If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-20871 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.877783,"lon":-76.309375,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Bradford | |
Municipality: Orwell Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 149183 | |
Farm/Lease Name: REXFORD 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-05-06 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: No | |
Latitude: 41.877783 | |
Longitude: -76.309375 |
Date | Event |
---|---|
2010-05-06 | New Permit Application |
2010-06-07 | Performed Spud Operation |
2010-10-06 | Perforation |
2014-02-14 | DEVIATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHESAPEAKE APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHESAPEAKE APPALACHIA LLC | 289,763.00 | 95 | 0.00 | 0 | 0.00 | 0 |
2014 | CHESAPEAKE APPALACHIA LLC | 386,114.00 | 358 | 0.00 | 0 | 0.00 | 0 |
2015 | CHESAPEAKE APPALACHIA LLC | 174,613.00 | 359 | 0.00 | 0 | 0.00 | 0 |
2016 | CHESAPEAKE APPALACHIA LLC | 168,957.00 | 345 | 0.00 | 0 | 0.00 | 0 |
2017 | CHESAPEAKE APPALACHIA LLC | 142,579.00 | 350 | 0.00 | 0 | 0.00 | 0 |
2018 | CHESAPEAKE APPALACHIA LLC | 109,092.00 | 351 | 0.00 | 0 | 0.00 | 0 |
2019 | CHESAPEAKE APPALACHIA LLC | 91,054.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 4,965.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 1,221.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC007 |
2013 | CHESAPEAKE APPALACHIA LLC | Fracing Fluid Waste | 1,167.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC008 |
2013 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 8,824.17 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 100.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 4,893.62 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 50.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2015 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 453.16 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 56.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 212.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 605.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 126.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 147.50 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 58.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123NC010 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 5.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2016 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 58.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 99.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 382.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC018 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 55.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC010 |
2017 | CHESAPEAKE APPALACHIA LLC | Produced Fluid | 112.00 Bbl | REUSE (AT WELL PAD) | |
2017 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 110.10 Bbl | REUSE (AT WELL PAD) | |
2018 | CHESAPEAKE APPALACHIA LLC | Other Oil & Gas Wastes | 50.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NC008 |
2018 | CHESAPEAKE APPALACHIA LLC | Waste Water Treatment Sludge | 0.40 Tons | LANDFILL | 301626 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1880300 | Primary Facility | 2010-04-14 | Routine/Complete Inspection | No Violations Noted | |
1955193 | Primary Facility | 2011-03-03 | Routine/Complete Inspection | Violation(s) Noted | Significant bubbling in cellar / uncontrolled release of gas. 80% combustible gas reading off of annuli. Well located right off of Rt 187. Immediate attention needed. |
1960337 | Primary Facility | 2011-03-11 | Routine/Complete Inspection | No Violations Noted | 20" - 50' |
1964452 | Primary Facility | 2011-04-08 | Follow-up Inspection | Violation(s) Noted | Significant bubbling in cellar. Uncontrolled release of gas. Well shut in for 24 hours by EFS. All gauges pulled. Bubbling outside of 20" conductor and between 13 3/8 and 20" annuli. |
1976897 | Primary Facility | 2011-05-18 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Methane vented to tank. No vent on 13 5/8 vent port. No visible bubbling in cellar. |
1987626 | Primary Facility | 2011-07-13 | Routine/Complete Inspection | Violation(s) Noted | 13 3/8 x 9 5/8 - 98% combustible gas. 9 5/8 x 5 1/2 - 30% combustible gas. Significant bubbling in cellar. |
2001689 | Primary Facility | 2011-08-25 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | 100% combustible gas off of 13 3/8. 10% comb gas off of 9 5/8. Bubbles in cellar. Not vented to tank. |
2020669 | Primary Facility | 2011-10-11 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Met with CHK personnel to get samples and to preform flow test. This well is fract but plugs not drilled out. Utilizing U type manometer and Miriam Inst Model 10AA25WM and 1/4" orifice. 15# range. |
2020675 | Primary Facility | 2011-11-18 | Routine/Complete Inspection | No Violations Noted | Workover rig on location. Snubbing unit arrived on 11/16/11. Currently drilling out fract plugs and doing completion operations. Will run 2 7/8 with packer into production string with wireline instead of snubbing unit due to high pressure. |
2022682 | Primary Facility | 2011-11-22 | Routine/Complete Inspection | No Violations Noted | Sett RBP at 2665' Well is perforated from 2555 to 2557'. Waiting on Schulumberger to perform squeeze job. Once cemented, CHK will allow to cure for a least 5 days. will then was-out, pump, drill out and test. |
2022683 | Primary Facility | 2011-11-23 | Routine/Complete Inspection | No Violations Noted | Workover rig off location. Waiting for cement to cure from perf and squeeze. |
