37-015-20871

Well Details

Well ID: 37-015-20871
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Orwell Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 149183
Farm/Lease Name: REXFORD 2H
License Status:
Spud Date:
Permit Date: 2010-05-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.877783
Longitude: -76.309375

For data sources see[1][2][3]

Well History

Date Event
2010-05-06 New Permit Application
2010-06-07 Performed Spud Operation
2010-10-06 Perforation
2014-02-14 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 289,763.00 95 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 386,114.00 358 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 174,613.00 359 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 168,957.00 345 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 142,579.00 350 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 109,092.00 351 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 91,054.00 365 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 4,965.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,221.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC007
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 1,167.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 8,824.17 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 4,893.62 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 50.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 453.16 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 56.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 212.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 605.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 126.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 147.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 58.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 5.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 58.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 99.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 382.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 112.00 Bbl REUSE (AT WELL PAD)
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 110.10 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 50.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 0.40 Tons LANDFILL 301626

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1880300 Primary Facility 2010-04-14 Routine/Complete Inspection No Violations Noted
1955193 Primary Facility 2011-03-03 Routine/Complete Inspection Violation(s) Noted Significant bubbling in cellar / uncontrolled release of gas. 80% combustible gas reading off of annuli. Well located right off of Rt 187. Immediate attention needed.
1960337 Primary Facility 2011-03-11 Routine/Complete Inspection No Violations Noted 20" - 50'
1964452 Primary Facility 2011-04-08 Follow-up Inspection Violation(s) Noted Significant bubbling in cellar. Uncontrolled release of gas. Well shut in for 24 hours by EFS. All gauges pulled. Bubbling outside of 20" conductor and between 13 3/8 and 20" annuli.
1976897 Primary Facility 2011-05-18 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Methane vented to tank. No vent on 13 5/8 vent port. No visible bubbling in cellar.
1987626 Primary Facility 2011-07-13 Routine/Complete Inspection Violation(s) Noted 13 3/8 x 9 5/8 - 98% combustible gas. 9 5/8 x 5 1/2 - 30% combustible gas. Significant bubbling in cellar.
2001689 Primary Facility 2011-08-25 Routine/Complete Inspection Outstanding Violations - No Viols Req'd 100% combustible gas off of 13 3/8. 10% comb gas off of 9 5/8. Bubbles in cellar. Not vented to tank.
2020669 Primary Facility 2011-10-11 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Met with CHK personnel to get samples and to preform flow test. This well is fract but plugs not drilled out. Utilizing U type manometer and Miriam Inst Model 10AA25WM and 1/4" orifice. 15# range.
2020675 Primary Facility 2011-11-18 Routine/Complete Inspection No Violations Noted Workover rig on location. Snubbing unit arrived on 11/16/11. Currently drilling out fract plugs and doing completion operations. Will run 2 7/8 with packer into production string with wireline instead of snubbing unit due to high pressure.
2022682 Primary Facility 2011-11-22 Routine/Complete Inspection No Violations Noted Sett RBP at 2665' Well is perforated from 2555 to 2557'. Waiting on Schulumberger to perform squeeze job. Once cemented, CHK will allow to cure for a least 5 days. will then was-out, pump, drill out and test.
2022683 Primary Facility 2011-11-23 Routine/Complete Inspection No Violations Noted Workover rig off location. Waiting for cement to cure from perf and squeeze.
2022685 Primary Facility 2011-11-29 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Crews onsite digging out cellar. Plan on digging down approx 43". Visible bubbling in cellar between conductor and cellar wall.
