X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-015-23135

Well Details

Well ID: 37-015-23135
Loading map...
Country: United States
State: Pennsylvania
County: Bradford
Municipality: Monroe Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 149727
Farm/Lease Name: LUCY N BRA
License Status: Active
Spud Date:
Permit Date: 2014-10-07
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.696347
Longitude: -76.479019

For data sources see[1][2][3]

Well History

Date Event
2014-10-07 New Permit Application
2014-10-13 Performed Spud Operation
2016-05-10 Inactive Well Request Granted
2017-10-14 Perforation
2018-03-31 Perforation
2018-03-31 Performed Stage 1 of Stimulation
2018-03-31 Performed Stage 2 of Stimulation
2018-04-01 Perforation
2018-04-01 Performed Stage 3 of Stimulation
2018-04-01 Performed Stage 4 of Stimulation
2018-04-01 Performed Stage 5 of Stimulation
2018-04-01 Performed Stage 6 of Stimulation
2018-04-01 Performed Stage 7 of Stimulation
2018-04-01 Performed Stage 8 of Stimulation
2018-04-01 Performed Stage 9 of Stimulation
2018-04-02 Perforation
2018-04-02 Performed Stage 10 of Stimulation
2018-04-02 Performed Stage 11 of Stimulation
2018-04-02 Performed Stage 12 of Stimulation
2018-04-02 Performed Stage 13 of Stimulation
2018-04-02 Performed Stage 14 of Stimulation
2018-04-02 Performed Stage 15 of Stimulation
2018-04-02 Performed Stage 16 of Stimulation
2018-04-03 Perforation
2018-04-03 Performed Stage 17 of Stimulation
2018-04-03 Performed Stage 18 of Stimulation
2018-04-03 Performed Stage 19 of Stimulation
2018-04-03 Performed Stage 20 of Stimulation
2018-04-03 Performed Stage 21 of Stimulation
2018-04-03 Performed Stage 22 of Stimulation
2018-04-03 Performed Stage 23 of Stimulation
2018-04-04 Perforation
2018-04-04 Performed Stage 24 of Stimulation
2018-04-04 Performed Stage 25 of Stimulation
2018-04-04 Performed Stage 26 of Stimulation
2018-04-04 Performed Stage 27 of Stimulation
2018-04-04 Performed Stage 28 of Stimulation
2018-04-05 Perforation
2018-04-05 Performed Stage 29 of Stimulation
2018-04-05 Performed Stage 30 of Stimulation
2018-04-05 Performed Stage 31 of Stimulation
2018-04-06 Perforation
2018-04-06 Performed Stage 32 of Stimulation
2018-04-06 Performed Stage 33 of Stimulation
2018-04-06 Performed Stage 34 of Stimulation
2018-04-07 Perforation
2018-04-07 Performed Stage 35 of Stimulation
2018-04-07 Performed Stage 36 of Stimulation
2018-04-07 Performed Stage 37 of Stimulation
2018-04-07 Performed Stage 38 of Stimulation
2018-04-07 Performed Stage 39 of Stimulation
2018-04-07 Performed Stage 40 of Stimulation
2018-04-07 Performed Stage 41 of Stimulation
2018-04-08 Perforation
2018-04-08 Performed Stage 42 of Stimulation
2018-04-08 Performed Stage 43 of Stimulation
2018-04-08 Performed Stage 44 of Stimulation
2018-04-08 Performed Stage 45 of Stimulation
2018-04-08 Performed Stage 46 of Stimulation
2018-04-08 Performed Stage 47 of Stimulation
2018-04-08 Performed Stage 48 of Stimulation
2018-04-08 Performed Stage 49 of Stimulation
2018-04-09 Perforation
2018-04-09 Performed Stage 50 of Stimulation
2018-04-09 Performed Stage 51 of Stimulation
2019-06-24 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-31 2018-04-09 7,337 18,841,400 740,037