2022685 | Primary Facility | 2011-11-29 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Crews onsite digging out cellar. Plan on digging down approx 43". Visible bubbling in cellar between conductor and cellar wall. |
2024130 | Primary Facility | 2011-12-03 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Crews onsite continuing to dig out cellar to expose fabricated cap so that it can be removed. This AM the 9 5/8 annulus built up 500# pressure so vent lines were hooked up to vent to tanks so that workers could continue to safely work around wellhead. |
2024139 | Primary Facility | 2011-12-05 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Cellar dug out and fabricated cap exposed so that it can be removed. Crew onsite removing lines from 9 5/8 annulus to tanks. 500# psi still on 9 5/8. Cellar pumped down. |
2029929 | Primary Facility | 2011-12-27 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | uncontrolled annular flow as noted in earlier violations |
2030201 | Primary Facility | 2011-12-28 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Gas was flowing around the entire circumference of the well head which was submerged in water. The vent on the 5 ½ x 9 5/8 were open. 0 psi on gauges. |
2032616 | Primary Facility | 2012-01-09 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Rig set up on adjacent well no remidiation work being done on 2-h , cellar dry cap has not been repaired at this time nor has well been vented |
2032629 | Primary Facility | 2012-01-05 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | strong flow of gas around entire csing circumfrance , no remidiation being performed at this time. |
2033420 | Primary Facility | 2012-01-11 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | no activity being done on this well ,rig on next well 5-h drilling out frac plugs |
2049356 | Primary Facility | 2012-03-05 | Drilling/Alteration | Outstanding Violations - No Viols Req'd | Workover rig onsite. Crews onsite monitoring pressures. |
2063649 | Primary Facility | 2012-03-12 | Routine/Complete Inspection | No Violations Noted | Fab cap 13 3/8 - 0 psi on gauge. 0% combustible gas |
2098727 | Primary Facility | 2012-07-05 | Routine/Complete Inspection | No Violations Noted | Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, .5% combustible gas off of vent |
2098730 | Primary Facility | 2012-08-16 | Routine/Complete Inspection | No Violations Noted | Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 2% spike of combustible gas off of vent. Meter holds at 1.5% combustible gas |
2098733 | Primary Facility | 2012-08-22 | Routine/Complete Inspection | No Violations Noted | Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 1% combustible gas off of vent. |
2098737 | Primary Facility | 2012-08-27 | Routine/Complete Inspection | No Violations Noted | Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 2% combustible gas off of vent. Meter holds at 1.5% combustible gas |
2098738 | Primary Facility | 2012-09-05 | Routine/Complete Inspection | No Violations Noted | Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 1% combustible gas off of vent. Meter holds at .5% combustible gas |
2098740 | Primary Facility | 2012-09-10 | Routine/Complete Inspection | No Violations Noted | Fabricated Surface cap (20X13) casing pressure - gauge reads 0 psi, 2% combustible gas off of vent. Meter holds at 1% combustible gas |
2120030 | Primary Facility | 2012-10-10 | Routine/Complete Inspection | No Violations Noted | Back pressure vavle installed. Performing 48 hour shut-in tests. Well currently shut-in. Fab cap - 0 psi. 9 5/8 - 0 psi (pop-off valve installed). 5 1/2 - 10 psi. |
2120679 | Primary Facility | 2012-10-03 | Routine/Complete Inspection | No Violations Noted | 0 psi on fabricated surface cap (13 x 20) - .5%spike combustible gas, .2%hold |
2120687 | Primary Facility | 2012-09-25 | Routine/Complete Inspection | No Violations Noted | Fabricated surface cap (13 X 20) - 0 psi (vented) - 1 % spike, .5% hold combustible gas |
2194581 | Primary Facility | 2013-08-02 | Routine/Complete Inspection | Pending | Inspection is for 'Inactive Well Status' application. |
2203360 | Primary Facility | 2013-09-04 | Routine/Complete Inspection | No Violations Noted | |
2239231 | Primary Facility | 2014-01-13 | Routine/Complete Inspection | No Violations Noted | |
2259239 | Primary Facility | 2014-04-02 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | Open violations associated with NOV dated 8/29/2011 remain - combustible gas detected outside Surface casing. |
2265005 | Primary Facility | 2014-04-17 | Routine/Complete Inspection | Violation(s) Noted | Gas detected outside surface casing: 78.73(b) - General provision for well construction and operation; 78.85(a)(5) - Cement standards. |
2374248 | Primary Facility | 2015-05-28 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | |
2378451 | Primary Facility | 2015-06-12 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | |
2493910 | Primary Facility | 2016-06-16 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | At time of inspection, arrived on site at 9:30a.m. On site to conclude the 72 hr. Pressure Build-up Test (PBUT) being performed on the 5H and the 2H as part of an ongoing migration investigation. I was accompanied by Eric Rooney (DEP Geologist), we met with Joel Mincer (lease operator for Chesapeake) and Tom Messing of Leidos. The wells were shut in on 6/13/16 at 10:15a.m. It was noticed that the pop off valves were still on the (28x20), (20x13¿), and (13¿x9¿) vent pipes on the 2H and on the (28x20) and (20x13¿) vent pipes on the 5H.