2024130 Primary Facility 2011-12-03 Drilling/Alteration Outstanding Violations - No Viols Req'd Crews onsite continuing to dig out cellar to expose fabricated cap so that it can be removed. This AM the 9 5/8 annulus built up 500# pressure so vent lines were hooked up to vent to tanks so that workers could continue to safely work around wellhead.
2024139 Primary Facility 2011-12-05 Drilling/Alteration Outstanding Violations - No Viols Req'd Cellar dug out and fabricated cap exposed so that it can be removed. Crew onsite removing lines from 9 5/8 annulus to tanks. 500# psi still on 9 5/8. Cellar pumped down.
2029929 Primary Facility 2011-12-27 Follow-up Inspection Outstanding Violations - No Viols Req'd uncontrolled annular flow as noted in earlier violations
2030201 Primary Facility 2011-12-28 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Gas was flowing around the entire circumference of the well head which was submerged in water. The vent on the 5 ½ x 9 5/8 were open. 0 psi on gauges.
2032616 Primary Facility 2012-01-09 Drilling/Alteration Outstanding Violations - No Viols Req'd Rig set up on adjacent well no remidiation work being done on 2-h , cellar dry cap has not been repaired at this time nor has well been vented
2032629 Primary Facility 2012-01-05 Follow-up Inspection Outstanding Violations - No Viols Req'd strong flow of gas around entire csing circumfrance , no remidiation being performed at this time.
2033420 Primary Facility 2012-01-11 Follow-up Inspection Outstanding Violations - No Viols Req'd no activity being done on this well ,rig on next well 5-h drilling out frac plugs
2049356 Primary Facility 2012-03-05 Drilling/Alteration Outstanding Violations - No Viols Req'd Workover rig onsite. Crews onsite monitoring pressures.
2063649 Primary Facility 2012-03-12 Routine/Complete Inspection No Violations Noted Fab cap 13 3/8 - 0 psi on gauge. 0% combustible gas
2098727 Primary Facility 2012-07-05 Routine/Complete Inspection No Violations Noted Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, .5% combustible gas off of vent
2098730 Primary Facility 2012-08-16 Routine/Complete Inspection No Violations Noted Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 2% spike of combustible gas off of vent. Meter holds at 1.5% combustible gas
2098733 Primary Facility 2012-08-22 Routine/Complete Inspection No Violations Noted Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 1% combustible gas off of vent.
2098737 Primary Facility 2012-08-27 Routine/Complete Inspection No Violations Noted Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 2% combustible gas off of vent. Meter holds at 1.5% combustible gas
2098738 Primary Facility 2012-09-05 Routine/Complete Inspection No Violations Noted Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 1% combustible gas off of vent. Meter holds at .5% combustible gas
2098740 Primary Facility 2012-09-10 Routine/Complete Inspection No Violations Noted Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 2% combustible gas off of vent. Meter holds at 1% combustible gas
2120030 Primary Facility 2012-10-10 Routine/Complete Inspection No Violations Noted Back pressure vavle installed. Performing 48 hour shut-in tests. Well currently shut-in. Fab cap - 0 psi. 9 5/8 - 0 psi (pop-off valve installed). 5 1/2 - 10 psi.
2120679 Primary Facility 2012-10-03 Routine/Complete Inspection No Violations Noted 0 psi on fabricated surface cap (13 x 20) - .5%spike combustible gas, .2%hold
2120687 Primary Facility 2012-09-25 Routine/Complete Inspection No Violations Noted Fabricated surface cap (13 X 20) - 0 psi (vented) - 1 % spike, .5% hold combustible gas
2194581 Primary Facility 2013-08-02 Routine/Complete Inspection Pending Inspection is for 'Inactive Well Status' application.
2203360 Primary Facility 2013-09-04 Routine/Complete Inspection No Violations Noted
2239231 Primary Facility 2014-01-13 Routine/Complete Inspection No Violations Noted
2259239 Primary Facility 2014-04-02 Routine/Complete Inspection Outstanding Violations - No Viols Req'd Open violations associated with NOV dated 8/29/2011 remain - combustible gas detected outside Surface casing.
2265005 Primary Facility 2014-04-17 Routine/Complete Inspection Violation(s) Noted Gas detected outside surface casing: 78.73(b) - General provision for well construction and operation; 78.85(a)(5) - Cement standards.
2374248 Primary Facility 2015-05-28 Routine/Complete Inspection Outstanding Violations - No Viols Req'd
2378451 Primary Facility 2015-06-12 Follow-up Inspection Outstanding Violations - No Viols Req'd
2493910 Primary Facility 2016-06-16 Follow-up Inspection Outstanding Violations - No Viols Req'd At time of inspection, arrived on site at 9:30a.m. On site to conclude the 72 hr. Pressure Build-up Test (PBUT) being performed on the 5H and the 2H as part of an ongoing migration investigation. I was accompanied by Eric Rooney (DEP Geologist), we met with Joel Mincer (lease operator for Chesapeake) and Tom Messing of Leidos. The wells were shut in on 6/13/16 at 10:15a.m. It was noticed that the pop off valves were still on the (28x20), (20x13¿), and (13¿x9¿) vent pipes on the 2H and on the (28x20) and (20x13¿) vent pipes on the 5H.

