37-015-22138

Well Details

Well ID: 37-015-22138
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Wilmot Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 145742
Farm/Lease Name: MESSERSMITH S BRA 1H
License Status:
Spud Date:
Permit Date: 2012-03-01
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.563969
Longitude: -76.3205

For data sources see[1][2][3]

Well History

Date Event
2012-03-01 New Permit Application
2012-04-10 Performed Spud Operation
2012-07-25 Perforation
2012-12-06 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-08-02 2012-08-02 8,578 4,956,000

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water Carrier/Base Fluid 16.41
J609 Schlumberger Friction Reducer Ammonium sulfate 7783-20-2 30.00 0.02
Aliphatic amine polymer 30.00 0.02
Acid, Hydrochloric 15pct Schlumberger Acid Water 7732-18-5 85.00 0.23
Hydrochloric acid 7647-01-0 15.00 0.04
B-84 X-Chem Antibacterial Agent Glutaraldehyde 111-30-8 27.00 0.00745000
L058 Schlumberger Iron Control Agent Sodium erythorbate 6381-77-7 100.00 0.00019000
Ottawa Sand Proppant Quartz 14808-60-7 100.00 12.07
Ethanol
SC30W X-Chem Scale Inhibitor Sodium polyacrylate 9003-04-7 100.00 0.00911000
Sodium hydroxide 1310-73-2 100.00 0.00911000
Methanol 67-56-1 100.00 0.00911000
Fresh Water Carrier/Base Fluid 69.77
A264 Corrosion Inhibitor Schlumberger Corrosion Inhibitor Aliphatic acid 30.00 0.00011000
Aliphatic alcohols, ethoxylated # 1 30.00 0.00011000
Propargyl alcohol 107-19-7 10.00 0.00004000
Methanol 67-56-1 40.00 0.00015000
100 Mesh Sand Proppant Quartz 14808-60-7 100.00 1.32
Quaternary Ammonium Compound

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHESAPEAKE APPALACHIA LLC 493,928.00 60 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 3,261,775.00 365 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 1,969,360.00 328 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 1,497,779.00 340 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 1,307,430.00 294 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 1,167,096.00 360 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 1,002,775.00 365 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 883,474.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHESAPEAKE APPALACHIA LLC Drill Cuttings 636.06 Tons LANDFILL THR029
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 3,894.62 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 1,486.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,675.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 732.02 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 350.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 289.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 240.00 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 14.08 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 107.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 215.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2062400 Primary Facility 2012-04-10 Drilling/Alteration No Violations Noted United Drilling truck on site. Didn't start drilling yet.
2067869 Primary Facility 2012-05-15 Routine/Complete Inspection Violation(s) Noted Spud date for site is 4/10/2012.
2074910 Primary Facility 2012-06-11 Administrative/File Review No Violations Noted Received response detailing corrective measures employed to address violation.
2078677 Primary Facility 2012-06-22 Drilling/Alteration No Violations Noted NOMAC 42, Comp. Man - James Cleary, Drilling @ 4477'
2084508 Primary Facility 2012-07-16 Drilling/Alteration No Violations Noted Rig has moved off. Still moving some equip and cleaning. Small amount of water in cellar - no bubbles visible.
2208554 Primary Facility 2013-09-27 Routine/Complete Inspection No Violations Noted
2259517 Primary Facility 2014-03-26 Routine/Complete Inspection No Violations Noted
2296543 Primary Facility 2014-08-15 Routine/Complete Inspection No Violations Noted
2353439 Primary Facility 2015-03-19 Routine/Complete Inspection No Violations Noted
2485281 Primary Facility 2016-05-17 Routine/Complete Inspection No Violations Noted Vegetative cover on site is greater than 70% and consists of perennial plant species. Temporary erosion and sediment control BMPs have been removed along the access road but are still in place along the toe of the pad fill slope. No evidence of accelerated erosion or sedimentation was observed.

Well permit 015-22138 expired on 03/01/2013. The Erosion and Sediment Control General Permit expires on 01/17/2017. Title 58 Pa. C.S. § 3216 (relating to site restoration)(2012 Oil and Gas Act), requires well sites to be restored within 9 months of completion of well drilling. According to the Department's records, no new well permit is pending and no request for a 2-year extension of time for site restoration has been requested. In order to remain in compliance with the Department's restoration requirements, a new well permit should be obtained or an extension of time for site restoration should be requested.

No violations were cited during this inspection.

2558310 Primary Facility 2017-02-02 Routine/Complete Inspection No Violations Noted Routine inspection to assess overall site conditions. No Chesapeake representatives present.

Vegetative cover on site is greater than 70% and consists of perennial plant species. Temporary erosion and sediment control BMPs have been removed along the access road but are still in place along the toe of the pad fill slope. No evidence of accelerated erosion or sedimentation was observed.

According to the Department of Environmental Portection's records, no new well permit is pending and no request for a 2-year extension of time for site restoration has been requested. In order to remain in compliance with the regulations pertaining to site restoration (Section 3216 of the 2012 Oil and Gas Act and 15 Pa. Code Section 78a.65) a new well permit should be obtained or an extension of time for site restoration should be requested.

No violations were cited during this inspection.

2679281 Primary Facility 2018-01-08 Routine/Complete Inspection No Violations Noted One well in production phase. One each sand and water separator. No leaks detected from production equipment. No violations noted.
2701735 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted ,Arrived at 12:00. Weather: cloudy, cold light snow on the ground. 1 producing well on a 3 slot set-up. Cellar full of water and ice. Top gauge: 966.4 psi, 13-3/8" x 9-5/8": open to dump line 10.10 psi. Left at 12:30. No violations observed during this inspection.
2771306 Primary Facility 2018-09-06 Site Restoration No Violations Noted One well staged for production phase. One each sand and water separator. No leaks detected from production equipment. No violations noted. The Operator states the well site is sized appropriately for safe operation.

The eSubmission Post Drilling Site Restoration Report was submitted to the DEP on 9/4/2018. Based on this inspection the Post Drilling Restoration report was accepted on 9/6/2018.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2067869 639447 05/15/2012 2012-05-15 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Runoff along access road has channelled under CFS-2 in two areas. One completely under area when sock was installed. Water flows across road and through CDC-1. Sediment-laden water discharging from cross culvert and off LOD.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
639447 284039 NOV - Notice of Violation Administrative Close Out 2012-06-11

For data sources see[8]

References