Tom called Charlie Olmsted of Chesapeake to let him know of the pop off valves and Charlie said the PBUT would be rescheduled for sometime in July. No gas samples or pressure reading were taken. I left the site at 10:50a.m. |
2502271 | Primary Facility | 2016-07-18 | Routine/Complete Inspection | Outstanding Violations - No Viols Req'd | At time of inspection, arrived on site at 13:10p.m. for a post 72hr pressure build up test (PBUT), the cellar was empty, I met with lease operators Joel Mincer and Joel Failie. They were setting up the wells for the 72hr PBUT, Joel Mincer had to go to the shop to get some connections, he returned about 15:00p.m. The production line was shut in at 15:30p.m. and the other annuli’s were shut in and set up with a digital recorder at 5:26p.m. The vent pipes from the 28" and 20" caps were set up with a 15lb pop off valve and they had a hose going to a plastic tank.
I left the site at 5:30p.m. |
2503856 | Primary Facility | 2016-07-21 | Follow-up Inspection | Outstanding Violations - No Viols Req'd | At time of inspection, arrived on site at 16:10p.m. to conclude the 72hr. Pressure Build-up Test (PBUT) being performed on the 2H and the 5H as part of an ongoing migration investigation. The cellar had water at the bottom with no bubbling noticed. I met with Joel Mincer (lease operator for Chesapeake), Tom Messing and Shauna Erway of Leidos. The wells were shut in on 7/18/16 at 17:26,Tom used a Gas Explorer gas meter by Bascom Turner calibrated on 7/21/16 to check for gas show at all annuli’s, gas samples were taken if gas was detected. Pressures were taken from a 30psi pressure gauge for the 28" and 20" annuli’s, and from the SCADA digital pressure gauges on the wells for the rest of the annuli’s. The 28" and 20" annuli’s were set up with 15psi pop off valves and connected to poly tanks, there was no gas detected at the tanks. We started taking pressures at 17:25 on the 5H.
I left the site at 18:30p.m. |
2575953 | Primary Facility | 2017-03-20 | Routine/Complete Inspection | No Violations Noted | On March 20, 2017, the Department conducted a routine inspection at the Chesapeake Appalachia, LLC (Chesapeake) Rexford Location in Orwell Township, Bradford County. Andrew Hobbins, Water Quality Specialist, represented the Department. Nobody was present for Chesapeake.
The E&S plan, site sign and weekly inspection reports were on site and available for review. The site was mostly covered in about 8 inches of snow. PCSM has not been addressed at the site. There were two well in production phase during the inspection. Both wells were labeled and no bubbling was observed in the well cellar. Two production tanks and two GPUs were on site. The production tanks were on secondary containment. The ESGGP-2 permit expires 1/11/2021. A major modification was approved on January 12, 2016 to address PCSM. According to Department records, there are no active well permits for the Rexford Location. The well pad retains its original shape and has not been reduced in size. The Department recommends installi |
2591650 | Primary Facility | 2017-05-08 | Routine/Complete Inspection | Outstanding Violations - Viols Req'd | At time of inspection, arrived on site at 12:00p.m. for a pre-PBUT inspection.