Tom called Charlie Olmsted of Chesapeake to let him know of the pop off valves and Charlie said the PBUT would be rescheduled for sometime in July. No gas samples or pressure reading were taken. I left the site at 10:50a.m.

2502271 Primary Facility 2016-07-18 Routine/Complete Inspection Outstanding Violations - No Viols Req'd At time of inspection, arrived on site at 13:10p.m. for a post 72hr pressure build up test (PBUT), the cellar was empty, I met with lease operators Joel Mincer and Joel Failie. They were setting up the wells for the 72hr PBUT, Joel Mincer had to go to the shop to get some connections, he returned about 15:00p.m. The production line was shut in at 15:30p.m. and the other annuli’s were shut in and set up with a digital recorder at 5:26p.m. The vent pipes from the 28" and 20" caps were set up with a 15lb pop off valve and they had a hose going to a plastic tank.

I left the site at 5:30p.m.

2503856 Primary Facility 2016-07-21 Follow-up Inspection Outstanding Violations - No Viols Req'd At time of inspection, arrived on site at 16:10p.m. to conclude the 72hr. Pressure Build-up Test (PBUT) being performed on the 2H and the 5H as part of an ongoing migration investigation. The cellar had water at the bottom with no bubbling noticed. I met with Joel Mincer (lease operator for Chesapeake), Tom Messing and Shauna Erway of Leidos. The wells were shut in on 7/18/16 at 17:26,Tom used a Gas Explorer gas meter by Bascom Turner calibrated on 7/21/16 to check for gas show at all annuli’s, gas samples were taken if gas was detected. Pressures were taken from a 30psi pressure gauge for the 28" and 20" annuli’s, and from the SCADA digital pressure gauges on the wells for the rest of the annuli’s. The 28" and 20" annuli’s were set up with 15psi pop off valves and connected to poly tanks, there was no gas detected at the tanks. We started taking pressures at 17:25 on the 5H.

I left the site at 18:30p.m.

2575953 Primary Facility 2017-03-20 Routine/Complete Inspection No Violations Noted On March 20, 2017, the Department conducted a routine inspection at the Chesapeake Appalachia, LLC (Chesapeake) Rexford Location in Orwell Township, Bradford County. Andrew Hobbins, Water Quality Specialist, represented the Department. Nobody was present for Chesapeake.

The E&S plan, site sign and weekly inspection reports were on site and available for review. The site was mostly covered in about 8 inches of snow. PCSM has not been addressed at the site.

There were two well in production phase during the inspection. Both wells were labeled and no bubbling was observed in the well cellar. Two production tanks and two GPUs were on site. The production tanks were on secondary containment.

The ESGGP-2 permit expires 1/11/2021. A major modification was approved on January 12, 2016 to address PCSM. According to Department records, there are no active well permits for the Rexford Location. The well pad retains its original shape and has not been reduced in size. The Department recommends installi

2591650 Primary Facility 2017-05-08 Routine/Complete Inspection Outstanding Violations - Viols Req'd At time of inspection, arrived on site at 12:00p.m. for a pre-PBUT inspection.

The cellar was about three quarters full of water with no bubbling noticed. The (28x20) annulus was set up with a pop off valve and a 60psi pressure gauge with 0psi on it. The (20x13) annulus was set up with a digital recorder and a 60psi pressure gauge with 0psi on it. The (13x9) annulus was set up with a SCADA digital pressure gauge with 0psi on it and the valve going to the production tank was closed. The (9x5) annulus was set up with a SCADA digital pressure gauge with 12psi on it and the valve going to the production tank was closed. The 5½ production casing was open and venting to the production tank with 0psi on the SCADA pressure gauge. There was 858psi on the production tubing. I left the site at 13:05 p.m.

