1956.24
NEFE-180 Producers Service Corp Corrosion Inhibitor/Iron Control 2-Propyn-1-ol 107-19-7 5 0.00006226 100.791
Coconut oil acid diethanolamine 68603-42-9 5 0.00006226 100.791
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006226 100.791
Acetic Acid 64-19-7 65 0.00080943 1310.28
2-Ethylhexanol 104-76-7 10 0.000124528 201.582
Fatty Acids, tall oil 61790-12-3 5 0.00006226 100.791
Methanol 67-56-1 35 0.000435847 705.536
BIO CLEAR 1430 Producers Service Corp Biocide Dimethylamine 68439-70-3 0.5 0.00006112 98.932
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5 0.000611158 989.325
Glutaraldehyde 111-30-8 20 0.00244463 3957.3
Water Company 1 Carrier/Base Fluid Water 7732-18-5 100 89.2573 144,487,000.0
STIMLUBE F Producers Service Corp Friction Reducer Alcohols, ethoxylated 68002-97-1 3.1 0.00237511 3844.76
Petroleum Distallates 64742-47-8 30 0.0229849 37207.3
Alcohols, ethoxylated 68439-50-9 3.1 0.00237511 3844.76
Alcohols, ethoxylated 68551-12-2 3.1 0.00237511 3844.76
Other Chemical(s) Listed Above See Trade Name(s) List Alcohols, ethoxylated 68002-97-1 3.1 0.00237511 3844.76
2-Propyn-1-ol 107-19-7 5 0.00006226 100.791
Phosphino Carboxylic Acid Polymer 71050-62-9 3 0.000362542 586.873
Fatty Acids, tall oil 61790-12-3 5 0.00006226 100.791
Methanol 67-56-1 35 0.000435847 705.536
Dimethylamine 68439-70-3 0.5 0.00006112 98.932
DETA phosphonate 15827-60-8 3 0.000362542 586.873
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006226 100.791
Alcohols, ethoxylated 68551-12-2 3.1 0.00237511 3844.76
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5 0.000611158 989.325
Hexamethylene Triamine Penta 34690-00-1 3 0.000362542 586.873
Coconut oil acid diethanolamine 68603-42-9 5 0.00006226 100.791
Alcohols, ethoxylated 68439-50-9 3.1 0.00237511 3844.76
2-Ethylhexanol 104-76-7 10 0.000124528 201.582
Sand (Proppant) Producers Service Corp Proppant Silica Substrate 14808-60-7 100 9.96124 16,125,000.0
15% HCL Producers Service Corp Acidizing Hydrochloric Acid 7647-01-0 15 0.1019 164952

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 128,559.00 14 0.00 0 0.00 0
2018 SNYDER BROS INC 1,684,705.00 345 0.00 0 0.00 0
2019 SNYDER BROS INC 1,224,578.00 351 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC 747.50 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC 1,058.84 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste 820.99 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid 8,356.20 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Produced Fluid 318.00 Bbl INJECTION DISPOSAL WELL 34-155-23196
2017 SNYDER BROS INC Produced Fluid 3,802.85 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Synthetic Liner Materials 2.48 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid 46.97 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid 1,278.93 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Drill Cuttings 1,058.84 Tons LANDFILL 100585
2018 SNYDER BROS INC Synthetic Liner Materials 3.95 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid 31,251.10 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 1,196.10 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 SNYDER BROS INC Produced Fluid 64.60 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid 293.90 Bbl INJECTION DISPOSAL WELL 34-155-24079
2018 SNYDER BROS INC Produced Fluid 11.45 Tons LANDFILL 100585
2018 SNYDER BROS INC Filter Socks 1.37 Tons LANDFILL 100585
2019 SNYDER BROS INC Produced Fluid 11,267.10 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 543.50 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 19.00 Bbl INJECTION DISPOSAL WELL 34-155-23223
2019 SNYDER BROS INC Produced Fluid 2,343.80 Bbl REUSE (AT WELL PAD)

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2562487 Primary Facility 2017-02-16 Drilling/Alteration No Violations Noted Drilling permit on site-log book up to date-6'x6' cellar-Rocky Mt Rig drilled and set 84' of new 24" pipe. Hit H2O @ 72'. Site looked good.
2583432 Primary Facility 2017-04-17 Drilling/Alteration No Violations Noted Rig ran and cemented 875' of 13 3/8" with 699 sks-30 bbl return. Rig waiting on cement @ time of inspection. Daily drilling log-all equipment on site looked ok.
2604741 Primary Facility 2017-06-16 Routine/Complete Inspection No Violations Noted Drilling for the Dynamite 2H is anticipated to begin on or about 06/19/17. Drilling was ongoing on the well pad for the Dynamite 3H. Secondary containment onsite and it appeared to be in sound condition. Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal. All E&S controls had been properly implemented and maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2605968 Primary Facility 2017-06-20 Drilling/Alteration No Violations Noted Operator walking Precision 532 Rig over to this hole and installing the BOP at the time of this inspection. All equipment on site looked ok.
2608077 Primary Facility 2017-06-26 Drilling/Alteration No Violations Noted Precision Rig # 532 just walked over to this well and was getting ready to commence drilling to TD. Daily drilling info and all equipment on site looked ok.
2619506 Primary Facility 2017-07-27 Routine/Complete Inspection No Violations Noted Drilling had been completed, work was ongoing to prep the site for well stimulation activities. Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment. All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2626436 Primary Facility 2017-08-14 Drilling/Alteration No Violations Noted Frac crew set 2 retrievable plugs and performed a negative/positive test after installing each plug. A hanger with BPV was also installed in well to provide a third barrier of protection while RD existing problematic valves and waiting on replacements at the time of this inspection.
2626491 Primary Facility 2017-08-15 Drilling/Alteration No Violations Noted Crew tearing down frac stack valves and waiting on new valves from another company at the time of this inspection. Well head looked ok.
2628188 Primary Facility 2017-08-21 Drilling/Alteration No Violations Noted Frac crew just set new Weatherford frac stack valves-pressure tested and rigging back up to continue frac. All equipment on site looked ok.
2630633 Primary Facility 2017-08-28 Drilling/Alteration No Violations Noted The wireline unit was perfing stage 25 out of the planned 55 stages at the time of this inspection. The equipment looked ok.
2641949 Primary Facility 2017-09-29 Routine/Complete Inspection No Violations Noted Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017. All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2648468 Primary Facility 2017-10-17 Routine/Complete Inspection No Violations Noted All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan. Well stimulation activities had been completed. Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs.
2665261 Primary Facility 2017-11-29 Routine/Complete Inspection No Violations Noted At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells.
2680913 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted At time of inspection, well 2H is drilled and appears equipped for production. Wells 1H, 3H, and 4H are also drilled and appear equipped for production.
2709847 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2724362 Primary Facility 2018-04-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 2H is drilled and appears equipped for production. Wells 1H, 3H, and 4H are also drilled and appear equipped for production.
2743234 Primary Facility 2018-06-13 Routine/Partial Inspection No Violations Noted At time of inspection, well 2H is drilled and appears equipped for production. Wells 1H, 3H, and 4H are also drilled and appear equipped for production.
2766737 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2818440 Primary Facility 2018-12-17 Site Restoration No Violations Noted Inspection conducted in response to Post Drilling Restoration Report received by Department.

Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site. This restoration report has been reviewed and is approved.

2821026 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[8]