The cellar was about three quarters full of water with no bubbling noticed. The (28x20) annulus was set up with a pop off valve and a 60psi pressure gauge with 0psi on it. The (20x13) annulus was set up with a digital recorder and a 60psi pressure gauge with 0psi on it. The (13x9) annulus was set up with a SCADA digital pressure gauge with 0psi on it and the valve going to the production tank was closed. The (9x5) annulus was set up with a SCADA digital pressure gauge with 12psi on it and the valve going to the production tank was closed. The 5½ production casing was open and venting to the production tank with 0psi on the SCADA pressure gauge. There was 858psi on the production tubing. I left the site at 13:05 p.m. |
2593884 | Primary Facility | 2017-05-11 | Follow-up Inspection | Outstanding Violations - Viols Req'd | At time of inspection, arrived on site at 8:00a.m. to conclude the 72hr. Pressure Build-up Test (PBUT) being performed on the 2H and the 5H as part of an ongoing migration investigation. The cellar was about half full of water with no bubbling noticed. I met with Joel Fairlie of Chesapeake, Tom Messing and Shauna Erway of Leidos. The wells were shut in on 5/8/17 at 8:15a.m. Tom used a Gas Explorer gas meter by Bascom Turner to check for gas show at all annuli’s, gas samples were taken if gas was detected. Pressures were taken from SSI Technology Inc. pressure gauge for the 28" and 20" annuli’s, and from the SCADA digital pressure gauges on the wells for the rest of the annuli’s. The wells were still producing.
We started taking pressures at 8:20a.m. on the 5H. I left the site at 9:15a.m. |
2756116 | Primary Facility | 2018-07-11 | Routine/Complete Inspection | Outstanding Violations - Viols Req'd | Remarks: At time of inspection. On site to check for gas presence, gas flows and take samples from the annuli of the 2H and 5H wells. I was accompanied by DEP OGI Supervisor, Mike Panettieri and DEP OGI, David Schoonover. We met with Chesapeake Reps. Max Goff (Operations Engineer), Lester Peterson (Optimization Technician), Joe Riley (Well Tender) and Leidos Rep. Tom Messing.
- Lester used an Eco meter to check the fluid level in the (9x5) and (5/Prod) annuli on 7/5/18. Tom used a Gas Explorer gas meter (calibrated on 7/10/18) to check for gas shows at annuli and I used an Altair 5X gas meter (calibrated on 7/9/18) to confirm the results. Joe used a Digital Manometer 621 with a 1/4" orifice to check for any flow rates at annuli. There were no measurable gas flow rates detected at any annuli, cemented to surface, of the 2H or 5H wells at time of inspection. Both wells (28"x 20"), (20"x 13 3/8") and (13 3/8"x 9 5/8") annuli had been open and venting for several weeks prior to this inspection. The results of |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1955193 | 606032 | 03/03/2011 | 2011-03-03 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | |
1964452 | 608448 | 04/08/2011 | 2011-04-08 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | |
1987626 | 615253 | 07/13/2011 | 2011-07-13 | 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days | Administrative | |
1987626 | 615254 | 07/13/2011 | 2011-07-13 | 78.84 - Insufficient casing strength, thickness, and installation equipment | Administrative | |
2265005 | 694207 | 04/17/2014 | 2014-04-17 | 78.73B - Excessive casing seat pressure | Administrative | |
2265005 | 694208 | 04/17/2014 | 2014-04-17 | 78.85 - Inadequate, insufficient, and/or improperly installed cement | Environmental Health & Safety | |
2591650 | 785120 | 2017-05-08 | 78.85(a)5 | Environmental Health & Safety | ||
2591650 | 785121 | 2017-05-08 | 78a86 | Environmental Health & Safety | ||
2593884 | 785657 | 2017-05-11 | 78a85(a)5 | Environmental Health & Safety | ||
2593884 | 785658 | 2017-05-11 | 78a86 | Environmental Health & Safety | ||
2756116 | 823280 | 2017-05-08 | 78.85(a)5 | Environmental Health & Safety | Originally cited on 5/8/2017. No gas flows were noted in cemented annuli of the 2H well at time of this inspection. | |
2756116 | 823281 | 2011-03-03 | 78a86 | Environmental Health & Safety | Originally cited on 3/3/2011. Operator performed remedial work on the 2H well between 11/22/11 - 2/28/12. (See attached well bore diagram for details). No gas flows were noted in the cemented annuli of the 2H well at time of this inspection. | |
2756116 | 823282 | 2014-04-17 | 78.73(b) | Environmental Health & Safety | Originally cited in error as "78.73B" on 4/17/14. |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
606032 | 275910 | NOV - Notice of Violation | |||||
608448 | 275910 | NOV - Notice of Violation | |||||
615253 | 275910 | NOV - Notice of Violation | |||||
615254 | 275910 | NOV - Notice of Violation | |||||
694207 | 310434 | NOV - Notice of Violation | |||||
694208 | 310434 | NOV - Notice of Violation |
For data sources see[7]