2593884 Primary Facility 2017-05-11 Follow-up Inspection Outstanding Violations - Viols Req'd At time of inspection, arrived on site at 8:00a.m. to conclude the 72hr. Pressure Build-up Test (PBUT) being performed on the 2H and the 5H as part of an ongoing migration investigation. The cellar was about half full of water with no bubbling noticed. I met with Joel Fairlie of Chesapeake, Tom Messing and Shauna Erway of Leidos. The wells were shut in on 5/8/17 at 8:15a.m. Tom used a Gas Explorer gas meter by Bascom Turner to check for gas show at all annuli’s, gas samples were taken if gas was detected. Pressures were taken from SSI Technology Inc. pressure gauge for the 28" and 20" annuli’s, and from the SCADA digital pressure gauges on the wells for the rest of the annuli’s. The wells were still producing.

We started taking pressures at 8:20a.m. on the 5H. I left the site at 9:15a.m.

2756116 Primary Facility 2018-07-11 Routine/Complete Inspection Outstanding Violations - Viols Req'd Remarks: At time of inspection. On site to check for gas presence, gas flows and take samples from the annuli of the 2H and 5H wells. I was accompanied by DEP OGI Supervisor, Mike Panettieri and DEP OGI, David Schoonover. We met with Chesapeake Reps. Max Goff (Operations Engineer), Lester Peterson (Optimization Technician), Joe Riley (Well Tender) and Leidos Rep. Tom Messing.

- Lester used an Eco meter to check the fluid level in the (9x5) and (5/Prod) annuli on 7/5/18. Tom used a Gas Explorer gas meter (calibrated on 7/10/18) to check for gas shows at annuli and I used an Altair 5X gas meter (calibrated on 7/9/18) to confirm the results. Joe used a Digital Manometer 621 with a 1/4" orifice to check for any flow rates at annuli. There were no measurable gas flow rates detected at any annuli, cemented to surface, of the 2H or 5H wells at time of inspection. Both wells (28"x 20"), (20"x 13 3/8") and (13 3/8"x 9 5/8") annuli had been open and venting for several weeks prior to this inspection. The results of

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1955193 606032 03/03/2011 2011-03-03 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
1964452 608448 04/08/2011 2011-04-08 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
1987626 615253 07/13/2011 2011-07-13 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
1987626 615254 07/13/2011 2011-07-13 78.84 - Insufficient casing strength, thickness, and installation equipment Administrative
2265005 694207 04/17/2014 2014-04-17 78.73B - Excessive casing seat pressure Administrative
2265005 694208 04/17/2014 2014-04-17 78.85 - Inadequate, insufficient, and/or improperly installed cement Environmental Health & Safety
2591650 785120 2017-05-08 78.85(a)5 Environmental Health & Safety
2591650 785121 2017-05-08 78a86 Environmental Health & Safety
2593884 785657 2017-05-11 78a85(a)5 Environmental Health & Safety
2593884 785658 2017-05-11 78a86 Environmental Health & Safety
2756116 823280 2017-05-08 78.85(a)5 Environmental Health & Safety Originally cited on 5/8/2017. No gas flows were noted in cemented annuli of the 2H well at time of this inspection.
2756116 823281 2011-03-03 78a86 Environmental Health & Safety Originally cited on 3/3/2011. Operator performed remedial work on the 2H well between 11/22/11 - 2/28/12. (See attached well bore diagram for details). No gas flows were noted in the cemented annuli of the 2H well at time of this inspection.
2756116 823282 2014-04-17 78.73(b) Environmental Health & Safety Originally cited in error as "78.73B" on 4/17/14.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
606032 275910 NOV - Notice of Violation
608448 275910 NOV - Notice of Violation
615253 275910 NOV - Notice of Violation
615254 275910 NOV - Notice of Violation
694207 310434 NOV - Notice of Violation
694208 310434 NOV - Notice of Violation