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HCL10.1 - 15 BJ SERVICES Acid Hydrochloric Acid 007647-01-0 0.15 0.00033 0
Water 007732-18-5 0.85 0.00188 0
Northern White Sand BJ SERVICES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 1 0.12614 0
FracCare SI720 BJ SERVICES Scale Inhibitor Diethylene Glycol 000111-46-6 0.05 0.00001000 0
Ethylene Glycol 000107-21-1 0.35 0.00007000 0
ResCare IC 300L BJ SERVICES Iron Control Agent Citric Acid 000077-92-9 0.5 0.00007000 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.69016 0
CI-14 BJ SERVICES Corrosion Inhibitor Proprietary Fatty Acids Trade Secret 0.1 0 0
Proprietary Olefin Trade Secret 0.05 0 0
Methanol (Methyl Alcohol) 000067-56-1 0.7 0.00002000 0
Proprietary Polyoxyalkylenes Trade Secret 0.2 0.00001000 0
Propargyl Alcohol (2-Propynol) 000107-19-7 0.05 0 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 0.01 0 0
HCL 5.1 - 7.5 BJ SERVICES Acid Water 007732-18-5 0.93 0.0146 0
Hydrochloric Acid 007647-01-0 0.08 0.00118 0
ThinFrac MP I BJ SERVICES Friction Reducer Sodium Chloride 7647-14-5 0.05 0.00004000 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 0.3 0.00027 0
Oxyalkylated alcohol Trade Secret 0.05 0.00004000 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.16442 0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2018-03-31 1 Northern White Sand 4,200 8,964 9,189
2018-03-31 2 Northern White Sand 4,200 8,784 9,045
2018-04-01 3 Northern White Sand 4,200 8,502 9,029
2018-04-01 4 Northern White Sand 4,200 8,462 9,019
2018-04-01 5 Northern White Sand 4,200 8,990 9,223
2018-04-01 6 Northern White Sand 4,200 9,050 9,330
2018-04-01 7 Northern White Sand 4,200 8,904 9,296
2018-04-01 8 Northern White Sand 4,200 8,751 9,141
2018-04-01 9 Northern White Sand 4,200 8,513 9,149
2018-04-02 10 Northern White Sand 4,200 8,294 9,050
2018-04-02 11 Northern White Sand 4,200 8,710 9,325
2018-04-02 12 Northern White Sand 4,200 9,053 9,299
2018-04-02 13 Northern White Sand 4,200 8,595 9,319
2018-04-02 14 Northern White Sand 4,200 8,569 9,353
2018-04-02 15 Northern White Sand 4,200 8,585 9,263
2018-04-02 16 Northern White Sand 4,200 8,461 9,130
2018-04-03 17 Northern White Sand 4,200 8,207 9,147
2018-04-03 18 Northern White Sand 4,200 8,306 9,058
2018-04-03 19 Northern White Sand 4,200 8,622 9,319
2018-04-03 20 Northern White Sand 4,200 9,055 9,331
2018-04-03 21 Northern White Sand 4,200 8,577 9,285
2018-04-03 22 Northern White Sand 4,200 8,927 9,199
2018-04-03 23 Northern White Sand 4,200 8,801 9,213
2018-04-04 24 Northern White Sand 4,200 8,609 9,068
2018-04-04 25 Northern White Sand 4,200 8,305 8,855
2018-04-04 26 Northern White Sand 4,200 9,064 9,283
2018-04-04 27 Northern White Sand 4,200 9,014 9,327
2018-04-04 28 Northern White Sand 4,200 8,621 9,308
2018-04-05 29 Northern White Sand 4,200 8,574 9,178
2018-04-05 30 Northern White Sand 4,200 8,864 9,350
2018-04-05 31 Northern White Sand 4,200 8,870 9,378
2018-04-06 32 Northern White Sand 4,200 8,559 9,171
2018-04-06 33 Northern White Sand 4,200 8,931 9,316
2018-04-06 34 Northern White Sand 4,200 7,777 8,263
2018-04-07 35 Northern White Sand 4,200 7,308 7,890
2018-04-07 36 Northern White Sand 4,200 7,399 7,877
2018-04-07 37 Northern White Sand 4,200 8,919 9,270
2018-04-07 38 Northern White Sand 4,200 8,806 9,341
2018-04-07 39 Northern White Sand 4,200 8,617 9,179
2018-04-07 40 Northern White Sand 4,200 8,203 9,378
2018-04-07 41 Northern White Sand 4,200 8,391 8,936
2018-04-08 42 Northern White Sand 4,200 7,319 8,037
2018-04-08 43 Northern White Sand 4,200 7,772 8,681
2018-04-08 44 Northern White Sand 4,200 8,506 9,325
2018-04-08 45 Northern White Sand 4,200 8,490 9,082
2018-04-08 46 Northern White Sand 4,200 8,262 9,336
2018-04-08 47 Northern White Sand 4,200 8,671 9,382
2018-04-08 48 Northern White Sand 4,200 7,137 8,156
2018-04-08 49 Northern White Sand 4,200 7,432 8,621
2018-04-09 50 Northern White Sand 4,200 7,309 8,368
2018-04-09 51 Northern White Sand 4,200 7,967 8,291

