X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-22267

Well Details

Well ID: 37-015-22267
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Terry Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148328
Farm/Lease Name: FERRARO NW BRA 4H
License Status:
Spud Date:
Permit Date: 2012-09-06
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.613458
Longitude: -76.3367

For data sources see[1][2][3]

Well History

Date Event
2012-09-06 New Permit Application
2012-09-27 Performed Spud Operation
2013-04-01 Perforation
2014-01-24 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-04-11 2013-04-17 7,670 5,711,540 363,619

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SFR-470 X CHEM Friction Reducer Alcohol ethoxylate C-10/16 with 6.5 EO 068002-97-1 5 0.00156 0
Petroleum Distillate Hydrotreated Light 064742-47-8 35 0.01093 0
Ethoxylated Alcohol 068439-50-9 5 0.00156 0
Quaternary Ammonium Chloride (Ammonium Chloride) 012125-02-9 15 0.00468 0
Alcohols ethoxylated C12-16 068551-12-2 5 0.00156 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 9.66112 0
B84 X CHEM Anti-Bacterial Agent Didecyl Dimethyl Ammonium Chloride 007173-51-5 8 0.00224 0
Quaternary Ammonium Compound 068424-85-1 6 0.00154 0
Ethanol 000064-17-5 4 0.00112 0
Glutaraldehyde (Pentanediol) 000111-30-8 27 0.00758 0
Plexhib 256 PUMPCO Corrosion Inhibitor Alkenes^ C>10 alpha- 064743-02-8 5 0.00002000 0
Methanol (Methyl Alcohol) 000067-56-1 60 0.00028 0
Ethoxylated Alcohols^ C14-15 068951-67-7 30 0.00014 0
Modified Thiourea Polymer 068527-49-1 30 0.00014 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00005000 0
Brown Sand PUMPCO Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 12.1258 0
SC30 X CHEM Scale Inhibitor Sodium Polyacrylate 009003-04-7 100 0.0092 0
SFR-451 X CHEM Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 35 0.01149 0
Ammonium Acetate 000631-61-8 6 0.00197 0
100 Mesh Sand PUMPCO Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.29585 0
Acid HCL PUMPCO Acid Hydrochloric Acid 007647-01-0 15 0.04678 0
Water 007732-18-5 85 0.26507 0
Plexbreak 145 PUMPCO Non-Emulsifier Diethanolamine 000111-42-2 2 0.00001000 0
Water 007732-18-5 65 0.00034 0
Methanol (Methyl Alcohol) 000067-56-1 15 0.00008000 0
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) 000111-76-2 15 0.00008000 0
Coconut oil, Diethanolamide 068603-42-9 10 0.00005000 0
Ferriplex 40 PUMPCO Iron Control Agent Sodium Hydroxide 001310-73-2 1 0.00002000 0
Sodium Sulfate 007757-82-6 2 0.00004000 0
Trisodium Nitrilotriacetate 005064-31-3 40 0.00075 0
Water 007732-18-5 60 0.00112 0
B84, SC30, SFR-451, SFR-470 X CHEM Anti-Bacterial Agent, Friction Reducer, Scale Inhibitor Alcohol ethoxylate C-10/16 with 6.5 EO 068002-97-1 0 0.03033 0
Proprietary Surfactant TRADE SECRET 0 0.05557 0
Alcohols, C12-C14-Secondary, Ethoxylated 084133-50-6 0 0.02524 0
Alcohols ethoxylated C12-16 068551-12-2 0 0.03033 0
Polyacrylamide (Acrylamide, Ammonium Acrylate Copolymer) 026100-47-0 0 0.02524 0
Ethoxylated Alcohol 068439-50-9 0 0.03033 0
Sorbitol Tetraoleate 061723-83-9 0 0.02524 0
Polyethylene Glycol Monooleate 009004-96-0 0 0.02524 0
Water 007732-18-5 0 0.09861 0
Sorbitan Monooleate 001338-43-8 0 0.05557 0
Ethoxylated Oleylamine 026635-93-8 0 0.03033 0
Polypropenamide 910644-97-2 0 0.03033 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 76.5013 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 1,252,774.00 118 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 2,398,209.00 364 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 1,476,946.00 365 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 1,403,955.00 366 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 1,102,905.00 365 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 923,011.00 359 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 770,504.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 CHESAPEAKE APPALACHIA LLC Produced Fluid 54.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Drilling Fluid Waste 971.62 Bbl REUSE OTHER THAN ROAD SPREADING
2012 CHESAPEAKE APPALACHIA LLC Drill Cuttings 989.73 Tons LANDFILL THR029
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 6,863.83 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CHESAPEAKE APPALACHIA LLC Fracing Fluid Waste 20.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2013 CHESAPEAKE APPALACHIA LLC Produced Fluid 138.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC007
2014 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,036.69 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CHESAPEAKE APPALACHIA LLC Produced Fluid 277.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 306.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CHESAPEAKE APPALACHIA LLC Produced Fluid 144.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 81.00 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 102.00 Bbl REUSE (AT WELL PAD)
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 0.15 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 26.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2103160 Primary Facility 2012-09-27 Drilling/Alteration No Violations Noted United drilling on site doing conductor. Just finished mousehole, starting on cond.
2104496 Primary Facility 2012-10-02 Drilling/Alteration No Violations Noted NOMAC 44, Comp. Man - Dan Woody, @ 1085'
2106024 Primary Facility 2012-10-09 Drilling/Alteration No Violations Noted Nomac 44, Comp. Man - Dan Woody, @ 7148', drilling curve, on OBM, switched yesterday
2110034 Primary Facility 2012-10-19 Drilling/Alteration Pending Rig has moved off. Crew is picking up mats. Some tanks still on site.
2112187 Primary Facility 2012-10-26 Follow-up Inspection No Violations Noted Site has been cleaned up. Still 1 pile of mats on location. No bubbles in cellatr.
2465580 Primary Facility 2016-03-17 Routine/Complete Inspection No Violations Noted
2551819 Primary Facility 2017-01-12 Routine/Complete Inspection No Violations Noted Two Wells in production phase. Two each sand and water separators. Two production tanks within containment. No leaks detected. No violations noted.
2688300 Primary Facility 2018-01-30 Routine/Complete Inspection No Violations Noted Two wells staged for production phase. Two each sand and water separators. No leaks detected from production equipment. No violations noted.
2850811 Primary Facility 2019-03-08 Routine/Complete Inspection No Violations Noted Arrived onsite for a routine inspection at 11:29; the weather was ~33°F, calm, and overcast. The gate was open when I arrived and a well tender and and construction crew onsite putting up a building for a compressor already onsite.

There were properly tagged Marcellus wells staged for production. A total of 3 cellars were onsite; no bubbling was observed. There were 2 GPUs, sand separators, and produced water tanks onsite. A compressor was also onsite but was not running.

Some areas around the pad were snow covered but the majority of the site was clear and appeared stable and well vegetated. A section of the stream bank at the culvert crossing along the access road showed signs of errosion (Photo #4). At the time of inspection no PCSM BMPs were noted.

It is recommended that, if the pad meets restoration criteria, PCSM has been addressed, the site has been permanently stabilized, and it is appropriate to do so, an NOT and well site restoration report be submitted for review as needed.

No violations wer

For data sources see[8]

References