Well Details

Well ID: 37-005-31290
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: South Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 154284
Farm/Lease Name: NEUMANN 3H
License Status:
Spud Date:
Permit Date: 2017-08-02
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.708856
Longitude: -79.626639

For data sources see[1][2][3]

Well History

Date Event
2017-08-02 New Permit Application
2018-07-05 Performed Spud Operation

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 SNYDER BROS INC 392,095.00 63 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2018 SNYDER BROS INC Drilling Fluid Waste 16.88 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 100.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Produced Fluid 562.75 Tons LANDFILL 100585
2018 SNYDER BROS INC Drill Cuttings 592.32 Tons LANDFILL 100585
2019 SNYDER BROS INC Other Oil & Gas Wastes 150.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 284.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 SNYDER BROS INC Produced Fluid 6,391.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid 1,064.80 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Other Oil & Gas Wastes 3.80 Bbl INJECTION DISPOSAL WELL 34-099-23171
2019 SNYDER BROS INC Produced Fluid 4,958.00 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Other Oil & Gas Wastes 13.10 Bbl INJECTION DISPOSAL WELL 34-155-23196
2019 SNYDER BROS INC Synthetic Liner Materials 5.85 Tons LANDFILL 100280
2019 SNYDER BROS INC Synthetic Liner Materials 2.78 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019 SNYDER BROS INC Other Oil & Gas Wastes 311.70 Bbl REUSE (AT WELL PAD)
2019 SNYDER BROS INC Produced Fluid 698.80 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Filter Socks 0.46 Tons LANDFILL 100585
2019 SNYDER BROS INC Other Oil & Gas Wastes 21.90 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid 40.35 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019 SNYDER BROS INC Produced Fluid 10.26 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-181
2019 SNYDER BROS INC Waste Water Treatment Sludge 22.40 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2749899 Primary Facility 2018-07-09 Routine/Complete Inspection No Violations Noted Inspection conducted in response to electronic spud notification scheduled for 7/5/18 for well 3H.

At time of inspection, auger rig on-site. Wells 1H, 2H, 3H, 4H, 5H, and 6H have been spudded. Wells 7H and 8H to be spudded today.

2750666 Primary Facility 2018-07-11 Drilling/Alteration No Violations Noted This well was spudded on 7/7/2018. The cellar is 6'X6'. The conductor hole was drilled to 41' and has 41' of 30" pipe installed and cemented to surface. The well has been covered with a steel plate for safety until the top hole Rig arrives.
2763349 Primary Facility 2018-08-14 Drilling/Alteration No Violations Noted This well was spudded on 7/7/2018. The cellar is 6'X6'. The conductor hole was drilled to 41' and has 41' of 30" pipe installed and cemented to surface.

On the date of this inspection the rig was just tripping in the hole getting ready to continue drilling. All equipment on site looked ok.

2793609 Primary Facility 2018-10-24 Drilling/Alteration No Violations Noted On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok.
2800519 Primary Facility 2018-11-08 Drilling/Alteration No Violations Noted On this return date, the Patterson Finishing Rig is moving on the well pad and setting up to resume drilling the final lateral leg of this well and the rest of the 8 wells on this pad. The drillers log and permit copies are on site and all equipment looks ok.

On this date the rig was drilling the lateral section at 8431'. All paperwork and equipment on site looked ok.

2802734 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted Present during inspection is operator rep Rod Bennett.

According to Department records, this well was spud on 7-5-18. At time of inspection drilling actively taking place on well 2H. According to Mr. Bennett, this well (3H) and 4H have been drilled and cemented and drilling will begin on well 1H next week. Mr. Bennett also states that operator intends to drill wells 5H, 6H, 7H, and 8H on this pad.

For data sources see[7]