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 2,926,538.00 219 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 3,046,789.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 CHESAPEAKE APPALACHIA LLC Drill Cuttings 398.20 Tons LANDFILL 8-4630-00010/00
2014 CHESAPEAKE APPALACHIA LLC Drill Cuttings 356.14 Tons RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR097R017
2014 CHESAPEAKE APPALACHIA LLC Drill Cuttings 51.50 Tons LANDFILL THR029
2014 CHESAPEAKE APPALACHIA LLC Drill Cuttings 339.33 Tons LANDFILL 8-0728-0004/013
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 212.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2017 CHESAPEAKE APPALACHIA LLC Produced Fluid 50.00 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 137.61 Tons LANDFILL 301626
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 0.50 Tons LANDFILL 8-0728-0004/013
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 75.00 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 1.10 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 2,409.00 Bbl REUSE (AT WELL PAD)
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 2,501.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 435.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 104.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 CHESAPEAKE APPALACHIA LLC Other Oil & Gas Wastes 869.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018 CHESAPEAKE APPALACHIA LLC Synthetic Liner Materials 1.10 Tons CENT WASTE TRT FAC NPDES PAG034815
2018 CHESAPEAKE APPALACHIA LLC Produced Fluid 1,489.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CHESAPEAKE APPALACHIA LLC Waste Water Treatment Sludge 0.29 Tons LANDFILL 301626
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE003
2019 CHESAPEAKE APPALACHIA LLC Produced Fluid 325.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2333461 Primary Facility 2014-12-17 Routine/Complete Inspection No Violations Noted Nomac Drilling Rig #44 is the active drilling rig on the location. I met with Dan Woody, Company Man and consultant of Chesapeake. The Lucy Bra 7H well has been drilled to a total depth of (14,993.22) feet. Chesapeake is in the process of installing production casing. The ground surface of the site is very muddy due to the recent rainfall event and snowmelt. There is quite bit of standing water on and off secondary containment. The standing water will be removed via a vacuum truck in the near future according to Mr. Woody. Rig mats and New Pig Liner is used as secondary containment for the drilling rig and associated equipment. Overall, the containment at the location appeared to be in good condition.
2450153 Primary Facility 2016-02-17 Routine/Complete Inspection No Violations Noted
2468543 Primary Facility 2016-03-29 Routine/Complete Inspection No Violations Noted
2647079 Primary Facility 2017-10-13 Drilling/Alteration No Violations Noted Workover rig on location. Well not staged for production. All activity within containment. No production equipment on location.
2725651 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted I arrive at the site at 12:49. The weather conditions are cloudy skies, cold and windy with snow showers and temperatures in the upper 30's. Crown Oilfield was the CHK subcontractor in the process of welding and installing natural gas production pipeline. The site was quite muddy due to recent precipitation events. Hydraulic fracturing (stimulation) operations recently have been completed on the Lucy Bra 7H well. Hydraulic fracturing plugs have not yet been drilled out and this well has not yet been flowed back. Rig mats and secondary containment used during the frac remain in place. There were some areas of compromised integrity observed in the liner which extend from under the rig mats. I observed a rainbow in color petroleum sheen in water near the wellhead in the center of the pad. I conducted field screening of specific conductance (conductivity) in water on the pad surface and in secondary containment at the site. I recorded elevated readings in the well cellar, in openings on the rig mats where the ma
2730054 Primary Facility 2018-05-15 Routine/Complete Inspection No Violations Noted Arrived at 13:20. Weather: storm coming. Rig mats still on location. Well not in production but plumbed for production. No violations observed at the time of this inspection.
2750465 Primary Facility 2018-06-27 Follow-up Inspection No Violations Noted I arrived at the site at 12:03. The weather conditions are cloudy skies , breezy with light rain falling and temperatures in the mid 60's. There was no activity or personnel at the site during the inspection. The Lucy Bra 7H well is in production. Rig mats used during completions operations are staged in the corner of the pad adjacent to the site perimeter berm on the fill slope side of the pad. I departed from the site at 13:47.
2816849 Primary Facility 2018-12-14 Routine/Complete Inspection No Violations Noted Routine inspection completed to assess site conditions. The 7H well is staged for production. One GPU unit is present with sand separator. One double-walled fiberglass produced water tank is present without separate containment.

The pad side slopes, the topsoil stockpile, and the area around the access road within the LOD are stable and well-vegetated. Two PCSMs are present and are holding water. Historical precipitation records show that there has not been measurable precipitation within seven days prior to this inspection. The E&S log on site also notes that the PCSMs have been holding water for some time. The department recommends assessing the functionality of the PCSMs.

No E&S issues noted. Site is stable. No violations noted.

For data sources see[9]

References